This document includes a photo summary of the construction of a boat ramp on the Coast Fork Willamette River and details of a related federal contract opportunity for road construction.

The photo summary documents the construction in 2004 and 2005 of a boat ramp on the Coast Fork Willamette River near Dilly Lane through a project led by the Oregon Department of Transportation and Rural and Economic Development. It includes photos showing the existing ramp, preparation and installation of steel beams and concrete planks, placement of riprap, and completion and signage of the finished ramp.

The related federal contract opportunity is a sealed bid solicitation from the Federal Highway Administration for road construction work along OR DOT 18(1) and OR58 between the Coast Fork Willamette River and Lower Salt Creek in Lane County, Oregon. The 35.88-mile base schedule has an estimated price range of $15-20 million. There is one option for additional work of 0.11 miles. Interested vendors can view the interested vendors list by registering as a SAM user and being assigned the Contract Opportunities Administrator role for their entity. The response deadline is not provided.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR DOT 18(1)

OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Dilly Boat Ramp Construction Photos

Coast Fork Willamette/Hwy 58 Boat Ramp, R&E Project 01-018

Ramp as it existed August 6, 2003.

Ramp as it existed August 6, 2003.

ODOT-provided gravel access road June 7, 2004.

Digging out area for ramp installation October 27, 2004.

Installing galvanized steel beams October 27, 2004.

Backfilling galvanized steel beams October 27, 2004.

Installing concrete planks with crane, October 27, 2004.

Pouring concrete deadman October 27, 2004.

Placing riprap November 10, 2004. Decided to postpone work until lower flows.

Sorting through ODOT-donated riprap with Sheriff Work Crew, November 15, 2004.

Completing riprap placement, November 15, 2004.

Completed ramp, November 15, 2004! Thanks ODOT and R&E!!

ODOT has placed a boat ramp sign on Hwy

58 at the turn to Dilley Lane, and then another sign with arrow at the turn from

Dilley Lane to Dilley Lane Stub and the ramp.

The sign as installed Sept. 2, 2005. The sign is on Dilley Lane Stub just before the turn down the ramp and faces traffic entering from Dilley Lane.

Close-up showing logos.

File details come from the government source that posted it. Updated .