As-Built Plans 02073C.pdf

PDF 8 MB Posted

Attached to
OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Solicitation number
69056723B000010
Issued by

About this file

This document provides details for a federal contract solicitation for highway construction services. The solicitation is for a firm fixed price contract valued between $15-20 million to complete 35.88 miles of road construction and 0.11 miles of optional work along OR Route 58 between the Coast Fork Willamette River and Lower Salt Creek in Lane County, Oregon. The project includes replacing the Salmon Creek Bridge. Bids are due by the date listed on SAM.gov and the contract will be awarded by the Federal Highway Administration to support their work with the Oregon Department of Transportation. Interested vendors must register in SAM.gov and be assigned the Contract Opportunities Administrator role to view the list of existing interested vendors and respond to this solicitation by the specified deadline.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR DOT 18(1)

OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

As-Builts for Salmon Creek Bridge

Comments_As-Built Plans 02073C.pdf
02126
02126A
31275
36833
39333
39335
39336
39337
40562
40570
42684
43330
43422
43495
43496
45418
46329
46330
46331
46332
46333
46334
46335
46336
46337
46338
46339
46340
46341
46342
46343
61976
97465
B-839
BR155

File details come from the government source that posted it. Updated .