QA_02-28-2023.pdf

PDF 98 KB Posted

Attached to
OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Solicitation number
69056723B000010
Issued by

About this file

This document contains questions and answers related to a solicitation by the Oregon Department of Transportation for a bridge construction project along OR 58 between the Coast Fork Willamette River and Lower Salt Creek. The solicitation seeks bids for base work replacing two bridges over a 35.88 mile length, with an optional additional 0.11 miles of work. Bids are to be submitted as firm fixed price with award estimated between $15-20 million. The document provides clarification on requirements for soil stabilization, quantities of willow poles, specifications for willow and tree plantings including existing species to match, and the contractor's responsibility to locate water sources for hydroseeding.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOT 18(1)

OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

# General Technical Question Answer Date

1 X It looks like hydroseeding is to be done in phases or can it all be done at same time?

Perform soil stabilization work according to

Section 157, and limit turf establishment according to the requirements under

Subsection 625.03.

2/28/2023

2 X I want to clarify a total of 452 willow poles with the option z of total of 480.

The bottom table on Sheet F.1 shows the quantity of willow poles for Base Schedule

A and Option Schedule Z respectively.

2/28/2023

3 X What is the length of the willow cuttings and is there a specific diameter?

Diameters for willow plantings are specified under Subsection 713.06. Willow planting lengths have not been specified.

Provide willow planting lengths that meet the requirements of the plans and Section

626.

2/28/2023

4 X

Sheet F.4 and the solicitation documents, require tree plantings to match existing species.

What are the existing species and can you specify the size of the tree plantings?

The Government will not be providing this information. Perform site visits as needed to obtain existing conditions that have not been identified.

2/28/2023

5 X Where is the on‐site water source (fire hydrant or water truck) to refill our hydroseeding truck?

In accordance with the last paragraph on

Page A‐2b of the Notice to Bidders, water sources for this project have not been identified so locating water sources is the

Contractor’s responsibility. See Subsection

105.02(c) for Contractor‐located source requirements.

2/28/2023