W58RGZ-16-R-0271-0002.pdf
PDF 109 KB Posted
- Solicitation number
- W58RGZ-16-R-0271
About this file
W58RGZ-16-R-0271-0002
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Time and Materials
0002 2018APR26
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
LARRY DAVIS
EMAIL: LARRY.E.DAVIS68.CIV@MAIL.MIL
W58RGZ-16-R-0271
2018MAR09
X
X 2018MAY21 03:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 72
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: LARRY DAVIS
Buyer Office Symbol/Telephone Number: CCAM-AM-A/(256)313-3709
Type of Contract 1: Time and Materials
Type of Contract 2: Cost Plus Fixed Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
A-1. This Amendment 0002 is issued to make the following changes to Solicitation W58RGZ-16-R-0271:
a. Update Section B narrative B001 within CLINs 2010AA, 2110AA, 2210AA, 2310AA, 2410AA, 2510AA, 2610AA, and 2710AA to remove "The total CPFF amount on this CLIN shall be based on a maximum number of 445,440 labor hours" language.
b. Update Section B narrative B001 within CLINs 2020AA, 2120AA, 2220AA, 2320AA, 2420AA, 2520AA, 2620AA, and 2720AA to remove "The total T&M amount on this CLIN shall be based on a maximum number of 1,730,924 labor hours" language.
c. Update Section B narrative B001 within CLINs 2030AA, 2130AA, 2230AA, 2330AA, 2430AA, 2530AA, 2630AA, and 2730AA to remove "The total CPFF amount on this CLIN shall be based on a maximum number of 49,920 labor hours" language.
d. Update Section B narrative B001 within CLINs 2040AA, 2140AA, 2240AA, 2340AA, 2440AA, 2540AA, 2640AA, and 2740AA to remove "The total CPFF amount on this CLIN shall be based on a maximum number of 86,400 labor hours" language.
e. Update Section B narrative B001 within Materials & Non-Materials CLINs 2011AA, 2021AA, 2031AA, 2041AA, 2111AA, 2121AA, 2131AA, 2141AA, 2211AA, 2221AA, 2231AA, 2241AA, 2311AA, 2321AA, 2331AA, 2341AA, 2411AA, 2421AA, 2431AA, 2441AA, 2511AA, 2521AA, 2531AA, 2541AA, 2611A, 2621AA, 2631AA, 2641AA, 2711AA, 2721AA, 2731AA, and 2741AA to incorporate the following language: "This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance."
f. Update Attachment 0004, Areas of Responsibility (West) within Section J to version dated 9 April 2018.
g. Update Attachment 0007, AFM Skill Classification Crosswalk (West) within Section J.
h. Update Attachment 0010, AFM West T&M Labor Rate Tables within Section J to version dated 19 April 2018.
i. Update Attachment 0019, CONUS Position Descriptions (West) within Section J to version dated 20 April 2018.
j. Update Attachment 0024, Capabilities and Missions by Location (West) within Section J to version dated 11 April 2018.
k. Update Attachment 0027, Section L Instructions, Conditions, and Notices to Offerors (West) within Section J to version dated 25
April 2018.
l. Update Attachment 0035, Section M Evaluations Factors for Award (West) within Section J to version dated 25 April 2018.
m. Update Attachment 0036, Final Industry Questions and Answers (West) within Section J.
n. Incorporate Attachment 0043, Site Visit Questions and Answers into Section J.
A-2. Incorporate FAR clause 52.222-62, Paid Sick Leave Under Executive Order 13706 into Section I.
A-3. COMMUNICATION
This RFP should not be discussed with any Government employee except the Contracting Officer, Ms. Nicole Sullivan-Williams, or her representatives, Mr. Larry E. Davis or Ms. Charlene Booth. Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of any award resulting from this competitive solicitation.
A-4. As a result of the above changes, the closing date is extended from 30 April 2018 to 21 May 2018.
A-5. DELIVERY OF PROPOSALS
2 72
W58RGZ-16-R-0271 0002
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
It is much preferred that the contractor coordinate hand delivery with Larry E. Davis at (256) 313-3709 or Charlene C. Booth at (256)
955-7361, or by email usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil. However, mailing to the following address is acceptable:
ACC-Redstone
CCAM-AMA
Building 5303, 3rd Floor
Attn: Larry E. Davis
Martin Road
Redstone Arsenal, AL 35898-5280
The due date for proposals is 21 May 2018 at 3:00 P.M. CST.
SHOULD THE OFFEROR CHOOSE TO MAIL THE PROPOSAL, NOTIFICATION MUST BE MADE TO MR. LARRY E. DAVIS AT (256) 313-3709 OR MS. CHARLENE C.
BOOTH AT (256) 955-7361 OR BY E-MAIL AT usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil. NO LATER THAN THE CLOSING DATE AND TIME OF THIS
REQUEST FOR PROPOSAL. NOTIFICATION SHALL INCLUDE OFFEROR NAME AND POINT OF CONTACT, DATE PROPOSAL WAS MAILED, AND ANY TRACKING
INFORMATION AVAILABLE. MAILED PROPOSALS MUST BE ON REDSTONE ARSENAL BY THE DUE DATE AND TIME OR THEY WILL BE CONSIDERED LATE PER FAR
52.214-7.
A-6. Except as provided herein, all other terms and conditions remain unchanged and in full force and effect.
*** END OF NARRATIVE A0003 ***
3 72
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
2010AA AFM-WEST RESET - BASE YEAR 1 LO $ __________________________ __________________
SERVICE REQUESTED: AFM-WEST RESET
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall perform Reset to Rotary Wing
Aircraft supported by PEO Aviation IAW Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Reset effort will be captured under the Cost (No Fee) Materials/Non-Materials Reset CLIN.
Any travel costs related to the Reset effort will be captured under the Cost (No Fee) Travel Reset CLIN.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraph:
3.2.3.1 Reset
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
4 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
2011AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2010AA) - ________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2010AA (AFM-West RESET - CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Reset effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Materials/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2020AA AFM-WEST MWO, LRC/CAB PASSBACK/TSC - BASE YEAR 1 LO $ ______________________________________________ __________________
SERVICE REQUESTED: MWO, LRC/CAB PASSBACK/TSC
CLIN CONTRACT TYPE:
5 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Time and Materials
The contractor shall, when authorized by the
Contracting Officer, provide technical support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities within the AFM-West region and other locations as required.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the T&M effort will be captured under the
Cost (No Fee) Materials/Non-Materials T&M CLIN. Any travel costs related to the T&M effort will be captured under the Cost (No Fee) Travel T&M CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
This CLIN shall utilize the rates found at Attachment
0010 - AFM West T&M Labor Rate Tables. The rates in the Attachment 0010 AFM West T&M Labor Rate Tables represent fixed billing rates by labor category for the prime contractor and separate fixed billing rates by labor category for each subcontractor, division, subsidiary, and affiliate of the prime contractor.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
6 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Section G-2 for billing information.
(End of narrative F001)
2021AA AFM-W MATERIALS/NON MATERIALS (SPT FOR 2020AA) - ________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2020AA (AFM-West MWO, LRC/CAB
Passback/TSC - T&M).
This CLIN will capture materials/non-materials costs in support of the T&M effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
7 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
2030AA AFM-WEST CONTINGENCY OPS - BASE YEAR 1 LO $ ____________________________________ __________________
SERVICE REQUESTED: AFM-WEST CONTINGENCY OPS
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
Contingency Ops on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment
0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Materials/Non-
Materials Contingency Ops CLIN. Any travel costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Travel Contingency
Ops CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
8 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2031AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2030AA) - ________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2030AA (AFM-West Contingency Ops -
CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Contingency Ops effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and
DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2040AA AFM-WEST FMS SUPPORT - BASE YEAR 1 LO $ ________________________________ __________________
SERVICE REQUESTED: AFM-WEST FMS SUPPORT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
FMS Support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and
Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the FMS Support effort will be captured under the Cost (No Fee) Materials/Non-Materials FMS
Support CLIN. Any travel costs related to the FMS
Support effort will be captured under the Cost (No
Fee) Travel FMS Support CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
10 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2041AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2040AA) - ________________________________________________
BASE YEAR 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2040AA (AFM-West FMS Support - CPFF
LOE).
This CLIN will capture materials/non-materials costs in support of the FMS Support effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
11 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 1-365 days after completion of
Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2110AA AFM-WEST RESET - OPTION YEAR 1 1 LO $ ______________________________ __________________
SERVICE REQUESTED: AFM-WEST RESET
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall perform Reset to Rotary Wing
Aircraft supported by PEO Aviation IAW Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Reset effort will be captured under the Cost (No Fee) Materials/Non-Materials Reset CLIN.
Any travel costs related to the Reset effort will be captured under the Cost (No Fee) Travel Reset CLIN.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
12 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraph:
3.2.3.1 Reset.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2111AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2110AA) - ________________________________________________
OP YEAR 1 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2110AA (AFM-West RESET - CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Reset effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Materials/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
13 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2120AA AFM-WEST MWO, LRC/CAB PASSBACK/TSC - OPTION YEAR 1 1 LO $ __________________________________________________ __________________
SERVICE REQUESTED: MWO, LRC/CAB PASSBACK/TSC
CLIN CONTRACT TYPE:
Time and Materials
The contractor shall, when authorized by the
Contracting Officer, provide technical support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities within the AFM-West region and other locations as required.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the T&M effort will be captured under the
Cost (No Fee) Materials/Non-Materials T&M CLIN. Any travel costs related to the T&M effort will be captured under the Cost (No Fee) Travel T&M CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
This CLIN shall utilize the rates found at Attachment
0010 - AFM West T&M Labor Rate Tables. The rates in the Attachment 0010 AFM West T&M Labor Rate Tables represent fixed billing rates by labor category for the prime contractor and separate fixed billing rates by labor category for each subcontractor, division, subsidiary, and affiliate of the prime contractor.
See Section H-1 for Option Exercise Provisions.
14 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2121AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2120AA) - ________________________________________________
OP YEAR 1 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2120AA (AFM-West MWO, LRC/CAB
Passback/TSC - T&M).
This CLIN will capture materials/non-materials costs in support of the T&M effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
15 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2130AA AFM-WEST CONTINGENCY OPS - OPTION YEAR 1 1 LO $ ________________________________________ __________________
SERVICE REQUESTED: AFM-WEST CONTINGENCY OPS
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
Contingency Ops on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment
0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Materials/Non-
Materials Contingency Ops CLIN. Any travel costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Travel Contingency
Ops CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
16 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2131AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2130AA) - ________________________________________________
OP YEAR 1 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2130AA (AFM-West Contingency Ops -
CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Contingency Ops effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and
DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
17 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2140AA AFM-WEST FMS SUPPORT - OPTION YEAR 1 1 LO $ ____________________________________ __________________
SERVICE REQUESTED: AFM-WEST FMS SUPPORT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
FMS Support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and
Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the FMS Support effort will be captured under the Cost (No Fee) Materials/Non-Materials FMS
Support CLIN. Any travel costs related to the FMS
Support effort will be captured under the Cost (No
Fee) Travel FMS Support CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
18 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2141AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2140AA) - ________________________________________________
OP YEAR 1 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIAL/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2140AA (AFM-West FMS Support - CPFF
LOE).
This CLIN will capture materials/non-materials costs in support of the FMS Support effort including but
19 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 366-731 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2210AA AFM-WEST RESET - OPTION YEAR 2 1 LO $ ______________________________ __________________
SERVICE REQUESTED: AFM-WEST RESET
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall perform Reset to Rotary Wing
Aircraft supported by PEO Aviation IAW Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Reset effort will be captured under the Cost (No Fee) Materials/Non-Materials Reset CLIN.
Any travel costs related to the Reset effort will be captured under the Cost (No Fee) Travel Reset CLIN.
20 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance, Paragraph:
3.2.3.1 Reset.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 732-1096 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2211AA AFM-WEST MATERIAL/NON-MATERIAL (SPT FOR 2210AA) - _________________________________________________
OP YEAR 2 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIAL/NON-MATERIAL
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2210AA (AFM-West RESET - CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Reset effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
21 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Materials/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 732-1096 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2220AA AFM-WEST MWO, LRC/CAB PASSBACK/TSC - OPTION YEAR 2 1 LO $ __________________________________________________ __________________
SERVICE REQUESTED: MWO, LRC/CAB PASSBACK/TSC
CLIN CONTRACT TYPE:
Time and Materials
The contractor shall, when authorized by the
Contracting Officer, provide technical support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment
0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By Location West. All work will be performed in Government furnished facilities within the AFM-West region and other locations as required.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the T&M effort will be captured under the
Cost (No Fee) Materials/Non-Materials T&M CLIN. Any travel costs related to the T&M effort will be captured under the Cost (No Fee) Travel T&M CLIN.
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not
22 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
This CLIN shall utilize the rates found at Attachment
0010 - AFM West T&M Labor Rate Tables. The rates in the Attachment 0010 AFM West T&M Labor Rate Tables represent fixed billing rates by labor category for the prime contractor and separate fixed billing rates by labor category for each subcontractor, division, subsidiary, and affiliate of the prime contractor.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 732-1096 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2221AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2220AA) - ________________________________________________
OP YEAR 2 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
This CLIN is for Material/Non-Material costs in support of CLIN 2220AA (AFM-West MWO, LRC/CAB
Passback/TSC - T&M).
This CLIN will capture materials/non-materials costs in support of the T&M effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental
23 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 732-1096 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2230AA AFM-WEST CONTINGENCY OPS - OPTION YEAR 2 1 LO $ ________________________________________ __________________
SERVICE REQUESTED: AFM-WEST CONTINGENCY OPS
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
Contingency Ops on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment
0015, Technical Bulletins and Technical Manuals West, and Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Materials/Non-
Materials Contingency Ops CLIN. Any travel costs related to the Contingency Ops effort will be captured under the Cost (No Fee) Travel Contingency
Ops CLIN.
24 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
This CLIN includes base compensation paid to the contractor's employees and does not include any
OCONUS differentials/allowance costs. OCONUS differentials/allowances are defined as additional allowances and benefits paid to employees for assignment to foreign areas in excess of an employee's base compensation, including but not limited to those referred to by the Department of
State Standardized Regulations as Danger Pay Post
Hardship Differential, Living Quarter Allowances, and
Cost of Living Allowances, as well as Rest and
Relaxation allowances, sign-on bonuses, completion bonuses, housing, foreign services premiums or allowances, miscellaneous bonuses, benefits, and allowances, etc.
Estimated Cost $_________________________
Facilities Capital Cost of Money
Fixed Fee $_________________________
Total CPFF $_________________________
See Section H-1, 6. Level of Effort (Cost Plus Fixed
Fee Term Option).
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 732-1096 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2231AA AFM-W MATERIALS/NON-MATERIALS (SPT FOR 2230AA) - ________________________________________________
OP YEAR 2 1 LO $ _________ __________________
SERVICE REQUESTED: AFM-W MATERIALS/NON-MATERIALS
CLIN CONTRACT TYPE:
Cost No Fee
25 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
This CLIN is for Material/Non-Material costs in support of CLIN 2230AA (AFM-West Contingency Ops -
CPFF LOE).
This CLIN will capture materials/non-materials costs in support of the Contingency Ops effort including but not limited to the following: Physicals, passports, visas, tool box shipping, HAZMAT, crating material, equipment rental (i.e. cranes/forklifts), port ops material (i.e. straps, blocking, calibration, rental vehicles), and general maintenance material as required. This CLIN will include any country-specific employer costs not identified above, such as employer taxes and fees and
DBA insurance.
Material/Non-Material expenses and any applicable indirect/burden expenses will be reimbursed at cost.
See Section H-1 for Option Exercise Provisions.
(End of narrative B001)
In Accordance With Attachment 0001, Performance Work
Statement, Aviation Field Maintenance.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Period of Performance: 732-1096 days after completion of Transition In.
See Section G-2 for billing information.
(End of narrative F001)
2240AA AFM-W FMS SUPPORT - OPTION YEAR 2 1 LO $ _________________________________ __________________
SERVICE REQUESTED: AFM-WEST FMS SUPPORT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
The contractor shall, when authorized by the
Contracting Officer, provide technical support for
FMS Support on an as-needed and/or on-call basis to include, but not limited to, the efforts identified in Attachment 0001, AFM PWS, Attachment 0015, Technical Bulletins and Technical Manuals West, and
Attachment 0024, Capabilities and Missions By
Location West. All work will be performed in
26 72
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Government furnished facilities or in other locations as required within the AFM-West region.
This CLIN shall include prime and subcontract labor costs only. Any materials/non-materials costs related to the FMS Support effort will be captured under the Cost (No Fee) Materials/Non-Materials FMS
Support CLIN. Any travel costs related to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.