Solicitation Amendment W50S6Y25BA0040001 SF 30 CWF.pdf

PDF 763 KB Posted

Attached to
F-35 CONSTRUCT COMBINED WEAPONS FACILITY Federal contract opportunity
Solicitation number
W50S6Y-25-B-A004
Issued by
Department of the Army Florida Army National Guard

About this file

This document is a Standard Form 30 (SF 30) Amendment to a Solicitation for the F-35 Construct Combined Weapons Facility (CWF) project. The amendment changes the response due date from March 20, 2025 to March 27, 2025 and updates several key contract details. The project, located at the 125th Fighter Wing Jacksonville International Airport, involves constructing a 22,696 square-foot Consolidated Weapons Facility that includes a Hangar Bay for Load Crew Training, back-shops for Weapons and Release Systems Shops, administrative offices, classrooms, break rooms, and restrooms.

The solicitation (W50S6Y-25-B-A004) is 100% set aside for small businesses with a project magnitude between $10M to $25M. The estimated Period of Performance is 720 days after Notice to Proceed, and the contract will be awarded as a Firm Fixed Price. The project also includes environmental remediation, demolition of existing structures (B1404, B1422, B1022), and installation of asphalt and concrete pavements. The amendment incorporates updated wage determinations and answers to requests for information, and extends the bid opening date to accommodate additional RFIs received.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 CONSTRUCT COMBINED WEAPONS FACILITY, newest first.
File Type Posted
LSGA239001_CWF IFB Abstract 1419-KO.pdf PDF
Bid Submission Day Sign-In Sheet-3APR25.pdf PDF
RFI-0028 REV01-HANGAR DOOR OPENING CLARIFICATIONS AND DETAILS.pdf PDF
RFI-0086 Set 5 Q-3 Louvers locations_Parsons response.pdf PDF
Q-A set 05G_W50S6Y25BA004 3.28.25 Final.pdf PDF
Solicitation Amendment W50S6Y25BA0040002 SF 30 CWF.pdf PDF
Q-A set 04Gp2_W50S6Y25BA004.pdf PDF
CWF Spec 08 34 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 04G_W50S6Y25BA004 3.18.25.pdf PDF
RFI-0057 Q-A-29 set 04_Parsons response.pdf PDF
CWF Spec 08 36 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 03G_W50S6Y25BA004 3.11.25.pdf PDF
CWF - RFI 0007 ATTACHMENT CU101.pdf PDF
CWF Spec Section 08 34 16 VERTICAL LIFT FABRIC HANGAR DOOR.pdf PDF
Missing Page from 25BA004 Sign In Sheet.pdf PDF
Q-A set 02G_W50S6Y25BA004 3.7.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.8.pdf PDF
CWF - RFI 0007.pdf PDF
CWF - RFI 0009.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.9.pdf PDF
25BA004 Pre-Bid Site Visit PP.pptx PPTX presentation
GeoTech Rpt-Terracon.pdf PDF
Asbestos -Lead Paint Survey-Terracon.pdf PDF
CWF Pre-Proposal minutes.pdf PDF
CWF Sign In Sheet.pdf PDF
Q-A set 01G_W50S6Y25BA004 2.28.25.pdf PDF
Attach-1_JAXF35CWF-100P SPECIFICATIONS.pdf PDF
Solicitation - W50S6Y25BA004 Construct CWF.pdf PDF
Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3.pdf PDF
Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted.pdf PDF
Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted.pdf PDF
Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted.pdf PDF
Attach-9_125FW Form 2 Access request (Aug 2023).pdf PDF
Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3.pdf PDF
Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3.pdf PDF
Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 14

0001 10 MAR 2025 LSGA239001

W50S6Y

W7M2 USPFO ACTIVITY FLANG 125

KO FOR FLANG DO NOT DELETE, 14300 FANG DR

JACKSONVILLE, FL 32218-7933

UNITED STATES

FREDERICK CHERRY, EMAIL: FREDERICK.CHERRY.1@US.AF.MIL TELEPHONE: 904-

741-7405

SCD: PAS:

W50S6Y25BA004

17 FEB 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

THE PURPOSE OF THIS AMENDMENT IS TO CORRECT POP ERRORS IN SEC 00 21 13 ITEM 1.1 AND CLAUSE 52.211-10 TO STATE 720 DAYS. THE BID OPENING HAS BEEN EXTENDED DUE TO ADDITIONAL RFIS RECEIVED. THE WAGE DETERMINATION/DAVIS BACON HAS BEEN UPDATED, SEE SEC 00 72 00 FOR MOST CURRENT.

THE Q&AS ARE ALSO INCORPORATED BY REFERENCE TO THE SOLICITATION/CONTRACT.

MATTHEW MICHAEL

18 MAR 2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 20 Mar 2025 27 Mar 2025

Section 00 21 13 - Instructions to Bidders

Miscellaneous text in this section has been modified to:

1. Description of the Project:

1.1. In support of the F-35 Conversion, this project consists of constructing a Consolidated Weapons Facility with a Hangar Bay for Load Crew Training, back-shops for Weapons and Release Systems Shops, admin/offices, classroom, break room, and restroom. The project will also include environmental remediation of the project site, demolition of existing structures (B1404, B1422, B1022), and installation of asphalt and concrete pavements. The CWF will be located on the Flight Line, west of the Sunshades.

The estimated Period of Performance (PoP) is 720 days after issue of the Notice to Proceed (NTP). The project site is located at the 125th FW Jacksonville International Airport (JIA), 14300 Fang Drive, Maintenance Hangar Bldg. 1001, Jacksonville (JAX), Florida (FL). Additive line items are intended for Communications and Advantor IDS Systems. The anticipated acquisition method will be to solicit this via Sealed Bidding Invitation for Bid (IFB) and it is intended to award this contract as a Firm Fixed Price contract.

2. Instructions to Bidders:

2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S6Y-24-B- A004 entitled F-35 Construct Combined Weapons Facility (CWF), Project Number LSGA239001, at 125th FW JIA, 14300 Fang Drive, Jacksonville, FL.

2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

2.3. This solicitation is set-aside 100% for small businesses.

3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:

W50S6Y25BA0040001

1077434387.CIV

Highlight

3.1. A pre-bid / site visit conference will be conducted on for the purposes of 26 February 25 at 0930 briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at Location To Be Determined prior to meeting. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.

3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the FW Form 2 for all attendees to Captain Jason Davis at the following email addresses: michael.rivera.

8@us.af.mil, jason.davis.65@us.af.mil, & 125msg.msc.baseaccess@us.af.mil.

***Completed Attachment-9-125FW Form 2 Installation Access Request

3.3. This information must be provided in advance, , in order to No Later than Five Calendar Days ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the pre-bid conference.

This information will be provided to the Base Security Forces who will authorize your entrance to the site.

3.4. Visitors must pick up their passes at the Installation's Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable.

Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

4.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Subject Line: Reference No. SOLICITATION W50S6Y-25-B-A004 Email: 125msg.msc.contracting@us.af.mil, frederick.cherry.1@us.af.mil, mark.penwell.1@us.af.mil, and matthew.j.michael2.civ@army.mil

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry: _______________ From: ______________________________ Company Name: _____________________________ Address:_____________________________________________________________________ Phone Number: _____________________________ Email address: __________________________________________________________________ Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

W50S6Y25BA0040001

4.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or bids, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.

4.3. All questions and requests for information (RFI) must be received NOT LATER THAN the SEVENTH WORKING DAY PRIOR to original scheduled bid opening. OFFERORS ARE STRONGLY

ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.

4.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.

However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov.

4.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.

4.6. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition related information for all Federal agencies. Interested bidders /offerors must register with SAM.gov before accessing the system.

4.7. Amendments, if/when issued will be posted to https://www.SAM.gov for electronic downloading.

This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.

5. BID REPOSITORY AND BID OPENING:

5.1. A bid repository is provided for hand carried bids and is located at:

125th Logistics Readiness Squadron Building 1006, Rm 118

14300 FANG DRIVE

JACKSONVILLE F L 32218-7933

5.2. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor's pass to enter the facility and should allow time to accomplish this. See instructions for obtaining access to the base in the Site Visit instruction. Follow the same instructions for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid "late" in accordance with FAR 14.304.

5.3. The bid opening will occur at the time and date specified in Block 13 of the SF1442. All interested offerors and their major subcontractors are encouraged to attend the bid opening.

6. WAGE DETERMINATION:

Construction Wage Rates are applicable to this project as shown in Section 00 72 00 General Conditions.

7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:

This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

8. CLAUSES:

Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

9. DISPOSITION OF UNSUCCESSFUL BIDS:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.

10. OFFERORS QUALIFICATIONS:

To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

11. List of Brand Name or Sole Source Justifications posted on SAM.gov.

1. Brand Name (FAR 6)_BestCores-A-COR-KO

2. (FAR 6)_Advantor-B-COR-KOBrand Name

3. (FAR 6)_Monaco-C-COR-KOBrand Name

4. (FAR 6)_Metasys-D-COR-KOBrand Name

12. NG Agency Protest Program

NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing.

An agency protest may be filed with either the Contracting Officer or the NG Agency's Protest Decision Authority, but not both, in accordance with NG protest procedures.

To be timely, the protests must be filed with the periods specified in FAR 33.103. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below:

National Guard Bureau Office of the Director of Acquisitions/ Head of Contracting Activity

ATTN: NGB-AQ-O

111 S. George Mason Dr.

Arlington, VA 22204 Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@army.mil

All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See FAR clause 52.233-2.

NG Public-facing, general Protest information is found at: https://www.nationalguard.mil/Leadership /Joint-Staff/Special-Staff/Director-of-Acquisitions/

End of Section 00 21 13

Section 00 70 00 - Conditions of the Contract

Additional Information/Notes

The following clauses were modified:

52.211-10Commencement, Prosecution, and Completion of Work.Apr 1984 hereby reads as follows:

As prescribed in , insert the following clause in solicitations and contracts when a fixed-price 11.404(b) construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 30 Calendar Days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . The 720 Calendar Days After Notice to Proceed time stated for completion shall include final cleanup of the premises.

(End of clause)

Section 00 72 00 - General Conditions

Miscellaneous text in this section has been modified to:

ATTACHMENTS

The following Attachments will be provided to you as separate documents not directly incorporated into the solicitation itself. Below is a list of all the documents you will be provided separately:

Attach-1_JAXF35CWF-100P SPECIFICATIONS JAN 2025 Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3 JAN2025 Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3 JAN2025 Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3 JAN2025 Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted Attach-9_125FW Form 2 Access request (Aug 2023)

WAGE DETERMINATION: Construction Wage Determination (WD)

In order to access the most applicable and up to date Construction Wage Determination for this requirement, please use the website link provided below to pull the most current wage determination.

You may need to copy and paste the link into the web browser for it to work properly:

Most Current WD: WD-DB FL20250202

Website Link: https://sam.gov/wage-determination/FL20250202/0

In the case if for some reason the link isn't working in general, here is the search criteria we used to decide and chose the type of Wage Determination for this requirement. Only use the information below if you need to complete your own SAM.Gov Construction Wage Determination Search to access the document:

1. State - FL

2. County/Independent City - Duval

3. DBA Construction Type - Building "General Decision Number: FL20250202 03/14/2025

Superseded General Decision Number: FL20240202

State: Florida

Construction Type: Building

County: Duval County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the |

|2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 01/24/2025 2 03/14/2025

ASBE0013-001 05/15/2023

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 28.00 12.30

CARP0702-001 08/01/2020

Rates Fringes

CARPENTER (Includes Drywall Hanging and Form Work)...........$ 23.63 13.30

ELEC0177-004 12/02/2024

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring)..................$ 35.60 14.97

PAID HOLIDAYS: New Year's Day, Memorial Day, 4th of July, Labor Day, Thanksgiving Day, The Day after Thanksgiving and Christmas Day.

* ELEV0049-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 51.11 38.435+a+b

FOOTNOTE:

a. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

b.Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day, Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.

ENGI0487-021 07/01/2016

Rates Fringes

OPERATOR: Crane All Cranes 160 Ton Capacity and Over...........$ 33.05 9.20 All Cranes Over 15 Ton Capacity....................$ 32.05 9.20 OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20

IRON0402-001 10/01/2024

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 28.90 15.66

PLUM0234-006 09/01/2024

Rates Fringes

PLUMBER..........................$ 36.50 17.09

PLUM0234-011 09/01/2024

Rates Fringes

PIPEFITTER (Includes HVAC Pipe and Unit Installation)......$ 36.50 17.09

SFFL0821-004 01/01/2025

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 34.03 23.70

SHEE0435-003 10/01/2024

Rates Fringes

SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 28.75 16.15

A: Holiday Pay: New Year's Day, Memorial Day, July Fourth, Labor Day, Thanksgiving Day, Day after Thanksgiving and Christmas Day

* SUFL2014-010 08/16/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 17.38 ** 0.00

IRONWORKER, REINFORCING..........$ 22.81 11.58

IRONWORKER, STRUCTURAL...........$ 17.66 ** 4.49

LABORER: Common or General, Including Cement Mason Tending...$ 13.62 ** 0.00

LABORER: Pipelayer..............$ 13.73 ** 1.07

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 14.44 ** 1.40

OPERATOR: Bulldozer.............$ 15.40 ** 1.90

OPERATOR: Grader/Blade..........$ 18.97 0.00

OPERATOR: Loader................$ 14.83 ** 1.84

OPERATOR: Roller................$ 14.43 ** 4.78

PAINTER: Brush, Roller and Spray............................$ 15.62 ** 2.05

ROOFER...........................$ 16.99 ** 0.00

TILE SETTER......................$ 18.01 0.00

TRUCK DRIVER: Dump Truck........$ 13.22 ** 2.12

TRUCK DRIVER: Lowboy Truck......$ 14.24 ** 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

File details come from the government source that posted it. Updated .