This document package includes an invitation for bid for construction services as well as physical data documents related to the OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges project. The project involves seismically retrofitting four bridges located between miles 2.46 and 38.25 along OR58 to establish a lifeline route between the Willamette Valley and Central Oregon. Construction is scheduled to occur over two seasons in 2023 and 2024 with an estimated price range between $15-20 million. The invitation for bid was issued by the Department of Transportation Federal Highway Administration for full and open competition. Interested vendors can view the interested vendors list by registering in SAM.gov and being assigned the Contract Opportunities Administrator role.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHYSICAL DATA
for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
OR DOT 18(1)
OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Oregon DOT Traffic Control Approval
Page 1 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
OREGON DEPARTMENT OF TRANSPORTATION
MOTOR CARRIER TRANSPORTATION DIVISION
3930 FAIRVIEW INDUSTRIAL DRIVE SE
SALEM OR 97302-1166
MOBILITY CONSIDERATIONS CHECKLIST
SECTION 1
PROJECT NAME
OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
KEY NUMBER
20543
PS&E DATE
August 2022
HIGHWAY NAME AND NUMBER
Willamette Highway, No. 18
ROUTE NUMBER
OR58
MILE POST RANGE
2.46, 33.24, 35.98, and 38.25 DESCRIBE "TYPE" OF PROJECT (E.G. ADA, CULVERT, BRIDGE DECK REPAIR, PRESERVATION, ETC.)
This OR58 project is a bridge project that consists of seismically retrofitting four bridges (MP 2.46, 33.24, 35.98, and 38.25) along the corridor to establish a lifeline route between the Willamette Valley and Central Oregon from US97 to I-5.
NOTE 1: Per the Mobility Procedures Manual and Project Delivery Operational Notice, PD-16: Transportation Project Managers, Resident Engineers, Resident Engineers - Consultant Projects and Project Delivery Teams are responsible for completing this checklist initiated and signed by a Transportation Project Manager during the project development phase.
The checklist is submitted with the PS&E Package to the Office of Project Letting, and provided to the Resident Engineer when transitioning the project to the construction phase.
NOTE 2: Off-system projects that create a mobility impact on the state system must also comply with PD-16 and this checklist. Transportation Project Managers with projects (both on-system and off-system) that have no mobility impacts should check the “No Mobility Impacts” box and sign the checklist (MCTD signature is not required for a “no mobility impact” project) before submitting it with the PS&E package.
NOTE 3: The Statewide Traffic Mobility website has information on project requirements and guidance as well as policies and tools related to mobility, including the Mobility Procedures Manual.
Indicate Current Stage of Project
Early Communication DAP Preliminary Advanced
Impact on Mobility
No Mobility Impacts Mobility Impacts See mobility considerations below to determine. MCTD signature is not required for a project that has no mobility impacts.
Describe all mobility impacts on worksheet below.
SECTION 2
MOBILITY RESTRICTION CONSIDERATIONS WORKSHEET
All fields must be filled out or form may be returned
Project Information, Duration, and Hours Notes
1. Project anticipated start and end date? April 2023 - November 2024
2. How many construction seasons, and which year(s)? Two construction seasons - 2023 and 2024
Page 2 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
3. List the various stages and/or phases, resulting restriction, mile point range, and anticipated duration of each.
The sequence of construction has not been defined with specific completion dates. The Contractor will provide a construction schedule for the project. The below times specify the construction time frames for either year.
Construction activities are at 4 bridge sites located at M.P.
2.46, 33.24, 35.98, and 38.25. Traffic control will include two stages at all 4 bridges. Stage I will allow traffic in the eastbound travel lane(s) while work is completed in the westbound travel lane(s). Stage II will flip the work to the opposite lanes.
2-lane Coast Fork Willamette River Bridge at M.P. 2.46 - Alternating lane closures are limited at night only with 12' clear width available to accommodate 10' annual permit vehicles. 40 nights of lane closures are anticipated.
2-lane Willamette River Bridge (Barnard) at M.P. 33.24 - Alternating lane closures are limited at night only with 12' clear width available to accommodate 10' annual permit vehicles. 20 nights of lane closures are anticipated.
4-lane Salmon Creek Bridge at M.P. 35.98 - Two travel lanes will be closed at night providing two 12-foot lanes with shoulders (a minimum of 28' clear width) between the edge of barrier and the candlestick devices. 10 nights of lane closures are anticipated.
2-lane Lower Salt Creek Bridge at M.P. 38.25 - Alternating lane closures are limited at night only with 12' clear width available to accommodate 10' annual permit vehicles. 4 nights of lane closures are anticipated.
See #5 below for the allowable lane closure times at each bridge site.
4. Are there ways to provide windows of opportunity for unrestricted freight movement between stages? If so, describe proposed plans.
Yes.
OR58 at Coast Fork Bridge, OR58 at Barnard Bridge, and OR58 at Lower Salt Creek Bridge - Freight movements will not be restricted during the daytime between 6:00 a.m.
and 7:00 p.m., Monday through Friday or on weekend between 6:00 a.m. Friday through 7:00 p.m. Sunday as stated in #5 below.
Page 3 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
5. What are the allowable full, lane, or ramp closure days, hours, and months per standard specifications 00220.40(e). Indicate type of closure (e.g. full, lane, or ramp).
For Bridge 05286, Coast Fork Willamette River Bridge, nighttime alternating lane closures are allowed Sunday night through Friday morning from 7:00 pm through 6:00 a.m., except as specified in the Exceptions listed below.
For Bridge 07894, Willamette River Bridge (Barnard), nighttime alternative lane closures are allowed Sunday night through Friday morning from 7:00 p.m. through 6:00 a.m., except as specified in the Exceptions listed below.
For Bridge 02073C, Salmon Creek Bridge, nighttime single lane closures in each direction are allowed between 7:00 p.m. and 6:00 a.m. except as specified in the Exceptions listed below. Nighttime single lane closures are limited to a maximum of 10 nights.
For Bridge 01519A, Lower Salt Creek Bridge, nighttime alternating lane closures are allowed Sunday night through Friday morning from 7:00 p.m. through 6:00 a.m., except as specified in the Exceptions listed below.
Exceptions (apply for all bridges):
Do not perform construction operations that cause delays or otherwise interferes with public traffic during the following dates and times.
(1) From noon Friday through 6:00 a.m. Tuesday for Memorial Day holiday.
(2) From noon Friday through 6:00 a.m. Tuesday for Labor Day holiday.
(3) From noon June 30 through 6:00 a.m. July 5, 2023 for Independence Day Holiday.
(4) From noon July 3 through 6:00 a.m. July 5, 2024 for Independence Day Holiday.
(5) On all other holidays as follows: New Years Day, Martin Luther King Jr. Day, President’s Day, Juneteenth National Independence Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas, and any other days declared holidays by the Congress or the President. If a holiday occurs on a Saturday, the receding Friday is also a legal holiday. If a holiday occurs on a Sunday, the Monday following is also a legal holiday.
(6) Special Events as follows:
(a) Eugene Marathon, Half Marathon and 5k. From April 21, 2023 to April 23, 2023.
(b) Eugene Marathon, Half Marathon and 5k. From April 19, 2024 to April 21, 2024.
(7) From noon Friday through 7:00 p.m. Sunday, unless approved by the CO.
6. Is this project on a route that is being used as a detour route for another project, and if so is work being coordinated to prevent conflicts?
No project is identified that uses the impacted roadway as a detour route at this time.
7. Is this project on an ORS 366.215 Reduction Review Route and does it have a potential reduction in vehicle carrying capacity? If yes, has the project been shared with the Stakeholder Forum and received a Record of Support per OAR 731-012-0010 and ORS 366.215?
This project is on a Reduction Review Route; however, no reduction in vehicle carrying capacity during the daytime as stated in #3 above. There is no permanent reduction in vehicle carrying capacity after construction of project.
Page 4 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
SECTION 3
Work Zone Safety Considerations Notes
1. Have you considered a full range of options for roadway and work zone design per the Work Zone Safety Guiding Principle?
Yes.
2. Have you updated the Work Zone Decision Tree throughout the project milestones?
Yes.
3. If this is a paving project, what is the estimated number of shifts and hours per shift?
This is not a paving project.
SECTION 4
Road Closure Considerations Notes
If full road closures are planned, list direction of travel and duration of the closure.
No full road closures of State Highways are planned.
SECTION 5
Lane Closures / Width Restriction Considerations Notes
Page 5 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
1. If lane closures are planned, indicate which lanes will be closed, whether the work zone is on a curve or straight section, and how much paved width will be available to traffic between barriers/traffic control devices (e.g. barrels, cones, candlesticks, equipment, concrete barriers, etc.). If the width* will vary depending on the stage/phase of the project, list the available width, mile point range, and duration of each stage/phase.
*Note: Width generally refers to the paved width of the lane and any shoulders which are capable of supporting the freight traffic loads without failure. On a case by case basis, unpaved/aggregate shoulders may be determined to be useable.
Traffic control will include two stages. Stage I will allow traffic in the eastbound travel lane(s) while work is completed in the westbound travel lane(s). Stage II will flip the work to the opposite lanes. The work zones at all locations are on tangent sections of OR58.
At MP 2.46, 12-feet will be provided between the face of barrier and the foot of the candlestick devices, with three-feet of clearance to the work zone. The short term night lane closures are expected to occur for approximately 40 nights. The traffic flow will be controlled by flagging operations with typical tapers approaching/ departing the bridge as shown in the TCP.
At MP 33.24,12-feet will be provided between the face of barrier and the foot of the candlestick devices, with four-feet of clearance to the work zone. The short term night lane closures are expected to occur for approximately 20 nights. During the bridge deck overlay approximately 12-feet will be provided between the face of barrier and the foot of the channelizing candlestick devices. The bridge deck overlay is expected to be complete in approximately 4 nights. The traffic flow will be controlled by flagging operations with typical tapers approaching/departing the bridge as shown in the TCP.
At MP 35.98 two travel lanes and one shoulder will be closed at night providing two 12-foot lanes with shoulders (a minimum of 28' clear width) between the edge of barrier and the candlestick devices for pedestrian and bicycle traffic. Typical lane closure and shifting tapers approaching and departing the bridge will be in place as shown in the TCP. No flagging operations are anticipated.
The joint seal repairs are expected to take approximately 10 nights total.
At MP 38.25, 12-feet will be provided between the face of barrier and the foot of the candlestick devices, with four-feet of clearance to the work zone. The short term night lane closures are expected to occur for approximately 20 nights. During the bridge deck overlay approximately 12-feet will be provided between the face of barrier and the foot of the channelizing candlestick devices. The bridge deck overlay is expected to be complete in approximately 4 nights. The traffic flow will be controlled by flagging operations with typical tapers approaching/departing the bridge as shown in the TCP.
2. Will there be lane closures under structures? If so, is there an “up and over” diversion available?
No.
3. Have travel lane widths been reduced? If so, what are the lane widths?
No.
4. Will there be less than 28-feet for two lanes of one-way traffic, or for two opposing lanes of head-to-head traffic? If so, how much width will you have and describe the traffic control method. (Provide staging plans if available).
Yes. One 12-foot travel lane will be provided allowing two-way traffic in a single lane under flagging operations at MP 2.46, MP 33.24, and MP 38.25.
At MP 35.98, a minimum roadway width of 28 feet will be provided for two opposing lanes with shoulders.
Page 6 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
5. Does the available horizontal width between traffic control devices restrict annual permits? Contact the MCTD Mobility Team for help determining.
Yes, the horizontal width restricts annual permits.
6. Can all unannounced (no advanced notice required) oversize loads be accommodated safely through the restricted work zone by moving equipment and traffic control devices out of the way and waving them through with a slight delay (e.g. less than 20 minutes)? Indicate how long the anticipated delay will be. Will the travelling public also be delayed as a result?
No.
According to the Freight Mobility Nighttime Width Map (www.oregon.gov/odot/ProjectDel/Mobility/ NighttimeWidthMap.pdf), OR58 is a green route. As such, loads with annual permits and oversize loads traveling through OR58 at night are restricted by a 10’ width restriction. 10’ wide loads can be accommodated at night at all four bridge sites. Oversize loads greater than 10’ wide would have to go through the CCD restriction notice process if they want to travel through OR58 at night.
Oversize loads greater than 10’ wide can be accommodated through the project area since there are no planned lane restrictions during the daytime.
7. If unannounced loads cannot be accommodated, can loads with advance notice be accommodated on a case by case basis? If yes, how much advance notice will be required? If the answer is no, provide the oversize load detour route per Q.3 under Section 7 (Detour Route Considerations).
N/A
SECTION 6
Ramp Width Restriction or Closure Considerations Notes
1. If ramp closures are planned, list the ramps by name, number, and whether they are “on” or “off” ramps.
No ramp closures planned.
2. How long will each ramp be closed? Indicate hours and days needed for each.
No ramp closures planned.
3. Will any ramps be width restricted? If so, how much paved width will be available to traffic between barriers/traffic control devices? What are the days/hours of the width restriction?
No ramp closures planned.
SECTION 7
Detour Route Considerations Notes
1. For “road-closures” what is the approved detour route? No road closures are planned.
2. Will the detour route accommodate the same sized vehicles (annual permitted dimensions and/or single-trip permitted dimensions), that are normally allowed on the proposed route that is going to be restricted?
Contact the MCTD Mobility Team for help determining.
No detour routes needed.
3. If the detour route cannot accommodate the same size vehicles as the proposed restricted route, has an additional detour route been identified? If so, please describe.
No detour routes needed.
4. Has the detour route been checked for overhead obstructions to ensure all vehicles can travel the entire route? (E.g. structures, wires, signal heads, overhanging trees, etc.)
No detour routes needed.
5. Has the detour route been checked for weight restrictions over structures? Contact the MCTD Mobility Team for help.
No detour routes needed.
6. Have turning movements been evaluated to see if they provide safe turning movements and off tracking? Contact the MCTD Mobility Team to obtain oversize load information, including truck diagrams.
No detour routes needed.
Page 7 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
7. If the detour route uses city streets/county roads, has it been approved by the local jurisdiction? List approver.
No detour routes needed.
8. The District road authority must approve detour routes when requested to allow increased oversize load dimensions to accommodate the vehicles routinely allowed on the restricted route. Contact the MCTD Mobility Team for help determining if approval will be needed.
No detour routes needed.
9. Will the detour route be signed? No detour routes needed.
10. For “ramp-closures”, what are the detour routes? If using the next exit, how will this be communicated to drivers?
No ramp closures will be needed, no detour routes needed.
11. If routed to the next exit and instructed to reverse direction, has the highway undercrossing been evaluated for height?
NA.
SECTION 8
Special Detour Route Considerations Notes
1. How will the detour route affect emergency services response times? No detour routes needed.
2. Will vehicles transporting hazardous materials be able to use the planned detour route?
No detour routes needed.
3. Are there other projects along the proposed detour route which will restrict traffic?
No.
SECTION 9
Critical Route Pair Considerations Notes
1. Is the project on a critical route pair? See Mobility Procedures Manual for help.
Yes. OR58 is a critical route pair with OR126 (McKenzie Highway, No. 15).
2. If the project is on a critical route pair, is work taking place on the paired route that also has restrictions, and/or delays that exceed allowable thresholds? If yes, name the project and describe restrictions and/or delays.
OR126 has a paving project slated for April - August 2023.
The project name is: "OR126: Greenwood Drive - Vida (K21543)". It is located at MP 21.65 - 26.58. It will restrict lane closures to occur only at night.
3. If there are no conflicts identified, who confirmed this information? (E.g.
the Transportation Project Manager or Mobility Liaison? Traffic Engineer?)
Do not anticipate conflicts or issues with closing a lane on OR126 at night as traffic volumes are much lower at night than during the day. Region 2 Resident Engineer confirmed this information.
SECTION 10
Height, Length & Weight Considerations Notes
1. If your project has bridge work that has load rating factors showing insufficient load capacity for unrestricted use by Permit Vehicles, ODOT's Weight Restrictions Policy (PMT 06-01) must be followed. If your work will require restricting the bridge, please describe the restriction (annual, single trip) per the Bridge Unit. Weight restrictions will be posted on the Road and Bridge Restriction list.
N/A.
2. When projects have work zones that have a high degree of curvature (more than 5 degrees) the overall length of oversize loads may need to be restricted. Is a length restriction necessary? If so, please describe.
No.
3. Are there any traffic control devices or construction tools in the work zone that temporarily reduce the overall height available to loads?
(E.g. temporary signals, falsework, containment systems, etc.)
No.
Page 8 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
SECTION 11
MOBILITY COMMUNICATIONS CHECKLIST
YES NO NA ACTION
Contacted the MCTD Mobility Team early in project development, prior to DAP, to identify potential mobility and work zone safety impacts, and allow time for review.
Provided the MCTD Mobility Team with current copy of TMP/Work Zone Decision Tree/Traffic Control Plan.
Met with the Mobility Advisory Committee (if needed) to share project and seek support.
Met with the Mobility Advisory Committee per the Highway Roundabout Directive DES 02 to ensure freight movement, including over-dimension loads, can be accommodated through the roundabout; and a document memorializing roundabout decision was issued.
Identified which part of the industry is affected by restriction, (e.g. annual permit holders vs. single trip permits). Contact the MCTD Mobility Team for help determining.
Additional coordination is required with the MCTD Mobility Team.
Provided project information to the Region Mobility Liaison.
Considered impacts and confirmed inclusion of local events and special travel days within project Special Provisions prior to start of restriction.
Identified the need during construction to provide Work Zone Notification 35 day written notice to MCTD prior to start date of restriction per ODOT Standard Specifications 00220.03(a).
Project restrictions are supported by MCTD and if needed the Mobility Advisory Committee. Attach email(s) and /or Mobility Advisory Committee meeting minutes indicating MCTD support.
Worked with the following groups to identify and resolve any potential conflicts:
District Maintenance Staff Consultants Local
Road Authorities Local Utilities Rail Authorities Not Applicable
SECTION 12
ADDITIONAL COMMENTS/NOTES
Page 9 of 9FORM 735-9983 (4-19) Mobility Considerations Checklist
SECTION 13
SUBMITTAL INSTRUCTIONS
Transportation Project Managers/Resident Engineers:
Submit draft Checklist and supporting emails and/or meeting minutes, if available, to the MCTD Mobility Team and your Region Mobility Liaison at Design Acceptance Phase (DAP).
Contact the MCTD Mobility Team if there are any changes to mobility impacts following DAP.
Update and resubmit Checklist and supporting emails and/or meeting minutes to the MCTD Mobility Team and to your Region Mobility Liaison as needed following DAP.
Submit signed Checklist and supporting emails and/or meeting minutes to the MCTD Mobility Team and to your Region Mobility Liaison at Advanced Plans Phase.
Provide copies of the Checklist and supporting emails and/or meeting minutes to the Resident Engineer to communicate project restrictions supported by MCTD, and if needed the Mobility Advisory Committee Include a copy of the signed Checklist in the PS&E packet submitted to the Office of Project Letting.
Construction/Consultant/Transportation Project Managers/Resident Engineers/Resident Engineers - Consultant Projects:
Before making changes during construction that have the potential to adversely affect mobility (i.e. additional restrictions) or run counter to previous mobility agreements made during preliminary design, you must discuss proposed restriction revisions with the Contractor, Region Mobility Liaison, and any relevant region resources to determine if the change is warranted and supported by the Region. If supported by Region, Resident Engineers must:
Engage MCTD Mobility Team to discuss and obtain concurrence with the potential changes before any agreements are made with the contractor.
Document MCTD and Mobility Advisory Committee support of any potential new restrictions and provide a copy of the documentation to the Region Mobility Liaison.
SECTION 14
SIGNATURES
(Digital Signatures Allowed)
This project has been vetted through MCTD and, if needed, the Mobility Advisory Committee.
Documentation in file and/or attached.
MCTD signature is not required for a project that has no mobility impacts.
REGION PROJECT LEAD REGION PROJECT LEAD SIGNATURE DATE
MCTD MOBILITY PROGRAM MANAGER MCTD MOBILITY PROGRAM MANAGER SIGNATURE DATE
Christy Jordan 9/9/2022
Julie GaNung 9/9/2022