This document is an Addendum 05 Questions and Answers (Q&A) for Solicitation W50S6Y-25-B-A004 for the Combined Weapons Facility project. The Q&A addresses seven technical clarification questions from potential bidders, covering topics such as wallcoverings, concrete landings, louver locations, water filters, building slab base material, air barrier specifications, and fire extinguisher cabinet requirements. Key responses include disregarding certain specification sections, confirming subgrade requirements of 1'-0" minimum select structural fill, and specifying that four fire extinguisher cabinets will be semi-recessed in specific corridors while the remaining ten will use bracket mounts.
The document also includes additional information about an overhead hoist with a jack tester that requires removal and reinstallation during the project, and clarification about IDS/ESS (Intrusion Detection System/Electronic Security System) pricing being provided by Advantor under CLIN 0003, with infrastructure support under Base Bid CLIN 0001. The addendum provides technical clarifications to ensure bidders have accurate and up-to-date information for preparing their proposals for this F-35 Combined Weapons Facility construction project at the 125th Fighter Wing Joint Installation, Jacksonville, Florida.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001
Addendum 05 Q&A
Date of Inquiry: 3/28/25
1. There is no wallcovering listed on the finish legend or schedule on I-601. Does sec on 097200 apply to this project? If so please provide loca ons.
AE: There is no wallcovering. Sec on 097200 is not needed.
2. Note 16 on A-103 states to provide a 36”x44” concrete landing at all exterior doors. There is concrete around the en re building per sheets CS101 and AP001. Are landings required to be poured on top of this concrete or does the concrete shown on CS101 suffice? If landings are required in addi on to the concrete shown on CS101 what is the required thickness and reinforcing (if any)?
AE: Disregard note 16 in sheet A-103 and refer to Civil drawings for work to be performed outside of the facility.
3. Louvers LVR-12, LVR-13, LVR-18, LVR-26 and LVR-27 are listed on the Louver Schedule on A-621 but are not labeled or shown on the plans or eleva ons. Are these louvers used? If so please provide plans and/or eleva ons that show required loca ons.
AE: Please see floor plan a ached for louver loca ons (a achment RFI-0086 louvers loca ons)
4. I have been unable to locate water filters shown or noted on the plans. Does sec on 114600 apply to this project? If so where?
AE: Please disregard specifica on 11 46 00. It no longer applies to the current break room design.
5. Is any base material required under the building slab on grade? If so what is the required material type and thickness?
AE: Per typical slab details on S-502, subgrade is 1’-0” minimum select structural fill, per ENGINEERED
FILL notes, sheet S-002.
6. Details A2 & J2/A-321 both note “air barrier (back side of metal panel, typ)”. What type of air barrier is required at this condi on/loca on?
AE: The specified insulated metal panel system includes the back por on of the metal panel classified as an air barrier.
7. The following items are listed on the Toilet Accessories schedule on A-401 but are not labeled on the plans. If these items are required please provide loca ons: Sanitary Napkin Disposal, Mop and
Broom Holder
AE: Please see plans below with requested loca ons:
8. Are cabinets required for all fire ex nguishers? If not please indicate where fire ex nguisher cabinets are required.
AE: There shall be a total of 4 semi-recessed fire ex nguisher cabinets in corridors 107, 124, and 124B.
The other 10 fire ex nguishers in the facility shall use a bracket mount.
Addi onal info related to Fabric Hanger Door Spec 08 34 16.20 Clear Spans
AE: adding revised drawing’s, A-011, A-012 and A-501 (see a achment RFI-0028 REV01 – Hanger Door openings)
Addi onal Info IRT: Ques on 3 from Addendum 02 Q&A asks for the security specs for IDS & ESS systems
GOV: IDS/ESS pricing is provided by Advantor, and is CLIN 0003 of the CWF Solicita on, Infrastructure to support (conduits, backboxes, pull strings etc) is Base Bid CLIN 0001.
Alexander M. Garner
Market Representa ve
Office: 689-323-0545 garner@advantor.com
Addi onal Info for Q-A set 02G ques on 23 Bridge Crane
GOV there is no Bridge crane, this is a Overhead Hoist, which requires removal, then re-install a er building is complete, see addi onal detail and pics below.
The item we need relocated:
Descrip on: Overhead Hoist with Jack Tester
Electrical: Requires one, 20A-30A breaker
References: Sheet CD101, Keynote 02.41.08; Sheet CS101, Keynote 32.13.03
Pics below, associated TO 33AA 14-2-11