SOL_W15QKN16R0002_PLS_ATTACH_0006_BASIC_PRS_06MAR2017.pdf
PDF 168 KB Posted
- Solicitation number
- W15QKN16R0002
About this file
SOL_W15QKN16R0002_PLS_ATTACH_0006_BASIC_PRS_06MAR2017
View the file
Other files
Show 40 more
Latest 50 of 120 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W15QKN-16-R-0002 Personnel Life-Cycle Support (PLS)
Attachment 0006 – Basic PRS
Personnel Life Cycle Support (PLS) Services Performance Requirement Summary (PRS)
06 March 2017
Statements Standards/AQLs Incentive/Remedy
3.1 The contractor shall
submit proposals for human resource services task order requests (TORs).
a) Provides a timely proposal for 50% of task order requests for proposals issued in the mission area suite. A timely proposal is submitted on or before the proposal due date. Late proposals are considered no-bids. The first measurement period will be the first 24 months of this contract.
This performance measure will be assessed annually thereafter. This measure will not be assessed if there are less than two (2) task order requests issued in the measurement period.
AQL: The contractor submits a timely proposal for 30% of task order requests for proposals issued in the mission areas suite.
b) For each task order request proposal submitted, the proposal is complete 100% of the time. A complete proposal addresses all solicitation requirements. The offeror does not omit any required proposal submission information in either format or content that prevents the Government from evaluating the proposal equitably.
AQL: The contractor submits not more than one incomplete proposal per contract period.
Contractor could be placed in dormant status IAW para H (Dormant Status) or ramped off
3.2 The contractor shall
submit technically acceptable, reasonable and realistically
a) Provides technical proposals rated Satisfactory or higher at least 50% of the time. The first measurement period will be the first 24 months of this
The contractor's CPAR rating will be impacted priced/costed proposals.
contract. This performance measure will be assessed annually thereafter. This measure will not be assessed if there are less than three (3) task order requests issued in the measurement period. Any results from a decentralized order will not be counted in this measure.
AQL: The contractor submits technical proposals that are rated Satisfactory or higher at least 40% of the time.
3.3 The contractor shall
submit accurate and complete documentation for TO invoices.
a) 100% of submitted invoices are accepted in Wide Area Work Flow (WAWF) the first time submitted.
AQL: 90% of submitted invoices are accepted in Wide Area Work Flow (WAWF) the first time submitted.
Contractor shall address actions to improve TO invoicing processes in the contract status report.
Contractor could be placed in dormant status IAW para (H-Dormant Status para) and or ramped-off
3.4 The contractor shall
provide quality, management oversight, accurate data/reports, and meet TO objectives for all services and products required.
a) All TOs issued under the contract receive a satisfactory or higher rating for quality of services/products in CPARs.
AQL: No more than one TO with a marginal rating for quality of services/products on TO CPARs.
No unsatisfactory ratings.
3.5 The contractor shall
adhere to all schedule timelines for milestones, delivery schedules,
a) All TOs issued under the contract receive a satisfactory or higher rating for schedule in CPARs.
AQL: No more than one TO with a
Contractor could be placed in dormant status and administrative requirements.
marginal rating for schedule on TO CPARs. No unsatisfactory ratings.
3.6 The contractor shall
be effective at forecasting, managing, and controlling cost.
a) 100% of TOs that have one or more cost reimbursement, CPFF, or labor hour CLINs receive a satisfactory or higher rating for cost control in CPARS.
AQL: No deviation from standard.
Contractor shall provide a corrective action plan to the COR
Contractor could be placed in dormant status
3.7 The contractor shall
successfully integrate and coordinate all business relations activities for contract/TO.
a) 100% of TOs issued under the contract received a satisfactory or higher rating for business relations on TO CPARs.
AQL: No more than one TO with a marginal rating for business relations on TO CPARs. No unsatisfactory ratings.
b) No COR evaluation ratings below satisfactory.
AQL: No deviation from standard on COR evaluation ratings.
3.8 The contractor shall
provide responsive key personnel.
a) Quality: The contractor CM and ACM effectively performed the functions described in PWS para
2.12.5.1 and the contractor's key personnel effectively performed the functions described in the key personnel paragraph of any associated TOs.
AQL: No deviation from standard.
b) Timeliness: Key Personnel provide a response to the
Contractor shall provide a corrective action plan to the COR
Contractor's CPAR rating could be impacted
Contractor shall provide a the COR
Government for any given request for information either on this contract or any associated TO on or before the deadline established in the request.
Contractor's CPAR rating could be impacted
3.9 The contractor shall
support DoD-established Socio- Economic program goals.
a) Meet or exceed 100% of all subcontracting plan goals for the total subcontracting plan as measured on an annual basis beginning one year after IDIQ contract award.
AQL: Meet or exceed 80% of the total subcontracting plan goal for the subcontracting plan as measured on an annual basis beginning one year after IDIQ contract award. Cumulative results will be evaluated.
Contractor shall provide a corrective action plan to the KO
Contractor could be placed in dormant status
3.10 The contractor shall
recruit and retain qualified personnel to perform on TOs.
a) Zero instances of a performance location being unsupported resulting in a Government-documented impact to services on any TO issued under this contract.
AQL: For performance at more than one location, one instance of a location unsupported during a monthly reporting period resulting in a documented impact to services. For requirements with performance at only one location, no deviation from standard
b) Zero instances reported of contractor employees that do not meet the qualifications specified in the TO.
Contractor shall provide an approved corrective action plan to provide support to the Government location(s) to bring performance to standard to the COR.
The contractor shall reimburse the Government for days missed/performance not met.
Contractor could be placed in dormant status
Contractor shall provide a the COR
Contractor could be placed in dormant status
File details come from the government source that posted it. Updated .