This document is a Request for Information (RFI) addendum related to the F-35 Combined Weapons Facility construction project. The RFI addresses specific technical details about telecommunications infrastructure, specifically clarifying the location of an existing telecommunications vault (MH-8) at the corner of Saber Ave and Shooting Star Road, and providing guidance on installing a new manhole within the project limits to connect to the existing duct bank. The response, dated 3/6/2025, was provided by Brian McNuckle and includes instructions for installing a new telecommunications duct from the new manhole to the telecommunications room.

The associated federal contract opportunity (Solicitation W50S6Y-25-B-A004) is a Small Business Set Aside construction project for the Florida National Guard, valued between $10M to $25M. The project involves constructing a 22,696 square-foot Consolidated Weapons Facility at the 125th FW JIA in Jacksonville, Florida, supporting F-35 Conversion efforts. The scope includes building a hangar bay, weapons and release systems shops, administrative spaces, and associated site work such as environmental remediation, demolition of existing structures, and installing asphalt and concrete pavements. The contract will be awarded on a firm fixed-price basis, contingent on fund availability, with the NAICS code 236220 and a small business size standard of $45M.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 CONSTRUCT COMBINED WEAPONS FACILITY, newest first.
File Type Posted
LSGA239001_CWF IFB Abstract 1419-KO.pdf PDF
Bid Submission Day Sign-In Sheet-3APR25.pdf PDF
Q-A set 05G_W50S6Y25BA004 3.28.25 Final.pdf PDF
RFI-0028 REV01-HANGAR DOOR OPENING CLARIFICATIONS AND DETAILS.pdf PDF
RFI-0086 Set 5 Q-3 Louvers locations_Parsons response.pdf PDF
Solicitation Amendment W50S6Y25BA0040002 SF 30 CWF.pdf PDF
Q-A set 04Gp2_W50S6Y25BA004.pdf PDF
CWF Spec 08 34 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 04G_W50S6Y25BA004 3.18.25.pdf PDF
RFI-0057 Q-A-29 set 04_Parsons response.pdf PDF
Solicitation Amendment W50S6Y25BA0040001 SF 30 CWF.pdf PDF
CWF Spec 08 36 16.20 Vertical Lift Fabric Hanger Door.pdf PDF
Q-A set 03G_W50S6Y25BA004 3.11.25.pdf PDF
CWF - RFI 0007 ATTACHMENT CU101.pdf PDF
CWF Spec Section 08 34 16 VERTICAL LIFT FABRIC HANGAR DOOR.pdf PDF
Missing Page from 25BA004 Sign In Sheet.pdf PDF
Q-A set 02G_W50S6Y25BA004 3.7.25.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.8.pdf PDF
CWF - RFI 0009.pdf PDF
CWF B-3 DESIGN ANALYSIS - Appendix E.9.pdf PDF
25BA004 Pre-Bid Site Visit PP.pptx PPTX presentation
GeoTech Rpt-Terracon.pdf PDF
Asbestos -Lead Paint Survey-Terracon.pdf PDF
CWF Pre-Proposal minutes.pdf PDF
CWF Sign In Sheet.pdf PDF
Q-A set 01G_W50S6Y25BA004 2.28.25.pdf PDF
Attach-1_JAXF35CWF-100P SPECIFICATIONS.pdf PDF
Solicitation - W50S6Y25BA004 Construct CWF.pdf PDF
Attach-3_JAXF35CWF-100P GENERAL FP ELECT TELE DRAWINGS VOLUME 2 OF 3.pdf PDF
Attach-6_BrandName (FAR 6)_Advantor-B COR-KO_Redacted.pdf PDF
Attach-7_BrandName (FAR 6)_Monaco-C-COR-KO_Redacted.pdf PDF
Attach-8_BrandName (FAR 6)_MMetasys-D-COR-KO_Redacted.pdf PDF
Attach-9_125FW Form 2 Access request (Aug 2023).pdf PDF
Attach-2_JAXF35CWF-100P GENERAL CS ARCH DRAWINGS VOLUME 1 OF 3.pdf PDF
Attach-4_JAXF35CWF-100P GENERAL MECH PLUM DRAWINGS VOLUME 3 OF 3.pdf PDF
Attach-5_BrandName (FAR 6)_BestCores-A- COR-KO_Redacted.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W50S6Y-25-B-A004 Combine Weapons Fac- LSGA239001

Addendum 02 Q&A

Date of Bid Inquiry: 2/28/2025

Questions 4:

Ref. CU101 & T-601, Keynote 33.82.14: Please clarify the location of the existing Telecomm vault, new Telecomm manhole and new Telecomm duct bank and clearly show them on Utility Layout

Plan CU101.

AE.

Date of response: 3/6/2025

By: Brian McNuckle

Response:

• Existing Telecomm Vault: The existing telecommunications vault MH-8 is located at the corner of Saber Ave and Shooting Star Road, which is outside the project limits.

• New Manhole Installation: Install a new manhole (MH) within the project limits, connecting to the existing BTE duct bank.

• New Telecomm Duct: Install a new telecommunications duct from the new manhole (MH) to the telecommunications room. Splice and extend in new manhole (MH) as required to install and terminate in new telecom room.

Please refer to the revised drawing CU101.