W58RGZ-16-R-02710_0004_Conformed_Copy.pdf
PDF 27 MB Posted
- Solicitation number
- W58RGZ-16-R-0271
About this file
Conformed RFP through Amendment 0004 with all attachments embedded.
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-16-R-0271
X
2018MAR09
2018MAY2103:00pm
DOA1
2018MAR09 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
CHARLENE BOOTH
(256)955-7361
CCAM-AM-A
CHARLENE.C.BOOTH.CIV@MAIL.MIL
1 240
X 1
X 7 X 173
X 174 X 175 X 176
X 183
X 184
X 185
X 228
X 229
X 237
X 240
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: CHARLENE BOOTH
Buyer Office Symbol/Telephone Number: CCAM-AM-A/(256)955-7361
Type of Contract 1: Time and Materials
Type of Contract 2: Cost Plus Fixed Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
A-1. GENERAL INFORMATION
a. The U.S. Army Contracting Command-Redstone (ACC-Redstone) is issuing this Request for Proposal (RFP) W58RGZ-16-R-0271 on a best value full and open competition basis for the U.S. Army Aviation and Missile Command (AMCOM) AMCOM Logistics Center (ALC) Aviation Field
Maintenance (AFM) requirement for worldwide aviation maintenance. This requirement includes, but is not limited to, passback maintenance support to Combat Aviation Brigades (CABs), various Level of Effort (LOE) support to CABs and other units, installation of aircraft modifications under Modification Work Orders, and efforts to Reset an aircraft to a Fully Mission Capable (FMC) condition. Requirements by geographic region are both inside the Continental Unites States (CONUS) and Outside the Continental United States (OCONUS). See the
Performance Work Statement (PWS) at Section C and Attachment 0001 of the RFP for the complete requirement.
b. The requirement is for a base year and seven one-year options.
c. The contract resulting from this RFP will be a hybrid contract consisting of Firm Fixed Priced (FFP) effort, Time and Materials (T&M) effort, Cost Plus Fixed Fee Level of Effort (CPFF LOE) and Cost (No Fee) effort.
d. It is expected that the contract resulting from this solicitation will be awarded on or about 21 December 2018 with a transition in period to begin 21 December 2018 and full performance to start on or before 22 March 2019. Offerors are requested to specify a proposal validity date of at least 21 December 2018.
e. An initial sources sought notice for this requirement was posted on the Federal Business Opportunities website on 18 February 2015. A follow-on sources sought notice was posted on 14 April 2016, with One-On-Ones held with industry on 19 May 2016. Question and Answers from the One-On-Ones were posted to the Federal Business Opportunities website 29 July 2016. A third sources sought notice was posted on
1 May 2017. These postings provided information or sought information concerning the interest and availability of capable contractors to provide contract support.
f. A Draft Request for Proposal (DRFP) was issued for this effort on 13 September 2017. The Questions and Answers from the DRAFT RFP were posted to the Federal Business Opportunities website on 13 February 2018. There have been numerous changes to the Request For
Proposal and to the Attachments. It is incumbent upon the offeror to review this formal RFP in its entirety prior to submitting a proposal.
g. The Pre-Solicitation Synopsis W58RGZ-16-R-0271 was posted to the Federal Business Opportunities website on 19 December 2017 for the purpose of providing planning information for the AFM II West Region Requirement.
h. The applicable North American Industry Classification System (NAICS) code for this acquisition is 488190 - Other Support Activities for Air Transportation. The Small Business Size Standard is $32.5 Million in average annual receipts. A size standard is the largest that a concern can be and still qualify as a small business for Federal Government programs. The process used to calculate average annual average receipts can be found in 13 CFR Section 121.104.
i. It has been determined that this services acquisition is subject to the Service Contract Labor Standards (formerly known as the
Service Contract Act of 1965), as amended. A wage determination(s), is provided at Attachment 0037 along with Collective Bargaining
Agreements (Joint Base Lewis McChord, Fort Irwin, Fort Carson and Holloman AFB).
j. Access to classified material may be required for some portions of the PWS. The successful offeror shall comply with the requirements of the Contract Security Classification Specification (DD Form 254) at Attachment 0003 to this solicitation.
k. It is the Army's desire to pursue a rapid path to award for this effort. A best value approach will be used in the source selection
2 240
REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
to be conducted using formal source selection procedures and considering the factors of Technical, Past Performance, Cost/Price and
Small Business Participation. Proposals will be evaluated and a competitive range will be established for efficiency purposes.
A-2. COMMUNICATION
a. This RFP should not be discussed with any Government employee except the Contracting Officer, Ms. Nicole Sullivan-Williams, or her representative, Mr. Larry E. Davis. Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of any award resulting from this competitive solicitation.
b. The Government's contractual representative for this RFP is Mr. Larry E. Davis. Your comments and/or questions should be directed, in writing, to this individual via email at usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil. Please submit your questions utilizing the format provided in Attachment 0036 no later than 23 March 2018. The date and time for receipt of offers will not be extended due to untimely submission of questions by offerors. Indicate the RFP number, W58RGZ-16-R-0271, on all correspondence pertaining to this solicitation. Note that verbal questions/comments will not be entertained. ALL questions and comments, regardless of method submitted, and the Government's answers thereto, shall be posted on the Federal Business Opportunities web site (www.fbo.gov ). Contractor identification and information will be sanitized from the questions before posting.
A-3. PRE-PROPOSAL CONFERENCE, SITE VISIT(S) and PAST PERFORMANCE
a. A pre - proposal conference for the RFP is scheduled at Fort Campbell, KY for the purpose of providing an overview of this solicitation. The following schedule is provided:
(1) Conference date: 05 April 2018.
(2) Submit the names and Social Security Numbers of all attendees to Mr. Larry E. Davis via email at usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil no later than 02 April 2018. Please limit attendees to three per company.
(3) See Attachment 0042 Pre-Proposal Conference and Site Visit Agenda for further details on times and locations.
(4) Nothing that is said at the Pre-Proposal Conference (or the concurrent site visit) will qualify or modify the terms of the solicitation unless it is formally amended in writing per FAR 15.206(c).
b. A site visit for viewing the representative work site(s) is scheduled for 05 April 2018 in conjunction with the Pre-Proposal
Conference.
c. Section L of this RFP requires offerors to mail the Past Performance Questionnaire at Attachment 0020 of this solicitation to all contractual, technical, and administrative points of contact for each contract submitted in the Past Performance proposal. Offerors must ensure that this is accomplished in sufficient time for assessments to be completed and submitted to the Contracting Officer prior to the date and time set for receipt of proposals.
d. See Section L for further instructions to offerors.
A-4. PERIODS OF PERFORMANCE
a. Following are the periods of performance for the AFM services:
Transition: 1-90 days after contract effective date
Base Year: 1-365 days after completion of transition period
Option Year 1: 366-731 days after completion of transition period (leap year)
Option Year 2: 732-1096 days after completion of transition period
Option Year 3: 1097-1461 days after completion of transition period
Option Year 4: 1462-1826 days after completion of transition period
Option Year 5: 1827-2191 days after completion of transition period
Option Year 6: 2192-2556 days after completion of transition period
Option Year 7: 2557-2921 days after completion of transition period
Extension of Services: 2922-3101 days after completion of transition period.
b. The requirements set forth in the RFP are currently supported by other DoD contracts. The Government is not liable for any equitable adjustment should the anticipated start dates not begin upon the dates represented.
A-5. AVAILABILITY OF FUNDS
3 240
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Funds are not presently available for this requirement. However, they are programmed for FY18/FY19.
A-6. DELIVERY OF PROPOSALS
It is much preferred that the contractor coordinate hand delivery with Larry E. Davis at (256) 313-3709; or
"mailto:larry.e.davis68.civ@mail.mil" . However, mailing to the following address is acceptable:
ACC-Redstone
CCAM-AMA
Building 5303, 3rd Floor
Attn: Larry E. Davis
Martin Road
Redstone Arsenal, AL 35898-5280
The due date for proposals is 30 April 2018 at 3:00 P.M. CST.
SHOULD THE OFFEROR CHOOSE TO MAIL THE PROPOSAL, NOTIFICATION MUST BE MADE TO MR. LARRY E. DAVIS EITHER BY E-MAIL AT
"mailto:larry.e.davis68.civ@mail.mil" OR TELEPHONE AT (256) 313-3709 NO LATER THAN THE CLOSING DATE AND TIME OF THIS REQUEST FOR
PROPOSAL. NOTIFICATION SHALL INCLUDE OFFEROR NAME AND POINT OF CONTACT, DATE PROPOSAL WAS MAILED, AND ANY TRACKING INFORMATION
AVAILABLE. MAILED PROPOSALS MUST BE ON REDSTONE ARSENAL BY THE DUE DATE AND TIME OR THEY WILL BE CONSIDERED LATE PER FAR 52.214-7.
*** END OF NARRATIVE A0001 ***
A-1. This Amendment 0001 is issued to update Attachment 0035, Section M Evaluation Factors for Award (West) within SECTION J LIST OF
ATTACHMENTS to affect the following change:
A. Page 9 of 11, updated note a. under Overall Cost/Price Proposal Evaluation to change the reference from Section M-2.D.3. ______________________________________
COST/PRICE to Section L-24.3.d VOLUME IV - COST/PRICE.
A-2. As a result of the above change, the closing date remains unchanged at 30 April 2018.
A-3. Except as provided herein, all other terms and conditions remain unchanged and in full force and effect.
*** END OF NARRATIVE A0002 ***
A-1. This Amendment 0002 is issued to make the following changes to Solicitation W58RGZ-16-R-0271:
a. Update Section B narrative B001 within CLINs 2010AA, 2110AA, 2210AA, 2310AA, 2410AA, 2510AA, 2610AA, and 2710AA to remove "The total CPFF amount on this CLIN shall be based on a maximum number of 445,440 labor hours" language.
b. Update Section B narrative B001 within CLINs 2020AA, 2120AA, 2220AA, 2320AA, 2420AA, 2520AA, 2620AA, and 2720AA to remove "The total T&M amount on this CLIN shall be based on a maximum number of 1,730,924 labor hours" language.
c. Update Section B narrative B001 within CLINs 2030AA, 2130AA, 2230AA, 2330AA, 2430AA, 2530AA, 2630AA, and 2730AA to remove "The total CPFF amount on this CLIN shall be based on a maximum number of 49,920 labor hours" language.
d. Update Section B narrative B001 within CLINs 2040AA, 2140AA, 2240AA, 2340AA, 2440AA, 2540AA, 2640AA, and 2740AA to remove "The total CPFF amount on this CLIN shall be based on a maximum number of 86,400 labor hours" language.
e. Update Section B narrative B001 within Materials & Non-Materials CLINs 2011AA, 2021AA, 2031AA, 2041AA, 2111AA, 2121AA, 2131AA, 2141AA, 2211AA, 2221AA, 2231AA, 2241AA, 2311AA, 2321AA, 2331AA, 2341AA, 2411AA, 2421AA, 2431AA, 2441AA, 2511AA, 2521AA, 2531AA, 2541AA, 2611A, 2621AA, 2631AA, 2641AA, 2711AA, 2721AA, 2731AA, and 2741AA to incorporate the following language: "This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance."
f. Update Attachment 0004, Areas of Responsibility (West) within Section J to version dated 9 April 2018.
g. Update Attachment 0007, AFM Skill Classification Crosswalk (West) within Section J.
h. Update Attachment 0010, AFM West T&M Labor Rate Tables within Section J to version dated 19 April 2018.
4 240
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
i. Update Attachment 0019, CONUS Position Descriptions (West) within Section J to version dated 20 April 2018.
j. Update Attachment 0024, Capabilities and Missions by Location (West) within Section J to version dated 11 April 2018.
k. Update Attachment 0027, Section L Instructions, Conditions, and Notices to Offerors (West) within Section J to version dated 25
April 2018.
l. Update Attachment 0035, Section M Evaluations Factors for Award (West) within Section J to version dated 25 April 2018.
m. Update Attachment 0036, Final Industry Questions and Answers (West) within Section J.
n. Incorporate Attachment 0043, Site Visit Questions and Answers into Section J.
A-2. Incorporate FAR clause 52.222-62, Paid Sick Leave Under Executive Order 13706 into Section I.
A-3. COMMUNICATION
This RFP should not be discussed with any Government employee except the Contracting Officer, Ms. Nicole Sullivan-Williams, or her representatives, Mr. Larry E. Davis or Ms. Charlene Booth. Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of any award resulting from this competitive solicitation.
A-4. As a result of the above changes, the closing date is extended from 30 April 2018 to 21 May 2018.
A-5. DELIVERY OF PROPOSALS
It is much preferred that the contractor coordinate hand delivery with Larry E. Davis at (256) 313-3709 or Charlene C. Booth at (256)
955-7361, or by email usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil. However, mailing to the following address is acceptable:
ACC-Redstone
CCAM-AMA
Building 5303, 3rd Floor
Attn: Larry E. Davis
Martin Road
Redstone Arsenal, AL 35898-5280
The due date for proposals is 21 May 2018 at 3:00 P.M. CST.
SHOULD THE OFFEROR CHOOSE TO MAIL THE PROPOSAL, NOTIFICATION MUST BE MADE TO MR. LARRY E. DAVIS AT (256) 313-3709 OR MS. CHARLENE C.
BOOTH AT (256) 955-7361 OR BY E-MAIL AT usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil. NO LATER THAN THE CLOSING DATE AND TIME OF THIS
REQUEST FOR PROPOSAL. NOTIFICATION SHALL INCLUDE OFFEROR NAME AND POINT OF CONTACT, DATE PROPOSAL WAS MAILED, AND ANY TRACKING
INFORMATION AVAILABLE. MAILED PROPOSALS MUST BE ON REDSTONE ARSENAL BY THE DUE DATE AND TIME OR THEY WILL BE CONSIDERED LATE PER FAR
52.214-7.
A-6. Except as provided herein, all other terms and conditions remain unchanged and in full force and effect.
*** END OF NARRATIVE A0003 ***
A-1. This Amendment 0003 is issued to make the following changes to Solicitation W58RGZ-16-R-0271:
a. Update Attachment 0001, AFM Performance Work Statement (West) within Section J to version dated 1 May 2018.
b. Update Attachment 0006, Additional CDRL Information (West) within Section J to version dated 1 May 2018.
5 240
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-2. As a result of the above change, the closing date remains unchanged at 21 May 2018.
A-3. Except as provided herein, all other terms and conditions remain unchanged and in full force and effect.
*** END OF NARRATIVE A0004 ***
A-1. This amendment 0004 is issued to make the following changes to Solicitation W58RGZ-16-R-0271:
a. Updates Attachment 0004, Areas of Responsibility (West), within Section J to version dated 8 May 2018.
b. Updates Attachment 0036, Final Industry Questions (West), within Section J to version dated 8 May 2018. Industry questions
109 through 115 have been added.
A-2. As a result of the above change, the closing date remains unchanged at 21 May 2018.
A-3. Except as provided herein, all other terms and conditions remain unchanged and in full force and effect.
*** END OF NARRATIVE A0005 ***
6 240
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
2000 AFM-WEST PROGRAM MANAGEMENT
2000AA AFM-WEST PROGRAM MANAGEMENT - BASE YEAR 1 LO $ _______________________________________ __________________
SERVICE REQUESTED: AFM-WEST PROGRAM MANAGEMENT
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall perform the management of the
AFM-West region [identified in Attachment 0004, Areas of Responsibility for Aviation Field Maintenance
(AFM) West Region] of all maintenance, logistics and related services provided IAW Contract Attachment
0001, Performance Work Statement (PWS) Aviation Field
Maintenance. All work will be performed in Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN includes all cost necessary for the overarching regional management of the applicable region and shall not include any direct or indirect cost for specific performance of efforts defined within other CLINs (i.e. Reset, MWO, LRC/CAB
Passback/TSC, Contingency Ops, FMS Support, Transition In, and Transition Out).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraphs: 3.
Performance Requirements, 3.1 Program Management
Requirements, and 3.1.1. Regional Program Management
(PM) Personnel.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
7 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Section G-2 for billing information.
(End of narrative F001)
2010 AFM-WEST RESET
2010AA AFM-WEST RESET - BASE YEAR 1 LO $ __________________________ __________________
SERVICE REQUESTED: AFM-WEST RESET
The contractor shall perform Reset to Rotary Wing
Aircraft supported by PEO Aviation IAW Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Reset effort will be captured under the Cost (No Fee) Materials/Non-Materials Reset CLIN.
Any travel costs related to the Reset effort will be captured under the Cost (No Fee) Travel Reset CLIN.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraph:
3.2.3.1 Reset
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
8 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2011 AFM-W MATERIALS/NON-MATERIALS
2011AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2010A 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
This CLIN is for Material/Non-Material costs in support of CLIN 2010AA (AFM-West RESET - CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Reset effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Materials/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2012 AFM-WEST TRAVEL
2012AA AFM-WEST TRAVEL (SPT FOR 2010AA) - BASE YEAR 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-WEST TRAVEL
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Travel costs in support of CLIN
2010AA (AFM-West RESET - CPFF LOE).
The contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required.
Travel expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
10 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2020 MWO, LRC/CAB PASSBACK/TSC
2020AA AFM-WEST MWO, LRC/CAB PASSBACK/TSC - BASE YE 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: MWO, LRC/CAB PASSBACK/TSC
The contractor shall, when authorized by the
Contracting Officer, provide technical support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities within the AFM-West region and other locations as required.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the T&M effort will be captured under the
Cost (No Fee) Materials/Non-Materials T&M CLIN. Any travel costs related to the T&M effort will be captured under the Cost (No Fee) Travel T&M CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
This CLIN shall utilize the rates found at Attachment
0010 - AFM West T&M Labor Rate Tables. The rates in the Attachment 0010 AFM West T&M Labor Rate Tables represent fixed billing rates by labor category for the prime contractor and separate fixed billing rates by labor category for each subcontractor, division, 11 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
subsidiary, and affiliate of the prime contractor.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2021 AFM-W MATERIALS/NON-MATERIALS
2021AA AFM-W MATERIALS/NON MATERIALS (SPT FOR 2020A 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
This CLIN is for Material/Non-Material costs in support of CLIN 2020AA (AFM-West MWO, LRC/CAB
Passback/TSC - T&M).
This CLIN will capture materials/non-materials costs in support of the T&M effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and any applicable
12 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2022 AFM-WEST TRAVEL
2022AA AFM-WEST TRAVEL (SPT FOR 2020AA) - BASE YEAR 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-WEST TRAVEL
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Travel costs in support of CLIN
2020AA (AFM-West MWO, LRC/CAB Passback/TSC - T&M).
The contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required.
Travel expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
13 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2023 OCONUS DIFFERENTIALS/ALW
2023AA AFM-W OCONUS DIFFERENTIALS/ALW (SPT FOR 2020AA) - _________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: OCONUS DIFFERENTIALS/ALW
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for OCONUS Differentials/Allowances in support of CLIN 2020AA (AFM-West MWO, LRC/CAB
Passback/TSC - T&M).
This CLIN includes any additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the
Department of State Standardized Regulations as
Danger Pay Post Hardship Differential, Living Quarter
Allowances, and Cost of Living Allowances, as well as
Rest and Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
OCONUS Differentials/Allowance expenses and any applicable indirect/burden expenses will be
14 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2030 AFM-WEST CONTINGENCY OPS
2030AA AFM-WEST CONTINGENCY OPS - BASE YEAR 1 LO $ ____________________________________ __________________
SERVICE REQUESTED: AFM-WEST CONTINGENCY OPS
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
Contingency Ops on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment
0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Materials/Non-
15 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Materials Contingency Ops CLIN. Any travel costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Travel Contingency
Ops CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
16 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
2031 AFM-W MATERIALS/NON-MATERIALS
2031AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2030A 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
This CLIN is for Material/Non-Material costs in support of CLIN 2030AA (AFM-West Contingency Ops -
CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Contingency Ops effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and
DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
17 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
2032 AFM-WEST TRAVEL
2032AA AFM-WEST TRAVEL (SPT FOR 2030AA) - BASE YEAR 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-WEST TRAVEL
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Travel costs in support of CLIN
2030AA (AFM-West Contingency Ops - CPFF LOE).
The contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required.
Travel expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
18 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
2033 OCONUS DIFFERENTIALS/ALW
2033AA AFM-W OCONUS DIFFERENTIALS/ALW (SPT FOR 2030AA) - _________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: OCONUS DIFFERENTIALS/ALW
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for OCONUS Differentials/Allowances in support of CLIN 2030AA (AFM-West Contingency Ops
CPFF LOE).
This CLIN includes any additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the
Department of State Standardized Regulations as
Danger Pay Post Hardship Differential, Living Quarter
Allowances, and Cost of Living Allowances, as well as
Rest and Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
OCONUS Differentials/Allowance expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
19 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
2040 AFM-WEST FMS SUPPORT
2040AA AFM-WEST FMS SUPPORT - BASE YEAR 1 LO $ ________________________________ __________________
SERVICE REQUESTED: AFM-WEST FMS SUPPORT
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
FMS Support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and
Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the FMS Support effort will be captured under the Cost (No Fee) Materials/Non-Materials FMS
Support CLIN. Any travel costs related to the FMS
Support effort will be captured under the Cost (No
Fee) Travel FMS Support CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
20 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2041 AFM-W MATERIALS/NON-MATERIALS
2041AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2040A 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
This CLIN is for Material/Non-Material costs in support of CLIN 2040AA (AFM-West FMS Support - CPFF
LOE).
This CLIN will capture materials/non-materials costs in support of the FMS Support effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
21 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2042 AFM-WEST TRAVEL
2042AA AFM-WEST TRAVEL (SPT FOR 2040AA) - BASE YEAR 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: AFM-WEST TRAVEL
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Travel costs in support of CLIN
2040AA (AFM-West FMS Support - CPFF LOE).
The contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required.
Travel expenses and applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
22 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2043 OCONUS DIFFERENTIALS/ALW
2043AA AFM-W OCONUS DIFFERENTIALS/ALW (SPT FOR 2040AA) - _________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: OCONUS DIFFERENTIALS/ALW
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for OCONUS Differentials/Allowances in support of CLIN 2040AA (AFM-West FMS Support - CPFF
LOE).
This CLIN includes any additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the
Department of State Standardized Regulations as
Danger Pay Post Hardship Differential, Living Quarter
Allowances, and Cost of Living Allowances, as well as
Rest and Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
OCONUS Differentials/Allowance expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
23 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0365
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2050 CONTRACTOR MANPOWER REPORTING
2050AA AFM-W CONTRACTOR MANPOWER REPORTING - BASE YEAR 1 LO $ ** NSP ** _______________________________________________ __________________
SERVICE REQUESTED: CONTRACTOR MANPOWER REPORTING
This CLIN is used for the collection and reporting of
Contractor Manpower Reporting data as described in
Attachment 0001, AFM PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government Fiscal Year (1
October - 30 September) and must be reported by 31
October of each calendar year.
** This item shall not be separately priced. Costs related to this item shall be included in the FFP
Program Management CLIN. **
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraph:
3.1.9.11
24 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 30-SEP-2019
Period of Performance: Date of contract award - 30
September 2019.
(End of narrative F001)
2060 TRANSITION IN
2060AA AFM-W TRANSITION IN 1 LO $ ___________________ __________________
SERVICE REQUESTED: TRANSITION IN
CLIN CONTRACT TYPE:
Firm Fixed Price
This FFP CLIN is for TRANSITION IN and is inclusive of all costs necessary to transition personnel into the region IAW Attachment 0001, AFM PWS. The FFP is inclusive of all per diem, travel, and transition costs necessary to accomplish the transition in. All cost anticipated by the contractor to accomplish transition into the work area shall be included, but should not include any direct labor support costs planned to be incurred once full performance begins.
This CLIN will be issued on a Firm Fixed basis.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraphs:
4.5 Transition, and 4.5.1 Transition-In
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
25 240
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0090
Period of Performance: 1-90 days after contract effective date.
(End of narrative F001)
2070 TRANSITION OUT
2070AA AFM-W TRANSITION OUT - BASE YEAR 1 LO $ ________________________________ __________________
SERVICE REQUESTED: TRANSITION OUT
CLIN CONTRACT TYPE:
Firm Fixed Price
This FFP CLIN is for TRANSITION OUT and is inclusive of all costs necessary to transition personnel out of a region IAW Attachment 0001, AFM PWS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.