OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf
PDF 62 MB Posted
- Solicitation number
- 69056723B000010
About this file
This document contains details for a federal contract solicitation for bridge repair and replacement work on Oregon Route 58. The Oregon Department of Transportation is seeking firms for a project to repair and replace bridges along a 35.88 mile stretch of OR58 between the Coast Fork Willamette River and Lower Salt Creek. The work includes replacement of the Barnard Bridge as outlined in an attached hydraulic report. The contract type is firm fixed price with a sealed bid process. The estimated value is between $15-20 million. Firms must be registered in the System for Award Management to view the interested vendors list and be assigned the Contract Opportunities Administrator role to access additional details. The solicitation was issued by the Federal Highway Administration on behalf of the Oregon DOT. Responses are due as outlined in the solicitation documents.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .