SOL_W15QKN16R0002_PLS_ATTACH_0031_SAMPLE_C_PRICE_COST_SHEET_23JAN2017.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- W15QKN16R0002
About this file
SOL_W15QKN16R0002_PLS_ATTACH_0031_SAMPLE_C_PRICE_COST_SHEET_23JAN2017
View the file
Other files
Show 40 more
Latest 50 of 120 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
| PLS SAMPLE TASK C - ORGANIZATIONAL REDESIGN STUDY |
| PRICING/COST SPREADSHEET |
| SOLICITATION W15QKN-16-R-0002 |
| PERSONNEL LIFE-CYCLE SUPPORT (PLS) |
| ATTACHMENT 0031 |
Instructions:
1. Offerors shall submit their offer by completing this Price/Cost Spreadsheet for all proposed pricing/costs.
2. The offeror shall complete the information with the required data element in each block.
3. The Price Factor Spreadsheet shall not be password protected or read only.
FOUO--Source Selection Sensitive--See FAR 2.101 and 3.104
SUMMARY
| PLS SAMPLE TASK C - ORGANIZATIONAL REDESIGN STUDY |
| SUMMARY |
| Offeror Name: | ||
| Cage Code: | ||
| Proposal Version: (Initial, Revision, Final) | Initial | |
| Date of Submission: | ||
| Base Period |
CLIN 0001 ORGANIZATIONAL REDESIGN STUDY (FFP) $ - 0
CLIN 0002 ODCs TO INCLUDE TRAVEL (CR) $ 200,000.00
CLIN 0003 CONTRACTOR MANPOWER REPORTING NSP
| Base Total | $200,000.00 | |
| Option Period 1 |
CLIN 1001 ORGANIZATIONAL REDESIGN STUDY (FFP) $ - 0
CLIN 1002 ODCs TO INCLUDE TRAVEL (CR) $10,000.00
CLIN 1003 CONTRACTOR MANPOWER REPORTING NSP
Option Period 1 Total $10,000.00
Grand Total $210,000.00
FOUO--Source Selection Sensitive--See FAR 2.101 and 3.104
LABOR - BASE
| PLS SAMPLE TASK C - ORGANIZATIONAL REDESIGN STUDY |
| LABOR - BASE PERIOD |
Offeror Name:
| SPECIFY TIMEFRAME | |||||
| Labor Category ID # | Labor Category | Proposed Base Period Hours | Unit | Fully Loaded Hourly Labor Rate | Extended Price |
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| 0.00 | Labor Total | $ - 0 |
FOUO--Source Selection Sensitive--See FAR 2.101 and 3.104
LABOR - OPT1
| PLS SAMPLE TASK C - ORGANIZATIONAL REDESIGN STUDY |
| LABOR - OPTION PERIOD 1 |
Offeror Name:
| SPECIFY TIMEFRAME | |||||
| Labor Category ID # | Labor Category | Proposed Option Period Hours | Unit | Fully Loaded Hourly Labor Rate | Extended Price |
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| Hr. | $0.00 | $ - 0 | |||
| 0.00 | Labor Total | $ - 0 |
FOUO--Source Selection Sensitive--See FAR 2.101 and 3.104
Assumptions
SCA Rates-Detailed Breakout
File details come from the government source that posted it. Updated .