Q-A set 01G_W50S6Y25BA004 2.28.25.pdf

PDF 434 KB Posted

Attached to
F-35 CONSTRUCT COMBINED WEAPONS FACILITY
Solicitation number
W50S6Y-25-B-A004
Issued by

About this file

This is a Questions and Answers (Q&A) addendum dated February 28, 2025 for solicitation W50S6Y-25-B-A004 regarding the Combined Weapons Facility construction project at Jacksonville IAP, FL.

The Q&A addresses six contractor questions covering: bid submission methods (must be mailed or delivered in person for public bid opening), staffing requirements (Superintendent cannot serve as QC Manager), field office requirements (joint-use facility sufficient), period of performance clarification (720 calendar days confirmed), and requests for additional documentation (Geotechnical Investigation Report and asbestos/lead paint surveys to be provided as attachments). The contracting office provided clear responses to each question, with bid documents to be mailed to 125th FW/MSC at 14300 Fang Drive, Jacksonville IAP, FL 32218-7933 if not hand-delivered.

View the file

Other files

File Type Posted
Bid Submission Day Sign-In Sheet-3APR25.pdf PDF
LSGA239001_CWF IFB Abstract 1419-KO.pdf PDF
Q-A set 05G_W50S6Y25BA004 3.28.25 Final.pdf PDF
RFI-0028 REV01-HANGAR DOOR OPENING CLARIFICATIONS AND DETAILS.pdf PDF
RFI-0086 Set 5 Q-3 Louvers locations_Parsons response.pdf PDF
Solicitation Amendment W50S6Y25BA0040002 SF 30 CWF.pdf PDF
Q-A set 04Gp2_W50S6Y25BA004.pdf PDF
CWF Spec 08 34 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 04G_W50S6Y25BA004 3.18.25.pdf PDF
RFI-0057 Q-A-29 set 04_Parsons response.pdf PDF
CWF Spec 08 36 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Solicitation Amendment W50S6Y25BA0040001 SF 30 CWF.pdf PDF
Q-A set 03G_W50S6Y25BA004 3.11.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.8.pdf PDF
CWF Spec Section 08 34 16 VERTICAL LIFT FABRIC HANGAR DOOR.pdf PDF
CWF - RFI 0007 ATTACHMENT CU101.pdf PDF
Missing Page from 25BA004 Sign In Sheet.pdf PDF
Q-A set 02G_W50S6Y25BA004 3.7.25.pdf PDF
CWF - RFI 0007.pdf PDF
CWF - RFI 0009.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.9.pdf PDF
25BA004 Pre-Bid Site Visit PP.pptx PPTX presentation
GeoTech Rpt-Terracon.pdf PDF
CWF Pre-Proposal minutes.pdf PDF
Asbestos -Lead Paint Survey-Terracon.pdf PDF
CWF Sign In Sheet.pdf PDF
Attach-1_JAXF35CWF-100P SPECIFICATIONS.pdf PDF
Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted.pdf PDF
Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted.pdf PDF
Attach-9_125FW Form 2 Access request (Aug 2023).pdf PDF
Solicitation - W50S6Y25BA004 Construct CWF.pdf PDF
Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3.pdf PDF
Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted.pdf PDF
Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3.pdf PDF
Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted.pdf PDF
Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001

Addendum 01 Q&A

Date: 2/28/2025

Ques ons 1:

Please consider an online submission method either via email, DoD safe, or PIEE to help alleviate extra costs on small contractors that are based outside of Florida.

R: An IFB is designed as a “public Bid Opening” If any Prime GC wishes to mail there “bid documents” and not a end in person, they are responsible to ensure it arrives prior to Date/Time of bid opening to be considered on me. Mail to: 125th FW/MSC, A n: Contrac ng Office-W50S6Y25BA004, 14300 Fang Drive, Jacksonville IAP, FL 32218-7933

Ques on 2:

Ref. Specifica on Sec on 01 35 26, 1.6.1.2: Can Superintendent also func on as SSHO or QC Manager?

R: Government finds efficiency when GC has three main posi ons on-site and is preferred, but to answer the ques on, the Superintendent cannot also be QC

Ques ons 3:

Ref. Specifica on Sec on 01 50 00, 2.2.B: Do we need to provide a separate field office for Architect / Owner? This is a very ght site. Please clarify a suitable loca on for field office and laydown area for this project. For bidding purposes, subcontractors will need to know prior to bid date the proximity of laydown area to job site.

R: 2.2B is not indica ng a separate facility, just appropriately sized for Joint use for mee ngs is intent, See Pre-Bid slides for laydown

Ques ons 4:

Ref. Solicita on, Box 11, Solicita on Sec on 52.211-10 and Specifica on Sec on 00 21 13, 1.1: Box 11 of Solicita on states a Period of Performance of 720 calendar days and the other sec ons states 540 calendar days. Please clarify which is correct.

R: 720 day is POP, SF1442 Box 11 takes precedence

Ques on 5:

Ref. S-001: Please provide Terracon’s Geotechnical Inves ga on Report

R: See a ached Geotechnical report

Ques on 6:

Ref. CD101, Note 5: Please provide asbestos/lead paint surveys for buildings to be demolished.

R: See a ached asbestos/lead paint surveys

File details come from the government source that posted it. Updated .