Aviation Field Maintenance Services (AFM II West)

Closed Pre-Solicitation Posted

Solicitation number
W58RGZ-16-R-0271
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
488190 Other Support Activities for Air Transportation
PSC
Not on record
Place of performance
Conus and Oconus locations are required, United States

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

This announcement serves as Amendment 0004 to the FORMAL Request for Proposal  W58RGZ-16-R-0271 issued on 9 March 2018. W58RGZ-16-R-0271 0004 updates Attachment 0004, Area of Responsibility and Attachment 0036, Final Industry Questions (West), within Section J - List of Attachments.

As a result of the above changes, the closing date remains unchanged at 21 May 2018.

Update #8 ·

This announcement serves as Amendment 0003 to the FORMAL Request for Proposal (RFP) W58RGZ-16-R-0271 that was issued on 9 March 2018 .

This Amendment 0003 is issued to update Attachment 0001 AFM Performance Work Statement (West) and Attachment 0006 Additional CDRL Information (West) within SECTION J - LIST OF ATTACHMENTS.

As a result of the above change, the closing date remains unchanged at 21 May 2018.

Update #7 ·

This announcement serves as Amendment 0002 to the FORMAL Request for Proposal (RFP) W58RGZ-16-R-0271 that was issued on 9 March 2018.


This Amendment 0002 is issued to update the Section B narratives, revise/add the following attachments in Section J: 0004, 0007, 0010, 0019, 0027, 0035, 0036, 0043, and formally extend the closing date from 30 April 2018 to 21 May 2018.


 

Update #6 ·

This announcement serves as SPECIAL NOTICE to the FORMAL Request for Proposal (RFP) W58RGZ-16-R-0271 that was issued on 9 March 2018.

This SPECIAL NOTICE is in response to the questions received form industry concerning the Formal RFP W58RGZ-16-R-0271. It is the Government's intent to provide answers to industry questions in the forthcoming release of Amendment 0002 to RFP W58RGZ-16-R-0271.

The closing date for Formal RFP W58RGZ-16-R-0271 will be extended from 30 April 2018 to 21 May 2018 in the forthcoming Amendment 0002 also.

Update #5 ·

This announcement serves as Amendment 0001 to the FORMAL Request for Proposal (RFP) W58RGZ-16-R-0271 that was issued on 9 March 2018.

This Amendment 0001 is issued to update Attachment 0035 Section M Evaluation Factors for Award (West) within SECTION J - LIST OF ATTACHMENTS.

As a result of the above change, the closing date remains unchanged at 30 April 2018.

Update #4 ·

 This announcement serves as a SPECIAL NOTICE for the FORMAL Request for Proposal (RFP) W58RGZ-16-R-0271.


The Army Contracting Command-Redstone Arsenal (ACC-RSA) on behalf of the United States Army Aviation and Missile Command (AMCOM) Logistics Center (ALC) Aviation Field Maintenance (AFM) Program, executed by the Aviation Field Maintenance Directorate (AFMD) is hereby releasing this FORMAL RFP for the West region. The AFM Program enables sustainable unit and equipment readiness by augmenting aviation field level maintenance capabilities and responding to aviation maintenance surge requirements throughout the world. This includes Army aviation Reset mission and the delivery of Reset aircraft in both Continental United States (CONUS) and Outside Continental United States (OCONUS) locations and the application of Modification Work Orders (MWOs). The AFM Program also provides aviation maintenance pass-back support for Combat Aviation Brigades (CABs) at numerous Logistic Readiness Centers - Aviation (LRC-A) sites.


The applicable North American Industry Classification System (NAICS) code for this acquisition is 488190 - Other Support Activities for Air Transportation. The Small Business Size Standard is $32.5 Million in average annual receipts. A size standard is the largest that a concern can be and still qualify as a small business for Federal Government programs. The process used to calculate average annual average receipts can be found in 13 CFR Section 121.104.


The Government proposes to award a "C" type contract that will include a base year and seven one-year options. The contract will be awarded using a best value Tradeoff approach.


Please provide questions or comments on the FORMAL RFP and all Attachments/Exhibits NLT 23 March 2017 5:00 p.m. (US Central Time) to usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil


 

Update #3 ·

This is a SPECIAL NOTICE to the DRAFT Request for Proposal (RFP) W58RGZ-16-R-0271 that was posted on 13 September 2017. This SPECIAL NOTICE is for the purpose of posting questions and answers gathered from the Draft RFP that was released to industry.


Please note that the Government anticipates releasing the Formal Request for Proposal W58RGZ-16-R-0271 on or before 08 March 2018.


 

Update #2 ·

This announcement serves as a PRE-SOLICITATION SYNOPSIS NOTICE for Request for Proposal (RFP) AFM II West Region, W58RGZ-16-R-0271. This PRE-SOLICITATION SYNOPSIS NOTICE is for information and planning purposes only and does not constitute a formal Request for Proposal.

The Army Contracting Command-Redstone Arsenal (ACC-RSA) on behalf of the United States Army Aviation and Missile Command (AMCOM) Logistics Center (ALC) Aviation Field Maintenance (AFM) Program, executed by the Aviation Field Maintenance Directorate (AFMD) is hereby anticipating the release of the formal Request for Proposal on or about 19 January 2018. The AFM Program enables sustainable unit and equipment readiness by augmenting aviation field level maintenance capabilities and responding to aviation maintenance surge requirements throughout the world. This includes the Army Aviation Reset Mission and the application of aircraft modifications. The AFM Program also provides aviation maintenance pass-back support for Combat Aviation Brigades (CABs) at numerous Logistic Readiness Centers - Aviation (LRC-A) sites.

The applicable North American Industry Classification System (NAICS) code for this acquisition is 488190 - Other Support Activities for Air Transportation. The Small Business Size Standard is $32.5 Million in average annual receipts. A size standard is the largest that a concern can be and still qualify as a small business for Federal Government programs. The process used to calculate average annual average receipts can be found in 13 CFR Section 121.104.

This PRE-SOLICITATION SYNOPSIS NOTICE is not to be construed as a commitment by the Government. This is not a solicitation and does not obligate the Government to issue an RFP, nor will the Government be liable for any costs involved for submission of Information in response to this notice. The Government plans to award a hybrid "C" type contract with Firm-Fixed-Price, Time-and-Materials, Cost Plus Fixed-Fee Level of Effort, and Cost No Fee Contract Line Item Numbers that will include up to a 90-day transition-in period, a base year and seven

Update #1 ·

This announcement serves as a PRE-SOLICITATION SYNOPSIS NOTICE for DRAFT
Request for Proposal (RFP) W58RGZ-16-R-0271. This PRE-SOLICITATION SYNOPSIS NOTICE is for information and planning purposes only and does not constitute a formal Request for Proposal.

The Army Contracting Command-Redstone Arsenal (ACC-RSA) on behalf of the United States Army Aviation and Missile Command (AMCOM) Logistics Center (ALC) Aviation Field Maintenance (AFM) Program, executed by the Aviation Field Maintenance Directorate (AFMD) is hereby releasing this DRAFT RFP for the West region. The AFM Program enables sustainable unit and equipment readiness by augmenting aviation field level maintenance capabilities and responding to aviation maintenance surge requirements throughout the world. This includes Army aviation Reset mission and the delivery of Reset aircraft in both Continental United States (CONUS) and Outside Continental United States (OCONUS) locations and the application of Modification Work Orders (MWOs). The AFM Program also provides aviation maintenance pass-back support for Combat Aviation Brigades (CABs) at numerous Logistic Readiness Centers - Aviation (LRC-A) sites.


The applicable North American Industry Classification System (NAICS) code for this acquisition is 488190 - Other Support Activities for Air Transportation. The Small Business Size Standard is $32.5 Million in average annual receipts. A size standard is the largest that a concern can be and still qualify as a small business for Federal Government programs. The process used to calculate average annual average receipts can be found in 13 CFR Section 121.104.


This PRE-SOLICITATION SYNOPSIS NOTICE is not to be construed as a commitment by the Government. This is not a solicitation and does not obligate the Government to issue an RFP, nor will the Government be liable for any costs involved for submission of
Information in response to this notice. The Government proposes to award a "C" type contract that will include a base year and seven one-year options. The contract will be awarded using a best value Tradeoff approach.


Please provide questions or comments on the DRAFT RFP and all Attachments/Exhibits NLT 27 September 2017 5:00 p.m. (US Central Time) to usarmy.redstone.acc.mbx.acc-rsa-afmii@mail.mil to allow time for the Government to prepare and post responses prior to release of the Formal RFP.

Files

File Type Posted
Attachment_0036_-_Final_Industry_Questions_(West).pdf PDF
Attachment_0004_-_Areas_of_Responsibility_(West).pdf PDF
W58RGZ-16-R-02710_0004_Conformed_Copy.pdf PDF
W58RGZ-16-R-0271-0004.pdf PDF
W58RGZ-16-R-0271-0003.pdf PDF
Attachment_0001_-_AFM_Performance_Work_Statement_(West).pdf PDF
Attachment_0006_-_Additional_CDRL_Information_(West).pdf PDF
W58RGZ-16-R-0271-0003_(Conformed_with_Attachments).pdf PDF
Attachment_0043_-_Site_Visit_Q&A.pdf PDF
Attachment_0024_-_Capabilities_and_Missions_By_Location_(West).pdf PDF
Attachment_0010_-_AFM_West_TM_Labor_Rate_Tables.xlsx XLSX spreadsheet
Attachment_0019_-_CONUS_Position_Descriptions_(West).pdf PDF
Attachment_0007_-_AFM__Skill_Classification_Crosswalk_(West).xlsx XLSX spreadsheet
W58RGZ-16-R-0271_(Conformed_with_Attachments).pdf PDF
W58RGZ-16-R-0271-0002.pdf PDF
Attachment_0027_-_Section_L_Instructions.pdf PDF
Attachment_0035_-_Section_M_Evaluation_Factors_For_Award_(West).pdf PDF
Attachment_0036_-_Final_Industry_Questions_and_Answers_(West).pdf PDF
Attachment_0004_-_Areas_of_Responsibility_(West).pdf PDF
Attachment_0035_-_Section_M_Evaluation_Factors_For_Award_(West).pdf PDF
W58RGZ-16-R-0271-0001.pdf PDF
Attachment_0025_-_OCONUS_Position_Descriptions_(West).pdf PDF
Attachment_0012-_Section_C_Description_Specifications_Work_Statement_(West).pdf PDF
Attachment_0019_-_CONUS_Position_Descriptions_(West).pdf PDF
Attachment_0029_-_GFP_RILEY.xlsx XLSX spreadsheet
Attachment_0003_-_DD_Form_254,_Contract_Security_Classification_Guide_(West).pdf PDF
Attachment_0042_-_Pre_Proposal_Conference_Agenda_(West).pdf PDF
Attachment_0034_-_GFP_-_LEWIS.xlsx XLSX spreadsheet
Attachment_0022_-_APSL_Listing_(West).pdf PDF
Attachment_0026_-_Section_H_Special_Contract_Requirements_(West).pdf PDF
Attachment_0015_-_Technical_Bulletins_and_Technical_Manuals_(West).pdf PDF
Attachment_0039_-_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_(West).pdf PDF
Attachment_0007_-_AFM_Skill_Classification_Crosswalk_(West).xlsx XLSX spreadsheet
Attachment_0024_-_Capabilities_and_Missions_By_Location_(West).pdf PDF
Attachment_0031_-_GFP_CARSON.xlsx XLSX spreadsheet
Attachment_0023_-_Section_G_Contract_Administration_Data_(West).pdf PDF
Attachment_0014_-_Section_D_Packaging_and_Marking_(West).pdf PDF
Attachment_0040_-_Draft_Quality_Assurance_Surveillance_Plan_(West).pdf PDF
Attachment_0036_-_Industry_Questions_(West).xlsx XLSX spreadsheet
Attachment_0001_-_AFM_Performance_Work_Statement_(West).pdf PDF
Attachment_0017_-_Section_E_Inspection_and_Acceptance_(West).pdf PDF
Attachment_0016_-_Contractor_Performance_Metrics_(West).pdf PDF
Attachment_0033_-_GFP_Part_2_HOOD.xlsx XLSX spreadsheet
Attachment_0032_-_GFP_Part_1_HOOD.xlsx XLSX spreadsheet
Attachment_0027_-_Section_L_Instructions,_Conditions,_and_Notices_to_Offerors_(West).pdf PDF
Attachment_0002_-_Document_Summary_List_(West).pdf PDF
W58RGZ-16-R-0271.pdf PDF
Attachment_0028_-_Additional_OCONUS_Requirements_(West).pdf PDF
Attachment_0004_-_Areas_of_Responsibility_(West).pdf PDF
Attachment_0035_-_Section_M_Evaluation_Factors_For_Award_(West).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors