Q-A set 02G_W50S6Y25BA004 3.7.25.pdf

PDF 425 KB Posted

Attached to
F-35 CONSTRUCT COMBINED WEAPONS FACILITY
Solicitation number
W50S6Y-25-B-A004
Issued by

About this file

This document is a Questions and Answers (Q&A) addendum for Solicitation W50S6Y-25-B-A004, dated 3/7/2025, related to the F-35 Combined Weapons Facility construction project. The Q&A addresses 23 technical inquiries covering various aspects of the project, including grading requirements, security systems, telecommunications infrastructure, concrete paving, epoxy specifications, environmental remediation, and equipment provisions. Key clarifications include government-furnished items such as a portable generator, facility power units, and a 270 VDC solid state converter, as well as contractor responsibilities for installing ductbanks, electrical vaults, and monitoring wells.

The Q&A provides specific technical guidance on project details, such as control joint spacing for concrete paving, verification of monitoring well quantities, fence height specifications, and clarifications on various systems including hangar doors, intrusion detection systems, and visual display units. Notable responses include confirming that QP-8 certification is not required for resinous flooring, degreasing will be required for epoxy applications, and the utility provider will handle primary cabling while the contractor manages ductbank and electrical vault installations. The document helps potential bidders gain clarity on technical specifications and project requirements ahead of the solicitation.

View the file

Other files

File Type Posted
Bid Submission Day Sign-In Sheet-3APR25.pdf PDF
LSGA239001_CWF IFB Abstract 1419-KO.pdf PDF
Q-A set 05G_W50S6Y25BA004 3.28.25 Final.pdf PDF
RFI-0028 REV01-HANGAR DOOR OPENING CLARIFICATIONS AND DETAILS.pdf PDF
RFI-0086 Set 5 Q-3 Louvers locations_Parsons response.pdf PDF
Solicitation Amendment W50S6Y25BA0040002 SF 30 CWF.pdf PDF
Q-A set 04Gp2_W50S6Y25BA004.pdf PDF
CWF Spec 08 34 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 04G_W50S6Y25BA004 3.18.25.pdf PDF
RFI-0057 Q-A-29 set 04_Parsons response.pdf PDF
CWF Spec 08 36 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Solicitation Amendment W50S6Y25BA0040001 SF 30 CWF.pdf PDF
Q-A set 03G_W50S6Y25BA004 3.11.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.8.pdf PDF
CWF Spec Section 08 34 16 VERTICAL LIFT FABRIC HANGAR DOOR.pdf PDF
CWF - RFI 0007 ATTACHMENT CU101.pdf PDF
Missing Page from 25BA004 Sign In Sheet.pdf PDF
CWF - RFI 0007.pdf PDF
CWF - RFI 0009.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.9.pdf PDF
25BA004 Pre-Bid Site Visit PP.pptx PPTX presentation
GeoTech Rpt-Terracon.pdf PDF
CWF Pre-Proposal minutes.pdf PDF
Asbestos -Lead Paint Survey-Terracon.pdf PDF
CWF Sign In Sheet.pdf PDF
Q-A set 01G_W50S6Y25BA004 2.28.25.pdf PDF
Attach-1_JAXF35CWF-100P SPECIFICATIONS.pdf PDF
Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted.pdf PDF
Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted.pdf PDF
Attach-9_125FW Form 2 Access request (Aug 2023).pdf PDF
Solicitation - W50S6Y25BA004 Construct CWF.pdf PDF
Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3.pdf PDF
Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted.pdf PDF
Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3.pdf PDF
Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted.pdf PDF
Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001

Addendum 02 Q&A

Date of QA: 3/7/2025

Ques ons 1:

Ref. CG121: Please clarify any seeding, grassing or landscaping requirements for non-paved areas on project site.

AE Response: Refer to Sheet C-002 in the General Grading Notes, Note 8: 'All graded areas must be revegetated using an approved seed mixture.

Ques on 2:

Ref. EP701, Keynote 26.20.32: Please clarify if portable generator is Govt. furnished, or Contractor furnished. If Contractor furnished, please provide specifica ons.

AE Response, The portable generator will be government furnished.

Ques ons 3:

Ref. TY drawings: Please provide specifica ons for IDS & ESS security systems.

AE Response: REFER TO SHEET TY001, GENERAL NOTE 1. THIS NOTE READS: “contractor must provide conduits, backboxes, and pull-strings for GFGI equipment. Coordinate final loca ons of devices and control panels with the guard prior to submi ng raceways and boxes loca on shop-drawings for government review.”

Refer to specifica on 26 20 00 for requirements of raceway products and installa on.

Ques ons 4:

Ref. CU101 & T-601, Keynote 33.82.14: Please clarify the loca on of the exis ng Telecomm vault, new

Telecomm manhole and new Telecomm duct bank and clearly show them on U lity Layout Plan CU101.

AE Response: See a ached RFI0007 response and a achment.

Ques ons 5:

Ref. CS101, Notes 3 & 4: These notes references “Items 1-5”. Please clarify where in the documents these items are defined.

AE Response: Please refer to the a ached document, TO 33AA14-2-11. The detail included in this document illustrates items 1-5, which are referenced in Notes 3 & 4 on Sheet CS101. See a ached RFI

0009.

Ques ons 6:

Ref. CS101: Please clarify the required spacing of control joints in concrete paving. Do these control joints require sealing?

AE Response: Per UFC 3-250-01 Pavement Design for Roads and Parking Areas, the required spacing of joint is 15 to 20 for concrete pavement and airfield concrete pavement with pavement thicknesses between 9 to 12 mm. Control joints require sealing, per UFC requirements. Awarded Contractor shall submit a join ng plan for approval before construc on.

Ques ons 7:

Can specifica ons be provided for the PVC Fabric Hanger Door System?

AE Response See a ached Spec 08 34 16 ver cal li fabric hanger door.

Ques ons 8:

EPOXY- The spec is for the UFGS 5 Coat spec. This system is a ¼ epoxy mortar with a grout coat and 2 urethane finish coats, NON-ESD. The BOD product, Electriguard ESD is a thin set, ESD system. Are ESD proper es required?

AE Response, please follow the specifica ons not the BOD.

Ques ons 9:

EPOXY- Will Degreasing be required?

AE Response, YES degreasing will be required.

Ques ons 10:

EPOXY- Spec 09 67 23.16 requires a QP-8 cer fica on. Will this cer fica on be required? This will add 25-30% cost to the resinous flooring to use this cer fica on.

AE response, The QP-8 cer fica on is not required for this project.

Ques ons 11:

Please confirm if there are contaminated soils that need remediated.

AE Response refer to appendix E8 a ached.

Ques ons 12:

CS101 sheet note 7 directs us to install monitoring wells matching the quan ty of exis ng condi on.

There are only 3 shown as exis ng. Please confirm only 3 will be required at new condi on.

AE Response: Confirming that in the proposed condi on, three monitoring wells will be installed at the same depth, rela ve distance, and orienta on as those in the exis ng condi ons.

Ques on 13:

During Pre-bid mee ng, the slides stated we are to provide a 6’ or 9’ temporary fence. Please confirm if we should include 6’ or 9’ within our bid proposal.

GOV: fence height of 8’, a commonly available size in the marketplace.

Ques on 14:

A) Please confirm if specifica ons for the Hangar Door will be issued, which are typically the UFGS

08 34 16.20 specifica on for ver cal li fabric doors.

AE: See 08 34 16

B) Per Sheet A-611 Door Schedule under Door Number: 101A in the comment sec on in notes

“IDS”. Please confirm what IDS acronym stands for on this comment.

AE: Intrusion Detec on System (coordinate with Security drawings)

Per the following drawings, keynotes, door and frame types, and door schedule there is a reference to a hangar door.

A-102 Keynotes: 08.34.02 – Hangar Door-AE: It should be: 08 34 16 - Hangar Door A-307 Keynotes: 08.34.02 – Hangar Door- AE: It should be: 08 34 16 - Hangar Door A-311 / Section A6: References (Hoist Up Fabric Hangar Door) AE: this is correct A-612 Door and Frame Type: (Door Type H) – PVC Fabric Hangar Door System A-611 Door Schedule: (Door Number: 101A / Door Type: H / Door Material: Fabric / Hardware: RE: SPECS / Comments: IDS) AE: This is correct There does not appear to be any Hangar Door specifications listed in the B-3 Design Submittal. AE: Refer to section 08 34 16.

Ques ons 15:

The environmental clean-up requirements reference Appendix E.8 and E.9 for contamina on tes ng, excava on procedures, and hazardous material handling. However, these appendices are not included in the provided documenta on. Could you please provide Appendix E.8 and E.9

AE Response see a ached E08 and E.09.

Ques ons 16:

Please clarify where and what visual display units are required to sa sfy drawings and sec on 10 11 00.

There is one display cabinet shown in Room 105, but this tle does not match anything listed in sec on

10 11 00.

AE Response. The visual display unit in Room 105 is a tackboard cabinet with a lockable feature 4’x4’.

Ques on 17:

Please provide a product specifica on for the Hangar door 101A. Drawing A-102 iden fies this door with keynote 08 34 02. Spec sec on 08 34 73 is for sound control door assemblies. We don’t have a sec on

08 34 02.

AE Response. It should be: 08 34 16 - Hangar Door Previously provided

Ques ons 18:

Drawing EP701 Keynote 26.20.33 states “U lity Provider To Provide and Install Primary Cabling”. Please advise if the U lity Provider is also providing and Installing all Primary Ductbank and Electrical Vaults.

AE Response: The U lity Provider is responsible for providing and installing the primary cabling as stated in Keynote 26.20.33. However, the Contractor is responsible for providing and installing all primary ductbank and electrical vaults.

Ques ons 19:

Drawing EP701 Single Line Diagram shows (2) Facility Power Units FPU-1 & FPU-2. It is assumed that these two units are provided by others. Please confirm.

AE response: The two Facility Power Units (FPU-1 & FPU-2) shown on the Single Line Diagram in Drawing

EP701 are Government Furnished.

Ques ons 20:

Drawing EP701 Single Line Diagram shows metering (26.16.01) on each panelboard. Please advise if the meters can be integral to the panel or if the meters need to be external of the panel.

AE response: The meters can be integral to the panelboards.

Ques ons 21:

Specifica ons sec on show a 270 VDC Solid State Converter specifica on 26 35 44. Please advise the loca on and 270VDC size or if provided by others.

AE Response: The 270 VDC Solid State Converter is Government Furnished.

Ques ons 22:

Drawing T601 Telecom Riser states “OSP Connec on TBD”. Please provide the point of connec on for the OSP or provide and es mated distance for the OSP POC.

AE Response: refer to sheet CU101. Contractor is responsible to install new MH and op cal fiber from new MH to telecom entrance facility.

Ques ons 23:

Spec. sec on 41 22 13.14 indicates we are to provide a design for removal, reloca on, and reinstalla on of an exis ng bridge crane. Where is the exis ng bridge crane? There is no bridge crane shown or iden fied in the new architectural or structural plans. There is no bridge crane shown or iden fied in the CD101 Demoli on Plan.

AE Response: There is no new bridge crane. The contractor is responsible for providing an engineering design for as well as the removal, reloca on, and reinstalla on of an exis ng bridge crane.

See response to RFI 0009: “Please refer to the a ached document, TO 33AA14-2-11. The detail included in this document illustrates items 1-5, which are referenced in Notes 3 & 4 on Sheet CS101.”

Ques on

File details come from the government source that posted it. Updated .