UWinspection_07894.pdf

PDF 41 KB Posted

Attached to
OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Solicitation number
69056723B000010
Issued by

About this file

This document contains an underwater bridge inspection report and related federal contract opportunity for bridge repair work. The underwater inspection report provides condition assessments for bent columns and notes moderate abrasion on columns at bent numbers three and four with no footings exposed and riprap providing adequate scour protection. The related federal contract opportunity is a solicitation by the Oregon Department of Transportation and Federal Highway Administration for bridge repair work on 35.88 miles of OR Route 18 and 0.11 miles of an option route. The project location is five miles southeast of Springfield, Oregon in Lane County. The estimated price range for the firm fixed price contract is between $15 million and $20 million.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REGION:

MILE POINT: CURRENT:

VISIBILITY (Ft.):

ACCESS: WATER TEMP:

Elem. Description: Units

Elem. Description:

NBI Item 60, Columns have some abrasion, footings are well protected with blanket of riprap.

NBI Item 61, Channel has shifted since construction, but footings are still covered with riprap blanket.

NBI Item 71, Sufficient flow area.

NBI Item 113, Calculated to be a 3 by Hydraulics.

Elem. Description:

Rick Shorb, P.E.

Underwater Operations Engineer

(503) 986-2979 cc: District 5

Region 4 Bridge Inspector

Bridge Operations

Maintenance Recommendations:

No underwater maintenance is recommended at this time. No scour repair is recommended at this time.

71 Waterway Adequacy 7 7

113 Scour 3 3

60 Substructure Condition Assessment 6 7

61 Channel and Channel Protection Condition Assessment 5 5

NBI Ratings

Item Description:

Current Condition

Rating

Underwater Portion

Condition Rating

0 0

ELEMENT REMARKS:

205 Bent #3 : The upstream column was in 2.0-ft. of water and the downstream column was in 0.2-ft. of water.

Both columns have aggregate abrasion and are in Condition State 2. No footing is exposed. The main

Channel is about 20 ft. from the columns the whole bank is well protected with 3-4 ft. diameter riprap. The riprap extends 30-ft. into the channel is keyed in very well.

1180 Abrasion 4 each 0 4

205 Concrete Column-Bent #3 & #4 Moderate 4 each 0 4 0

UNDERWATER ELEMENT CONDITION STATES: CONDITION STATES

Defects: Environment Qty 1 2 3 4

Water Elevation Bent #3 downstream end from bottom of concrete cap down 15.0-ft.

GENERAL NOTES:

The element description provided in the general notes will be used to establish the appropriate underwater bridge inspection procedures, as provided in

Section 8 of the ODOT Underwater Bridge Inspection Manual.

Bridge specific safety Hazards (JHA):

Water temperature, fast current, Loose riprap.

DIVERS: Shorb, J.Ottosen, Boothe INS. INTERVAL: 2 MAXIMUM DEPTH: 20

COUNTY: Lane-East ROAD NAME: 10

FOUNDATION TYPE: Spread Footings 2 68

Constructed In 1955

STATE HWY #: 18 ROUTE NUMBER: OR 58 33.24 Fast

RIVER NAME: Willamette River OWNER: State DISTRICT: 5

UNDERWATER INSPECTION REPORT

BRIDGE NAME:Willamette River Barnard 2 BRIDGE NUMBER: 07894

This is a 7-span structure, supported with 2 concrete columns at each interior bent.

UW07894_.xls Inspection Date 8-31-20 Page 1 of 2

BR. #07894 WILLAMETTE RIVER-BARNARD BRIDGE STATE HWY 18

Exposed bedrock

Flow

Bent #3

Bent #4

C/2 C/2

N

Edge of Water

Edge of Water

2.0' W/D

3.0' W/D

4.0' W/D

5.4' W/D

5'

5'

5'

0.2' W/D

1.8' W/D

3.0' W/D

5.0' W/D

5'

5'

5'

5'

6.6' W/D

3-4-ft. diameter riprap all around approx. 23-ft. from pier channel is 12-ft. deep. approx. 20-ft. from pier channel is 12-ft. deep.

1.0' W/D

3.2' W/D

2.3' W/D

6.0' W/D

5'

1.9' W/D

3.8' W/D

5.0' W/D

6.7' W/D

5'

There is some erosion along the bank and the riprap settled a little in this area.

x

From bottom of concrete collar down 15.0-ft. to water surface.

2.7' W/D

0' W/D 0' W/D

From bottom of concrete collar down 14.5-ft. to water surface.

x C/2 C/2