About this file
This is a Questions and Answers (Q&A) addendum dated February 28, 2025 for solicitation W50S6Y-25-B-A004 regarding the Combined Weapons Facility construction project at Jacksonville IAP, FL.
The Q&A addresses six contractor questions covering: bid submission methods (must be mailed or delivered in person for public bid opening), staffing requirements (Superintendent cannot serve as QC Manager), field office requirements (joint-use facility sufficient), period of performance clarification (720 calendar days confirmed), and requests for additional documentation (Geotechnical Investigation Report and asbestos/lead paint surveys to be provided as attachments). The contracting office provided clear responses to each question, with bid documents to be mailed to 125th FW/MSC at 14300 Fang Drive, Jacksonville IAP, FL 32218-7933 if not hand-delivered.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001
Addendum 01 Q&A
Date: 2/28/2025
Ques ons 1:
Please consider an online submission method either via email, DoD safe, or PIEE to help alleviate extra costs on small contractors that are based outside of Florida.
R: An IFB is designed as a “public Bid Opening” If any Prime GC wishes to mail there “bid documents” and not a end in person, they are responsible to ensure it arrives prior to Date/Time of bid opening to be considered on me. Mail to: 125th FW/MSC, A n: Contrac ng Office-W50S6Y25BA004, 14300 Fang Drive, Jacksonville IAP, FL 32218-7933
Ques on 2:
Ref. Specifica on Sec on 01 35 26, 1.6.1.2: Can Superintendent also func on as SSHO or QC Manager?
R: Government finds efficiency when GC has three main posi ons on-site and is preferred, but to answer the ques on, the Superintendent cannot also be QC
Ques ons 3:
Ref. Specifica on Sec on 01 50 00, 2.2.B: Do we need to provide a separate field office for Architect / Owner? This is a very ght site. Please clarify a suitable loca on for field office and laydown area for this project. For bidding purposes, subcontractors will need to know prior to bid date the proximity of laydown area to job site.
R: 2.2B is not indica ng a separate facility, just appropriately sized for Joint use for mee ngs is intent, See Pre-Bid slides for laydown
Ques ons 4:
Ref. Solicita on, Box 11, Solicita on Sec on 52.211-10 and Specifica on Sec on 00 21 13, 1.1: Box 11 of Solicita on states a Period of Performance of 720 calendar days and the other sec ons states 540 calendar days. Please clarify which is correct.
R: 720 day is POP, SF1442 Box 11 takes precedence
Ques on 5:
Ref. S-001: Please provide Terracon’s Geotechnical Inves ga on Report
R: See a ached Geotechnical report
Ques on 6:
Ref. CD101, Note 5: Please provide asbestos/lead paint surveys for buildings to be demolished.
R: See a ached asbestos/lead paint surveys