25BA004 Pre-Bid Site Visit PP.pptx

PPTX presentation 5 MB Posted

Attached to
F-35 CONSTRUCT COMBINED WEAPONS FACILITY Federal contract opportunity
Solicitation number
W50S6Y-25-B-A004
Issued by
Department of the Army Florida Army National Guard

About this file

This is a pre-bid conference presentation for solicitation W50S6Y-25-B-A004, which outlines requirements for constructing an F-35 Combined Weapons Facility (CWF) for the Florida Army National Guard's 125th Fighter Wing. The project is a 100% small business set-aside with an estimated value between $10-25 million, to be awarded as a firm-fixed-price contract through an Invitation for Bids (IFB) based on lowest price.

The project involves constructing a 22,696 square-foot facility including a hangar bay for load crew training, weapons and release systems shops, administrative offices, classrooms, and other support spaces. Key dates include a pre-bid site visit on February 26, 2025, proposal due date of March 20, 2025, at 10:00 AM EST, and questions due by March 11, 2025. The period of performance is 720 days from Notice to Proceed. Bidders must submit SF1442, pricing for three line items, representations and certifications, and a bid bond of 20% or $3 million (whichever is less). The presentation includes site photos and layout diagrams of the proposed facility location on the flight line, west of the Sunshades.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 CONSTRUCT COMBINED WEAPONS FACILITY, newest first.
File Type Posted
LSGA239001_CWF IFB Abstract 1419-KO.pdf PDF
Bid Submission Day Sign-In Sheet-3APR25.pdf PDF
RFI-0028 REV01-HANGAR DOOR OPENING CLARIFICATIONS AND DETAILS.pdf PDF
RFI-0086 Set 5 Q-3 Louvers locations_Parsons response.pdf PDF
Q-A set 05G_W50S6Y25BA004 3.28.25 Final.pdf PDF
Solicitation Amendment W50S6Y25BA0040002 SF 30 CWF.pdf PDF
Q-A set 04Gp2_W50S6Y25BA004.pdf PDF
CWF Spec 08 34 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 04G_W50S6Y25BA004 3.18.25.pdf PDF
RFI-0057 Q-A-29 set 04_Parsons response.pdf PDF
Solicitation Amendment W50S6Y25BA0040001 SF 30 CWF.pdf PDF
CWF Spec 08 36 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 03G_W50S6Y25BA004 3.11.25.pdf PDF
Q-A set 02G_W50S6Y25BA004 3.7.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.8.pdf PDF
CWF - RFI 0007.pdf PDF
CWF - RFI 0009.pdf PDF
CWF - RFI 0007 ATTACHMENT CU101.pdf PDF
CWF Spec Section 08 34 16 VERTICAL LIFT FABRIC HANGAR DOOR.pdf PDF
Missing Page from 25BA004 Sign In Sheet.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.9.pdf PDF
GeoTech Rpt-Terracon.pdf PDF
Asbestos -Lead Paint Survey-Terracon.pdf PDF
CWF Pre-Proposal minutes.pdf PDF
CWF Sign In Sheet.pdf PDF
Q-A set 01G_W50S6Y25BA004 2.28.25.pdf PDF
Solicitation - W50S6Y25BA004 Construct CWF.pdf PDF
Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3.pdf PDF
Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted.pdf PDF
Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted.pdf PDF
Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted.pdf PDF
Attach-9_125FW Form 2 Access request (Aug 2023).pdf PDF
Attach-1_JAXF35CWF-100P SPECIFICATIONS.pdf PDF
Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3.pdf PDF
Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3.pdf PDF
Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S6Y-25-B-A004

LSGA239001

PRE-Bid CONFERENCE & Site Visit DATE: 26 February 2025 F-35 Combined Weapons Facility (CWF)

INTRODUCTION

Contracting Officer (KO) Matt Michael

Contracting Specialist TSgt Frederick Cherry Mark Penwell (KO)

Contracting Officer Representative (COR) Captain Jason Davis

SYNOPSIS

Construct 236220 Magnitude-$10,000,000 to $25,000,000.

A Firm-fixed Price Contract Will Be Awarded.

100% Small Business Set-aside The Contract Will Be Awarded as IFB, Price only.

SOLICITATION, PLANS

& SPECIFICATIONS

On The Web - https://www.sam.gov Solicitation Attachments Questions & Answers Document Amendments Check Regularly & Refresh Web Page Wage determination final 10 days prior to Bid opening.

Period of Performance= 720 Days NTP

DISCLAIMER

The following is a brief overview of the proposal requirements Offerors Are Strongly Cautioned To Carefully Read The Requirements Of The Solicitation And Comply Accordingly

Important Reminder Invitations for Bids (IFB) do not include Discussion And There May Not Be A Chance For Discussions, Corrections, Or Revised Proposals

WHAT YOU MUST SUBMIT

Offeror portion of SF1442 Section 000110 – Pricing Info 3 Line items All must be priced Section 004500 – Representations and Certifications (R&C) Complete R&Cs in SAM on the web Complete and Return DoD R&Cs in Section 004500.

Bid Bond

Proposal Due Dates Proposal Due: 20 March 2025 @ 1000 am EST Proposal Must Be Signed By Officer Of Your Company No Facsimile Or Electronic Offers Bid Opening: 125 Fighter Wing Location: 125th Logistics Readiness Squadron Building 1006, Room (118 Classroom)

14300 FANG DRIVE

JACKSONVILLE F L 32218-7933

(follow instructions in Section 00100 for base access)

Award The Contractor Whose Proposal:

The Lowest Price Compliance with IFB

Important Reminders 52.219-14 Limitations on Subcontracting Apply

Bid Guarantee IAW FAR 52.228-1: 20% or 3 Mil whichever is less

Construction Wage Rates (WD) updated General Decision #-FL20250202 01/24/2025, Mod 01

How Questions Will Be Handled Questions Must Be Submitted in the format shown in Sec 002113 item 4 preferred.

Submit Questions NLT COB: 11 March 2025 (7 working days prior to bid opening) Questions Received After at discretion of the Contracting Officer may/may not be answered Do Not Call Technical Personnel Or A&E - This Will Delay Getting An Answer.

Answers To Questions All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.sam.gov/ If Necessary, Addendums, Issued By An Amendment, Will Also Be Posted (if Bid opening is extended, Q&A due date is not changed) Check Web Site Regularly And Don’t Forget To Refresh Web Page

Website www.sam.gov (to download IFB, plans and specs and be sure you are registered)

Combined Weapons Facility (CWF)

CWF Contractor Laydown area

CWF Project Site Limits of Construction

CWF Notional Project

Questions Site visit to follow presentation image1.png image2.emf image3.emf image4.emf image5.emf image6.emf image7.emf image8.wmf image9.wmf

File details come from the government source that posted it. Updated .