Q-A set 04Gp2_W50S6Y25BA004.pdf
PDF 430 KB Posted
- Attached to
- F-35 CONSTRUCT COMBINED WEAPONS FACILITY Federal contract opportunity
- Solicitation number
- W50S6Y-25-B-A004
About this file
This document is an Addendum 04 Part 2 Questions and Answers (Q&A) for Solicitation W50S6Y-25-B-A004 for the Combine Weapons Facility project. The Q&A addresses three key technical clarification points: 1) Confirmation that a chemical vapor barrier is required under the entire building per specification 03 30 00, section 2.4.7, potentially involving multiple vapor barrier layers, 2) Replacement of specification 11 01 50 with 01 35 26 for fall protection requirements referenced in drawings S-109 and S-111, and 3) A government recommendation to relocate the ICD705 head end unit (SFXi) within the administrative area's secure boundary to ensure higher security compliance.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001
Addendum 04 part 2 Q&A
Date of Bid Inquiry:
Ques ons 1:
SPEC. SECTION 03 30 00 Page 24 PAR.2.4.7 CALLS FOR A Chemical Vapor Intrusion Barrier beneath a por on of the Hangar 1 slab in Areas A and B as indicated on the Structural Drawings and all of the slab at the AGE. Structural drawing do not show the extent of a Chemical Vapor Intrusion Barrier placement, it does call for 15 Mil Vapor barrier under all building slab. Are we to install both the Chemical Vapor Intrusion Barrier and the 15 Mil Vapor barrier as per Specifica on sec on 03 30 00 THAT indicates we may require use of addi onal layers? Specify the loca on of each Vapor/Chemical shee ng.
AE-Chemical vapor barrier is required under the en re building, per 03 30 00, sec on 2.4.7.
Ques on 48:
Drawings S-109 and S-111 reference a fall restraint system. Can you provide the spec sec on 11 01 50 for the fall protec on shown on S-109.
AE-Please refer to specifica on 01 35 26 Governmental Safety Requirements subsec on 3.5.2, will remove 11 01 50.
Ques on 54:
The drawings display the ICD705 head end unit (SFXi) to be located outside of the secure area boundary, within the Comm Room.
GOV: We recommend that the SFXi be placed within the administra ve area secure area boundary to ensure compliance with the requirement and ensure the system maintains the higher security requirement.