This document contains an underwater bridge inspection report and related federal contract opportunity for bridge repair work. The underwater inspection report provides condition assessments for bent columns and notes moderate abrasion on columns at bent numbers three and four with no footings exposed and riprap providing adequate scour protection. The related federal contract opportunity is a solicitation by the Oregon Department of Transportation and Federal Highway Administration for bridge repair work on 35.88 miles of OR Route 18 and 0.11 miles of an option route. The project location is five miles southeast of Springfield, Oregon in Lane County. The estimated price range for the firm fixed price contract is between $15 million and $20 million.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REGION:
MILE POINT: CURRENT:
VISIBILITY (Ft.):
ACCESS: WATER TEMP:
Elem. Description: Units
Elem. Description:
NBI Item 60, Columns have some abrasion, footings are well protected with blanket of riprap.
NBI Item 61, Channel has shifted since construction, but footings are still covered with riprap blanket.
NBI Item 71, Sufficient flow area.
NBI Item 113, Calculated to be a 3 by Hydraulics.
Elem. Description:
Rick Shorb, P.E.
Underwater Operations Engineer
(503) 986-2979 cc: District 5
Region 4 Bridge Inspector
Bridge Operations
Maintenance Recommendations:
No underwater maintenance is recommended at this time. No scour repair is recommended at this time.
71 Waterway Adequacy 7 7
113 Scour 3 3
60 Substructure Condition Assessment 6 7
61 Channel and Channel Protection Condition Assessment 5 5
NBI Ratings
Item Description:
Current Condition
Rating
Underwater Portion
Condition Rating
0 0
ELEMENT REMARKS:
205 Bent #3 : The upstream column was in 2.0-ft. of water and the downstream column was in 0.2-ft. of water.
Both columns have aggregate abrasion and are in Condition State 2. No footing is exposed. The main
Channel is about 20 ft. from the columns the whole bank is well protected with 3-4 ft. diameter riprap. The riprap extends 30-ft. into the channel is keyed in very well.
1180 Abrasion 4 each 0 4
205 Concrete Column-Bent #3 & #4 Moderate 4 each 0 4 0
UNDERWATER ELEMENT CONDITION STATES: CONDITION STATES
Defects: Environment Qty 1 2 3 4
Water Elevation Bent #3 downstream end from bottom of concrete cap down 15.0-ft.
GENERAL NOTES:
The element description provided in the general notes will be used to establish the appropriate underwater bridge inspection procedures, as provided in
Section 8 of the ODOT Underwater Bridge Inspection Manual.
Bridge specific safety Hazards (JHA):
Water temperature, fast current, Loose riprap.
DIVERS: Shorb, J.Ottosen, Boothe INS. INTERVAL: 2 MAXIMUM DEPTH: 20
COUNTY: Lane-East ROAD NAME: 10
FOUNDATION TYPE: Spread Footings 2 68
Constructed In 1955
STATE HWY #: 18 ROUTE NUMBER: OR 58 33.24 Fast
RIVER NAME: Willamette River OWNER: State DISTRICT: 5
UNDERWATER INSPECTION REPORT
BRIDGE NAME:Willamette River Barnard 2 BRIDGE NUMBER: 07894
This is a 7-span structure, supported with 2 concrete columns at each interior bent.
UW07894_.xls Inspection Date 8-31-20 Page 1 of 2
BR. #07894 WILLAMETTE RIVER-BARNARD BRIDGE STATE HWY 18
Exposed bedrock
Flow
Bent #3
Bent #4
C/2 C/2
N
Edge of Water
Edge of Water
2.0' W/D
3.0' W/D
4.0' W/D
5.4' W/D
5'
5'
5'
0.2' W/D
1.8' W/D
3.0' W/D
5.0' W/D
5'
5'
5'
5'
6.6' W/D
3-4-ft. diameter riprap all around approx. 23-ft. from pier channel is 12-ft. deep. approx. 20-ft. from pier channel is 12-ft. deep.
1.0' W/D
3.2' W/D
2.3' W/D
6.0' W/D
5'
1.9' W/D
3.8' W/D
5.0' W/D
6.7' W/D
5'
There is some erosion along the bank and the riprap settled a little in this area.
x
From bottom of concrete collar down 15.0-ft. to water surface.
2.7' W/D
0' W/D 0' W/D
From bottom of concrete collar down 14.5-ft. to water surface.
x C/2 C/2
UW07894_.xls Inspection Date 8-31-20 Page 2 of 2
File details come from the government source that posted it. Updated .