This document is an Addendum 04 Part 2 Questions and Answers (Q&A) for Solicitation W50S6Y-25-B-A004 for the Combine Weapons Facility project. The Q&A addresses three key technical clarification points: 1) Confirmation that a chemical vapor barrier is required under the entire building per specification 03 30 00, section 2.4.7, potentially involving multiple vapor barrier layers, 2) Replacement of specification 11 01 50 with 01 35 26 for fall protection requirements referenced in drawings S-109 and S-111, and 3) A government recommendation to relocate the ICD705 head end unit (SFXi) within the administrative area's secure boundary to ensure higher security compliance.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 CONSTRUCT COMBINED WEAPONS FACILITY, newest first.
File Type Posted
LSGA239001_CWF IFB Abstract 1419-KO.pdf PDF
Bid Submission Day Sign-In Sheet-3APR25.pdf PDF
Q-A set 05G_W50S6Y25BA004 3.28.25 Final.pdf PDF
RFI-0028 REV01-HANGAR DOOR OPENING CLARIFICATIONS AND DETAILS.pdf PDF
RFI-0086 Set 5 Q-3 Louvers locations_Parsons response.pdf PDF
Solicitation Amendment W50S6Y25BA0040002 SF 30 CWF.pdf PDF
CWF Spec 08 34 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 04G_W50S6Y25BA004 3.18.25.pdf PDF
Solicitation Amendment W50S6Y25BA0040001 SF 30 CWF.pdf PDF
CWF Spec 08 36 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
RFI-0057 Q-A-29 set 04_Parsons response.pdf PDF
Q-A set 03G_W50S6Y25BA004 3.11.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.9.pdf PDF
CWF - RFI 0007 ATTACHMENT CU101.pdf PDF
CWF Spec Section 08 34 16 VERTICAL LIFT FABRIC HANGAR DOOR.pdf PDF
Missing Page from 25BA004 Sign In Sheet.pdf PDF
Q-A set 02G_W50S6Y25BA004 3.7.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.8.pdf PDF
CWF - RFI 0007.pdf PDF
CWF - RFI 0009.pdf PDF
Q-A set 01G_W50S6Y25BA004 2.28.25.pdf PDF
25BA004 Pre-Bid Site Visit PP.pptx PPTX presentation
GeoTech Rpt-Terracon.pdf PDF
Asbestos -Lead Paint Survey-Terracon.pdf PDF
CWF Pre-Proposal minutes.pdf PDF
CWF Sign In Sheet.pdf PDF
Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3.pdf PDF
Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3.pdf PDF
Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted.pdf PDF
Attach-1_JAXF35CWF-100P SPECIFICATIONS.pdf PDF
Solicitation - W50S6Y25BA004 Construct CWF.pdf PDF
Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3.pdf PDF
Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted.pdf PDF
Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted.pdf PDF
Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted.pdf PDF
Attach-9_125FW Form 2 Access request (Aug 2023).pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001

Addendum 04 part 2 Q&A

Date of Bid Inquiry:

Ques ons 1:

SPEC. SECTION 03 30 00 Page 24 PAR.2.4.7 CALLS FOR A Chemical Vapor Intrusion Barrier beneath a por on of the Hangar 1 slab in Areas A and B as indicated on the Structural Drawings and all of the slab at the AGE. Structural drawing do not show the extent of a Chemical Vapor Intrusion Barrier placement, it does call for 15 Mil Vapor barrier under all building slab. Are we to install both the Chemical Vapor Intrusion Barrier and the 15 Mil Vapor barrier as per Specifica on sec on 03 30 00 THAT indicates we may require use of addi onal layers? Specify the loca on of each Vapor/Chemical shee ng.

AE-Chemical vapor barrier is required under the en re building, per 03 30 00, sec on 2.4.7.

Ques on 48:

Drawings S-109 and S-111 reference a fall restraint system. Can you provide the spec sec on 11 01 50 for the fall protec on shown on S-109.

AE-Please refer to specifica on 01 35 26 Governmental Safety Requirements subsec on 3.5.2, will remove 11 01 50.

Ques on 54:

The drawings display the ICD705 head end unit (SFXi) to be located outside of the secure area boundary, within the Comm Room.

GOV: We recommend that the SFXi be placed within the administra ve area secure area boundary to ensure compliance with the requirement and ensure the system maintains the higher security requirement.