OR DOT 18(1) ESCP.pdf

PDF 16 MB Posted

Attached to
OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Solicitation number
69056723B000010
Issued by

About this file

This solicitation is for a construction project to improve a 35.88 mile section of OR58 highway between Coast Fork Willamette River and Lower Salt Cr Bridges in Lane County, Oregon. The project includes replacing or improving multiple bridges along the route. The estimated value is between $15-20 million. The contract type is firm fixed price with a base schedule and one option. Bids are due via sealed bid in response to Solicitation Number 69056723B000010. The awarded contract will be managed by the Federal Highway Administration in partnership with the Oregon Department of Transportation.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Erosion and Sediment Control Plan

ESCP

Oregon NPDES

Permit# 1200-CA

For:

Federal Highway Administration Western Federal Lands Highway Division

Table of Contents

ESCP TABS

TAB 1: ESCP Narrative

TAB 2: OR DEQ NPDES Permit (1200-CA)

TAB 3: NOI (not required), DEQ Acknowledgement, Other Applicable Correspondence

TAB 4: Delegation of Authority

TAB 5: Site Maps (Indicate Wetlands, Waters, other Waterbodies)

TAB 6: Erosion/Sediment Control Plan Sheets (Plan Set and BMP Typical Details)

TAB 7: Revegetation Plan (if applicable)

TAB 8: ESCP Amendment Log

TAB 9: Inspection Reports

TAB 10: Corrective Action Log

TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports

TAB 12: Training/Certification Log

TAB 13: Government-Selected Waste, Borrow, Staging Sites (Indicate BMPs at Each Site)

TAB 14: Grading and Stabilization Log

TAB 15: Spill Prevention, Control, and Countermeasures (SPCC)

TAB 16: Environmental Management Plan (if required)

TAB 17: Quality Assurance Checklist

Tab 1 - ESCP Narrative

Revise and update as needed per SCR 107 and SCR 157

Erosion and Sediment Control Plan (ESCP)

For Construction Activities at:

Project Name: OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Project Site Location: OR HWY 58 MP 2.46 to MP 38.25

City, County, State, Zip Code:

Oakridge, Lane, OR, 97463

ESCP Prepared for:

Organization Name: FHWA, Western Federal Lands Highway Division

Address: 610 East Fifth Street Vancouver, WA 98661-3801

Telephone Number: 360-619-7700

ESCP Draft Preparation Date by FHWA: 9/28/22

Name, Title: Cyrus Bullock, Environmental Specialist

Company/Organization: FHWA, Western Federal Lands Highway Division

Address:

610 East Fifth Street Vancouver, WA 98661-3801

Telephone Number: (360) 619-7964

Certification/Training CESCL

ESCP Completion Date by Contractor: Click here to enter text.

Name, Title:

Company/Organization:

Telephone Number:

Certification/Training

Estimated Construction Start Date: March 2023 Estimated Construction Completion Date: November 2024 Estimated Construction Days/Hours: Monday through Friday, generally during daylight hours and between 10 to 40 days per bridge between 7 pm to 6 am for work requiring nighttime lane closures Estimated Revegetation Start Date: March 2023 Estimated Revegetation Completion Date: March 2024

[i]

SECTION 1: RESPONSIBLE PARTIES/CONTACT INFORMATION

1.1 Operator(s):

1.2 Construction Site ESCP Contact(s):

1.3 ESCP Prepared by:

1.4 NPDES Stormwater Permit

1.5 ESCP Administrator

1.6 Permitting Authority for FHWA/WFLHD Projects

SECTION 2: PROJECT INFORMATION

2.1 Project Name and Location

2.2 Project Site Characteristics

SECTION 3: NATURE OF CONSTRUCTION ACTIVITY

3.1 General Description of Project and Scope of Work:

3.2 Sequence and Estimated Dates of Construction Activities

3.3 Potential Sources of Pollutants

SECTION 4: SITE MAPS

SECTION 5: DISCHARGES

5.1 Allowable Non-Stormwater Discharges

5.2 Receiving Waters:

5.3 Water Quality Monitoring Requirements

SECTION 6: EROSION AND SEDIMENT CONTROLS

6.1 Perimeter Controls

6.2 Sediment Track-Out

6.3 Stockpiled Soil or Other Erodible Materials

6.4 Minimize Dust

6.5 Minimize Disturbance of Steep Slopes

6.6 Topsoil Conservation

6.7 Minimize Soil Compaction

6.8 Storm Drain Inlets and Culvert Inlets

6.9 Constructed Stormwater Conveyance Channels and Culvert Outlets

[ii]

6.10 Sediment Basins

6.11 Chemical Treatment

6.12 Dewatering Practices

6.13 Erosion Control and Stabilization

6.14 Removal of BMPs

6.15 Post Construction Measures

SECTION 7: OPERATIONAL CONTROLS/GOOD HOUSEKEEPING MEASURES

7.1 Spill Prevention, Control and Countermeasure Plan

7.2 Spills/Releases in Excess of Reportable Quantities

7.3 Equipment/Vehicle Fueling and Maintenance Practices

7.4 Equipment/Vehicle Washing

7.5 Material Handling and Waste Management

7.6 Designate Concrete Washout Areas

SECTION 8: INSPECTIONS

8.1 Inspection Frequency

8.2 Corrective Actions

SECTION 9: DELEGATIONS OF AUTHORITY

SECTION 10: STAFF TRAINING

SECTION 11: CERTIFICATION AND NOTIFICATION

[1]

Section 1: Responsible Parties/Contact Information

1.1 Operator(s):

Organization Name: FHWA, Western Federal Lands Highway Division (WFLHD) Address: 610 East Fifth Street

Vancouver, WA 98661-3801 Telephone Number: 360-619-7700

Contractor and PE Note: Fill in all incomplete information following contract award date and prior to preconstruction conference.

1.2 Construction Site ESCP Contact(s):

FHWA Contact Name:

Title:

Project Engineer

Telephone Number:

General Contractor Company:

Address:

Telephone Number:

Erosion Control Supervisor Name:

Inspector/Visual Monitor Name and Contact Information (See Tab 12 for certification)

Erosion Control Team Member Name and Role/Responsibilities

Erosion Control Team Member Name and Role/Responsibilities

Add rows as needed

Contractor and PE Note: Identify erosion control team members and include required certifications under Tab 12

[2]

1.3 ESCP Prepared by:

Organization/Company: WFL/FHWA

Name, Position: Cyrus Bullock, Environmental Specialist Role/Responsibility Preliminary ESCP Preparer Telephone Number: (360) 619-7964 Email: cyrus.bullock@dot.gov

Organization/Company: Contractor

Name, Position:

Role/Responsibility Final ESCP of Record and Revised ESCP Preparer Telephone Number:

Email:

1.4 NPDES Stormwater Permit

The 1200-CA NPDES Stormwater Permit is located in TAB 2.

1.5 ESCP Administrator

The General Contractor (section 1.2) is responsible for maintaining the project ESCP of Record.

The General Contractor will provide a qualified Erosion Control Supervisor, who is responsible for managing the installation, maintenance, inspection, and reporting for erosion and sediment control measures, shall maintain and update the project ESCP of Record and prepare all documentation required by the project NPDES stormwater permit and ESCP.

The Erosion Control Supervisor (ECS) and erosion control team member(s) and their roles are identified in section 1.2 and his/her qualifications are documented in TAB 12.

The FHWA/WFLHD Project Engineer (PE) is the duly authorized representative of the FHWA for the purpose of overseeing compliance with the NPDES stormwater permit and ESCP at the construction site. See Delegation of Authority TAB 4.

All ESCP documentation, revisions/updates, and reports will be approved/signed by both the General Contractor’s ECS and the FHWA PE.

1.6 Permitting Authority for FHWA/WFLHD Projects

The 1200-CA NPDES permit is located in TAB 2

State Permitting Authority Oregon • ODEQ is permitting authority for most discharges within the state EXCEPT for:

• EPA is the permitting authority for Indian Country lands within the state.

Oregon DEQ authorizes FHWA/WFLHD projects under the programmatic 1200-CA permit.

https://www.oregon.gov/deq/wq/Documents/1200-CA-Permit.pdf

[3]

Section 2: Project Information

2.1 Project Name and Location

Project Name: OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Project Site Location: OR HWY 58 MP 2.46 to MP 38.25

City, County, State, Zip Code: Oakridge, Lane, OR, 97463

Latitude/Longitude:

1.) Bridge 05286 Coast Fork Willamette River, MP 2.46 (Lat. 43.980843, Long. -122.966810) 2.) Bridge 07894 Willamette River (Barnard), MP 33.24 (Lat. 43.746861, Long. -122.511327) 3.) Bridge 02074C Salmon Creek, MP 35.98 (Lat. 43.740737, Long. -122.459641) 4.) Bridge 01519A Lower Salt Creek, MP 38.25 (Lat. 43.730181, Long. -122.419782)

The method used for determining latitude/longitude was: GPS

Township: Range: Section:

18S 2W 30 18S 2W 30 18S 2W 30

21S 2E 13 21S 2E 13 21S 2E 13

21S 3E 16 21S 3E 16 21S 3E 16

21S 3E 23 21S 3E 23 21S 3E 23

The project Does Not discharge stormwater into a Municipal Separate Storm Sewer System.

2.2 Project Site Characteristics

The undeveloped site and features of the land that are incorporated into the final soil Erosion and Sediment Control plan sheets (TAB 6) , as well as natural resources that should be protected are described below:

Vegetation, trees, and sensitive areas, such as stream buffers, wetlands, highly erodible soils, and steep slopes at the site include:

1. Bridge 05286 Coast Fork Willamette River – Natural vegetative buffer on both sides of stream. Vegetation consists of native grasses, trees, and shrubs. Riparian vegetation along river. An access road/boat ramp approaches stream on northeast

[4] side of highway on river right. Wetland located approximately 700 feet northeast of the existing bridge, but is outside the area of disturbance and construction limits.

2. Bridge 07894 Willamette River (Barnard) – Natural vegetative buffer on both sides of stream. Vegetation consists of native grasses, trees, and shrubs. Riparian vegetation along stream. An access road approaches stream on northside of highway on river right. A side channel runs under Span #5 on east side of river with pools upstream.

3. Bridge 02073C Salmon Creek – Natural vegetative buffer on both sides of stream. Vegetation consists of native grasses, trees, and shrubs. Riparian vegetation along stream.

4. Bridge 01519A Lower Salt Creek – Natural vegetative buffer on both sides of stream. Vegetation consists of native grasses, trees, and shrubs. Riparian vegetation along river.

Also, see TAB 6

The method and location of discharge points or areas:

1. Bridge 05286 Coast Fork Willamette River – Method of discharge is storm water run-on/run-off from disturbed areas adjacent to stream and discharge from dewatering activities. Discharge location is all along disturbance area underneath and around bridge immediately adjacent to river and pump discharge lines approximately 150 feet downstream of pump locations.

2. Bridge 07894 Willamette River (Barnard) – Method of discharge is storm water run-on/run-off from disturbed areas adjacent to stream and discharge from dewatering activities. Discharge location is all along disturbance area underneath and around bridge immediately adjacent to river and pump discharge lines approximately 150 feet downstream of pump locations. There is also discharge location at the side channel on the east side of the bridge (river right) under Span #5.

3. Bridge 02073C Salmon Creek – Method of discharge is storm water run-on/ run-off from disturbed areas adjacent to stream. Discharge location is all along disturbance area underneath and around bridge immediately adjacent to stream.

4. Bridge 01519A Lower Salt Creek – Method of discharge is storm water run-on/run-off from disturbed areas adjacent to stream. Discharge location is all along disturbance area underneath and around bridge immediately adjacent to stream.

Also see TAB 6

[5]

Soil type(s), erodibility rating, and drainage class are identified as:1

1. Bridge 05286 Coast Fork Willamette River – 68.4% Newberg Loam, well drained; 31.6% Chehalis silty clay loam, well- drained

2. Bridge 07894 Willamette River (Barnard) – Riverwash, poorly drained

3. Bridge 02073C Salmon Creek – 24.2% Camas gravelly sandy loam, excessively drained; 25.1% Fluvents, poorly drained; 50.8% Riverwash, poorly drained

4. Bridge 01519A Lower Salt Creek – Fluvents, poorly drained

Any past soil contamination at the site is identified as:

N/A

Protected Natural Features (natural features include natural buffer zones [defined in the 1200-CA as the area within 50 feet of surface waters], trees, streams, wetlands, slopes, etc.):

1. Bridge 05286 Coast Fork Willamette River – Protected features at this site are the Coast Fork Willamette River, the natural vegetative buffer and riparian vegetation outside the area of disturbance, the wetland located approximately 700 feet northeast of the existing bridge, and the existing boat ramp.

2. Bridge 07894 Willamette River (Barnard) – Protected features at this site are the Willamette River, side channel through Span 5 and pools upstream of bridge, and the natural vegetative buffer and riparian vegetation outside the area of disturbance.

Existing trees in the vicinity of access road construction will be protected the best extent possible.

3. Bridge 02073C Salmon Creek – Protected features at this site are Salmon Creek, and the natural vegetative buffer and riparian vegetation outside the area of disturbance.

4. Bridge 01519A Lower Salt Creek – Protected features at this site are Lower Salt Creek, and the natural vegetative buffer and riparian vegetation outside the area of disturbance.

Also see TAB 6

Measures to protect these features:

Orange construction fence, stabilized construction entrance/exit, fiber rolls, silt fence, cofferdams, by-pass pipe or temporary bridge, dewatering pumps with sediment socks on discharge line, hydroseeding, re-planting of trees that were removed during construction, and placed riprap with willow stakes for vegetative covering.

1 NRCS Web Soil Survey.

http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx

[6]

Rainfall:

1.) Bridge 05286 Coast Fork Willamette River 10-year Mean Annual Precipitation at the Project Site (inches):2 40-60 inches

Frequency, intensity, and duration of rainfall for the project site:

(principal factors influencing erosion from a construction site)

The 2-year, 24-hour storm event:3

2.53 inches/day

2.) Bridge 07894 Willamette River (Barnard) 10-year Mean Annual Precipitation at the Project Site (inches): 65.7 inches

The 2-year, 24-hour storm event:

2.77 inches/day

3.) Bridge 02073C Salmon Creek

10-year Mean Annual Precipitation at the Project Site (inches): 66.2 inches

Frequency, intensity, and duration of rainfall for the project site:

(principal factors influencing erosion from a construction site)

2.69 inches/day

4.) Bridge 01519A Lower Salt Creek

10-year Mean Annual Precipitation at the Project Site (inches): 66.2 inches

Frequency, intensity, and duration of rainfall for the project site:

(principal factors influencing erosion from a construction site)

2.69 inches/day

2 NRCS Annual Climate Data 3 Precipitation frequency for Western States https://www.wcc.nrcs.usda.gov/climate/navigate_wets.html http://www.wrcc.dri.edu/Climate/precip_freq_maps.php

[7]

Section 3: Nature of Construction Activity

3.1 General Description of Project and Scope of Work:

Describe proposed construction activities, including structures that are planned for demolition.

Include types of fill material proposed for the project.

Include general type of project (i.e., highway construction, roadway realignment, highway and bridge reconstruction, etc.).

Identify waterbodies to be impacted by construction activities and describe work to occur in waterbodies:

The proposed project consists of seismically retrofitting four bridges on OR58 (ODOT Hwy 18). Waterbodies to be impacted include the Coast Fork Willamette and the Middle Fork Willamette rivers. Work within the water consists of seismically retrofitting the bridge piers.

The piers will be isolated from the rivers with the use of cofferdams.

The type or function of the project is: Bridge Construction

Construction Support Activities: If applicable, describe any construction support activities, such as dedicated concrete or asphalt batch plants, dedicated aggregate sites, equipment staging yards, material storage areas, borrow, or disposal sites (government-selected sites):

Staging areas will occur within existing pullouts and open and previously disturbed areas adjacent to the roadway within ODOT ROW/easements.

NOTE: All Contractor-selected sources and support sites are the sole responsibility of the General Contractor. The ESCP and NPDES permitting for Contractor-selected sites and sources are separate from this documentation (SCR 107.01A(g)).

Support activities are located on the general vicinity map and/or site map in TAB 5 and TAB 6.

Size of Project Area:

(Including all Government-selected support sites such as staging, borrow, waste, access roads, affected downstream area, noise perimeter, extent of light effects, etc.)

Estimated Area Units

Total length of project for linear projects

0.5 Miles combined for all four

bridges (measure to the ¼ mile)

Total project area: 5 Acres (measure to the ¼ acre)

Disturbed project area:

3.75 Acres (measure to the ¼

acre)

Total disturbed acreage expected at any one time

3.75 Acres (measure to the ¼

acre)

[8]

3.2 Sequence and Estimated Dates of Construction Activities

The intended construction sequencing and timing of major construction activities is detailed here, including the phased grading and stabilization activities used to minimize overall amount of disturbed soil.

Contractor and PE Note: Fill in for all proposed phases and ensure that each phase described below has separate erosion and sediment control plans.

Phase:

Construction sequence description:

Start date and duration of sequence (include dates of temporary or final stabilization):

BMPs associated with this sequence:

Stabilization measures (include dates of installation and temporary BMP removal):

Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.

Phase:

Construction sequence description:

Start date and duration of sequence (include dates of temporary or final stabilization):

BMPs associated with this sequence:

Stabilization measures (include dates of installation

Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.

[9] description:

Start date and duration of sequence (include dates of temporary or final stabilization):

BMPs associated with this sequence:

Stabilization measures (include dates of installation

Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.

description:

Start date and duration of sequence (include dates of temporary or final stabilization):

BMPs associated with this sequence:

Stabilization measures (include dates of installation

Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.

[10]

3.3 Potential Sources of Pollutants

The follow table identifies all potential sources (checked activities in column 1) of sediment and other sources of pollution, which may reasonably be expected to affect the quality of stormwater discharges from the construction site.

Se le ct ed

A ct iv ity

(X

Construction Activity

Potential Construction Site Pollutants

Se di m en t

N ut ri en ts

B ac te ri a pH

O il

G re as e

T ra sh

D eb ri s

Pe st ic id es

H ea vy M et al s

O th er

Po llu ta nt s

Clearing, excavating, and grading X X

Fill of roadway embankment, backfill at structures X X

Vehicle/equipment fueling and maintenance X X X

Vehicle/equipment use and storage X X

Sanitary/septic waste X X

Dewatering operations X X

Drilling and blasting operations X X X

Concrete washout and waste X X

Structure construction/painting/cleaning X X X X

Demolition and debris disposal X X X X X

Solid waste (trash and debris) X X

Hazardous waste or contaminated spills X X X

Paving operations X X

Landscaping operations X X X

Mining, rock extraction, crushing X X X

Contractor and PE Note: Fill in all incomplete information following contract award date and prior to start of construction

Construction and waste material expected to be stored on-site includes:

Material Storage Location

[11]

Section 4: Site Maps

Include Vicinity maps in TAB 5.

Include Site maps and erosion and sediment control plan maps for each phase of construction in

TAB 6.

Section 5: Discharges

Industrial stormwater discharges associated with industrial activity other than construction at the site (including dedicated asphalt plants and dedicated concrete plants that are covered by this permit) include:

NOTE: An Industrial Activity Multi-Sector General Permit may be required for some activities.

Industrial Activity Stormwater Discharge Location

Multi-Sector General Permit Number (if applicable)

1. N/A N/A N/A

5.1 Allowable Non-Stormwater Discharges

Non-stormwater discharges used at the construction sited are identified below, along with control measures used to eliminate or reduce the discharges and BMPs used to prevent stormwater contamination.

Applicable to this Project (check all that apply)

Potential Non-Stormwater Discharges Control Measures

To be completed by contractor

Waters used to wash vehicles where detergents are not used Water used to control dust Potable water including uncontaminated water line flushings Construction dewatering (uncontaminated and discharged to upland with no potential to discharge to surface waters)

Ground water or spring water (non-turbid and uncontaminated) Routine external building wash down that does not use detergents

Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used

Foundation or footing drains where flows are not contaminated with process materials such as solvents

Landscape irrigation Discharges from emergency fire-fighting activities Fire hydrant flushings Uncontaminated air conditioning or compressor condensate

NOTE: The likely locations of these discharges are identified on the site map TAB 5 and/or

TAB 6

[12]

5.2 Receiving Waters:

Are there any surface waters located within 50 feet of the construction disturbance? Yes

Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4

1. Coast Fork Willamette River

2. Middle Fork Willamette River

3. Salmon Creek

4. Salt Creek

Impaired Waters/TMDLs: Include all 303(d) category 4 and 5 impaired waters Answer the following for each surface water listed in Table 1:

Is this surface water listed as “impaired?”

What pollutant(s) is causing the impairment?

Has a TMDL been completed?

Pollutant(s) for which there is a TDML

1. Yes No Dissolved Oxygen;

Algal Growth;

Temperature

Yes No Bacteria, Mercury, Temperature

2. Yes No Dissolved Oxygen;

Algal Growth;

Temperature

Yes No Bacteria, Dieldrin, Mercury, Temperature

3. Yes No Dissolved Oxygen;

Algal Growth;

Temperature

Yes No Bacteria, Dieldrin, Mercury, Temperature

4. Yes No Temperature; Dissolved Oxygen; Algal Growth;

Sedimentation

Yes No Bacteria, Dieldrin, Mercury, Temperature

Source used to determine whether or not your project discharges into an impaired water:

Oregon Department of Environmental Quality and EPA

If applicable, documentation of consultation with State TMDL authorities on consistency of ESCP conditions with the approved TMDL is found in TAB 11.

The control measures required to ensure that discharge of pollutants from the site are consistent with the assumptions and requirements of the approved TMDL, including any specific waste-load allocations are included in that documentation.

[13]

5.3 Water Quality Monitoring Requirements

Provisions in Permit Conditions of the applicable NPDES stormwater permit, define additional monitoring and reporting requirements. Details about water quality monitoring and reporting requirements applicable to this project are included in TAB 11. Records of all monitoring information will be retained in TAB 11, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation.

Are engineered soils proposed for use on the project? No

If yes, follow requirements in SCRs 107 and 157 and Section 17.6 of the 1200-CA. pH monitoring is required in discharges from sediment basins when engineered soils are used on the project.

[14]

Section 6: Erosion and Sediment Controls

Control measures at the construction site are selected, installed, implemented, and maintained to minimize pollutants in the discharge as necessary to meet applicable water quality standards.

The objectives of this ESCP include:

• Stabilize the site as soon as possible (targeting the preparation and implementation of erosion and sediment controls to get the site to final grade, and either permanently or temporarily stabilize all bare soil areas as soon as possible).

• Perimeter controls will be installed before ground disturbing activities are initiated.

• Perimeter protection will remain in place until final stabilization has been achieved.

• Slopes and channels will be protected by conveying concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible. Avoid disturbing natural channels and the vegetation along natural channels as much as possible.

• Divert stormwater coming on to the site by conveying it safely around, through, or under the work area. (Divert the clean water, trap the dirty water.)

• Protect receiving waters and other environmentally sensitive waters or areas adjacent to the site.

• Follow pollution prevention measures by providing proper containers for waste and garbage at the site. Store hazardous materials and chemicals so that they are not exposed to stormwater.

• Minimize the area and duration of exposed soils. Clear only land that will be under construction in the near future.

6.1 Perimeter Controls

All Perimeter Sediment Controls will be installed prior to ground disturbing activities taking place. There will be no clearing or grubbing outside the physical clearance limits.

Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.

The following perimeter controls will be implemented:

Measure: Silt Fence, Orange Construction Fencing, Fiber Rolls Implementation: Place orange construction fence around construction site and areas not to be disturbed prior to beginning construction disturbance activities. Place silt fence and/or fiber rolls between work area and stream(s) prior to construction disturbance. Place fiber rolls around toe of material stockpiles.

Maintenance: As needed

Note: Add additional measures used during construction.

[15]

6.2 Sediment Track-Out

The following methods will be implemented to minimize off-site vehicle tracking of sediment onto paved surfaces. If sediment escapes the construction site, off-site accumulations of sediment will be removed by the end of the same business day after discovery.

Locations and design specifications of BMPs are shown on the erosion and sediment control plan

☐ Not applicable to this project. Reason: Click here to enter text.

If applicable:

Measure: Stabilized construction exit Implementation: Place/construct stabilized construction exit at construction access locations prior to construction activities.

Maintenance: As needed

6.3 Stockpiled Soil or Other Erodible Materials

Stockpile management includes measures to minimize surface erosion and sediment transport from soil stockpiles or other erodible materials.

Locate erodible stockpiles away from natural buffers and drainages including storm sewer inlets and culvert inlets.

Stabilize or cover stockpiles at the end of the workday and before extended breaks in construction if a storm event is forecasted that may result in discharge from the site or if wind speeds greater than 10 mph are forecasted.

Locations of stockpiles are shown on the erosion and sediment control plan sheets in TAB 6.

☐ Not applicable to this project. Reason: Click here to enter text.

If applicable:

Measure: Fiber rolls and tarps covering stockpiles Implementation: During and after stockpile placement Maintenance: As needed

[16]

6.4 Minimize Dust

Dust control includes practices used to reduce or prevent the surface and air transport of dust during construction. Cover all sediment loads leaving the site and when trucking saturated soils from the site, use water-tight trucks or drain loads on site.

☐ Not applicable to this project. Reason: Click here to enter text.

Measure: Water truck used for dust control on construction access roads and site Implementation: As needed Maintenance: As needed

6.5 Minimize Disturbance of Steep Slopes

Describe how disturbance of steep slopes will be minimized. Describe controls (e.g. erosion control blankets, tackifiers) that will be implemented to minimize sediment discharges from slope disturbances.

If applicable, describe how stormwater run-on and run-off will be managed. Flows may be diverted from exposed soils by retaining/detaining flows or otherwise minimizing runoff and the discharge of pollutants from exposed areas of the site. Placement of structural practices in floodplains will be avoided to the degree technologically and economically practicable and achievable.

☒ Not applicable to this project. Reason: Click here to enter text.

If applicable:

Measure: Click here to enter text.

Implementation: Click here to enter text.

Maintenance: Click here to enter text.

6.6 Topsoil Conservation

Describe how topsoil will be preserved, if feasible. If conservation of topsoil is infeasible, explain why, and describe alternate methods to be used to insure optimum vegetation survival and growth.

[17]

Erosion and sediment control measures for topsoil stockpiles (and other erodible materials) are shown in section 4.4.

☒ Conservation of topsoil is Infeasible:

Reason: Riprap to be placed in excavated areas.

Alternate method: Disturbed areas outside of riprap placement will be hydroseeded after no further disturbance occurs.

☐ Conservation of topsoil is Feasible:

Measure: Click here to enter text.

Implementation: Click here to enter text.

Maintenance: Click here to enter text.

6.7 Minimize Soil Compaction

Minimize soil compaction in areas where final vegetative stabilization will occur and where infiltration practices will be installed.

☐ Not applicable to this project. Reason: Click here to enter text.

If applicable:

Measure: Restrict equipment use, loosen compact soil for planting, use of existing access roads.

Implementation: During active construction Maintenance: As needed

6.8 Storm Drain Inlets and Culvert Inlets

Applicable for stormwater drain inlets which are connected to separate storm sewer systems (usually in urban locations) AND for culvert inlets that discharge stormwater from the project into surface waters.

Remove accumulated sediment adjacent to inlet protection measures by the end of the same day it is identified, or by the end of the following day if removal the same day is not feasible.

Locations and design specifications of BMPs are shown on the erosion and sediment control plan

☒ Not applicable to this project. Reason: Click here to enter text.

[18]

The following BMPs are applicable to:

☐ Storm Drain Inlets ☐ Culvert Inlets

Measure: Click here to enter text.

Implementation: Click here to enter text.

Maintenance: Click here to enter text.

Contractor and PE Note: Add additional measures used during construction.

6.9 Constructed Stormwater Conveyance Channels and Culvert Outlets

Describe velocity dissipation and/or erosion control devices to be installed at stormwater conveyance channels (such as roadside ditches) and culvert outlets. Includes permanent and temporary devices (specify).

Velocity dissipation devices will be placed at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g., no significant changes in the hydrological regime of the receiving water).

Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.

☒ Not applicable to this project.

If applicable:

Measure: Click here to enter text.

Implementation: Click here to enter text.

Maintenance: Click here to enter text.

6.10 Sediment Basins

If applicable, provide site design specifications and other details for design of sediment basins and ponds. This may also include sediment infiltration swales. If an engineered sediment basin or similar impoundment is installed, follow the requirements of the 1200-CA. Include design storm method and calculations used to design the sediment basin.

Locations and design specifications of BMPs are shown on the erosion and sediment control plan

[19]

At a minimum, sediment ponds must provide storage for either the calculated volume of runoff from the 2-year, 24-hour storm event or 3,600 cubic feet per acre drained. Sediment ponds must also use outlet structures that withdraw water from the surface, unless infeasible.

☒ Not applicable to this project.

If applicable, type of sediment retention/infiltration used: Click here to enter text.

Design description: Click here to enter text.

6.11 Chemical Treatment

If chemical sediment control (such as polymers) will be used, provide design specifications and other details considered when choosing treatment type and locations.

☒ Not applicable to this project.

NOTE: If use of cationic treatment chemicals is planned, separate prior approval is required.

Locations of chemical treatment sites are shown on the erosion and sediment control plan sheets in TAB 6.

Describe/name treatment chemicals that will be used and why these chemicals are suited to site soil characteristics and other construction site conditions: Click here to enter text.

Describe treatment system specifications and dosage of chemicals to be used: Click here to enter text.

Describe storage of chemicals and other material safety data: Click here to enter text.

Special controls to be used for Cationic treatment chemicals: Click here to enter text.

Describe training that personnel handling/applying treatment chemicals have/will receive: Click here to enter text.

6.12 Dewatering Practices

Discharge of ground water or accumulated stormwater that is removed from excavations, trenches, foundations, etc. into surface waters is prohibited unless such waters are first effectively managed by appropriate sediment controls. Uncontaminated non-turbid dewatering water can be discharge without being routed to a control.

☐ Not applicable to this project

[20]

Measure: Cofferdams and dewatering pumps with spill containments kit and sediment socks.

Discharge storm water to natural vegetative buffer. Temporary bridge spanning wetted perimeter for side channel/upstream pools at Bridge 07894 (Barnard).

Implementation: Prior to and during dewatering/construction activities

Maintenance: As needed

6.13 Erosion Control and Stabilization

Commence temporary soil stabilization measures immediately if no further disturbance of an area of the site or stockpile is expected within the next 14 days. Complete temporary soil stabilization measures to disturbed sites or stockpiles as soon as practicable, but no later than 7 days of last disturbance.

Provide for temporary stabilization of all exposed soil prior to winter construction shut down. Specify whether stabilization measure is temporary or permanent.

☒ Temporary Measures:

Measure: Stockpiles covered in tarps.

Implementation: Stockpiles will be covered in tarps per 1200-CA requirements.

Note: Add additional measures used during construction. If using seed, provide composition of seed mix and other plant types used to establish temporary cover.

☒ Permanent Measures:

Practice/Measure: Riprap and willow stakes

Implementation: Contractor will perform riprap placement as specified in the plans. Willow stakes will be planted in the riprap and along the bank as verified in the field by the CO.

6.14 Removal of BMPs

Remove erosion and sediment control BMPs that are no longer needed and leave in good working order those BMPs that will remain at the construction site after close-out.

[21]

BMPs are no longer needed when the site that the BMP is protecting has reached final stabilization.

Final stabilization means:

• All ground disturbing activities at the site have been completed, AND

• Vegetation has been established that provides a uniform perennial vegetative cover with a density of 70% of the natural vegetative cover prior to construction.

• For sites where it is difficult to establish 70 percent coverage (e.g., arid, semiarid or drought-stricken areas), the registrant must cover exposed soil between planted or seeded areas with bio or photo degradable controls designed to prevent erosion without active maintenance or propose a site-specific plan to DEQ for approval.

Document arid/semi-arid conditions in ESCP

• Effective non-vegetative stabilization is in-place such as rip rap, gabions, geotextiles, rock, aggregate etc.

6.15 Post Construction Measures

Responsibility for NPDES permit compliance after construction close-out will be the responsibility of:

☐ FHWA/WFLHD

☐ Land Management/Owner Agency Specify Agency: Choose an item.

☒ County/State DOT

[22]

Section 7: Operational Controls/Good Housekeeping Measures

7.1 Spill Prevention, Control and Countermeasure Plan

Spills and potential stormwater contamination will be controlled to reduce the chance of spills, stop the source of spills, contain and clean up spills, and dispose of materials contaminated by spills.

Spill prevention and response actions are outlined in the Spill Prevention, Control, and Countermeasure Plan (SPCC), TAB 15.

Implementation: Prior to construction activities and throughout construction.

7.2 Spills/Releases in Excess of Reportable Quantities

This permit does not provide authorization to discharge hazardous substances or oil resulting from an on-site spill. This permit does not provide relief from the federal reporting requirements of 40 CFR Part 110, 40 CFR Part 117 and 40 CFR Part 302 relating to spills or other releases of oils or hazardous substances.

For a release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117 or 40 CFR Part 302, occurs during a 24-hour period:

• Notice will be provided to the National Response Center (800–424–8802) in accordance with the requirements of 40 CFR Part 110, 40 CFR Part 117 and 40 CFR Part 302 as soon as site staff have knowledge of the discharge; and written notice will be provided within 7 calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of a release.

• Notify Oregon Emergency Response System at (800) 452-0311 of spills or discharges containing hazardous substance or oil.

• Measures to prevent the reoccurrence of such releases will be implemented.

7.3 Equipment/Vehicle Fueling and Maintenance Practices

On-site fueling areas will have a spill kit present, visible, and maintained. Employees and subcontractors will receive training regarding equipment/vehicle fueling and maintenance practices, including proper fueling procedures, proper use of pumps, emergency shutoff valves (training efforts documented in TAB 12).

On-site vehicles and equipment will be inspected daily for leaks, equipment damage, and other service problems.

Designate vehicle/equipment service will be marked and the areas will be located away from drainage facilities and watercourses to prevent stormwater run-on and runoff. Designated washout areas will be shown on the ESCP plan sheets (TAB 6).

[23]

Drip pans, drip cloths, or absorbent pads will be used when replacing spent fluids. All spent fluids will be collected and store in appropriate labeled containers in the proper storage areas.

Implementation: Prior to construction activities and throughout construction.

7.4 Equipment/Vehicle Washing

Equipment/vehicle washing and allowable non-stormwater will be controlled using procedures and practices include using off-site facilities; washing in designated, contained areas only;

eliminating discharges to the storm drain by infiltrating the wash water or routing to the sanitary sewer. The locations of equipment/vehicle washing areas, storm drains, tributary drainage areas, and surface waterbodies on or near the site are shown and updated on the ESCP plan sheets

(TAB 6).

7.5 Material Handling and Waste Management

Measures will be put in place and maintained to prevent the discharge of solid materials to receiving waters, except as authorized by a permit issued under the §404 permit.

• Designated trash and bulk waste-collection areas on-site (location of areas are shown and updated on plan sheets, TAB 6). Keep waste container lids closed when not in use and close lid at the end of the business day. For waste containers that do not have lids, provide a cover (e.g., tarp, plastic sheeting) to prevent exposure to precipitation.

• Litter and debris from the construction will be cleaned up on a daily basis.

• Waste-collection areas will be located away from streets, gutters, watercourses, and storm drains. Secondary containment around waste collection areas will be implemented if needed to further minimize the likelihood of contaminated discharges.

• Portable restrooms will be located away from streets, gutters, watercourses, and storm drains (location of areas are shown and updated on plan sheets, TAB 6). Secondary containment around waste collection areas will be implemented if needed to further minimize the likelihood of contaminated discharges.

• Portable restrooms will have tie-downs or stake downs in areas of high winds or susceptibility to vandalism.

• Hazardous waste-collection areas will be designated on-site (location of areas are shown and updated on plan sheets, TAB 6). Secondary containment around waste collection areas will be implemented if needed to further minimize the likelihood of contaminated discharges.

• Hazardous waste containers will be routinely inspected to ensure that all containers are labeled properly and that no leaks are present.

Implementation: Throughout construction.

[24]

7.6 Designate Concrete Washout Areas

Concrete washout areas on-site, designate specific washout areas, and design facilities to handle anticipated washout water will be installed. Washout areas will also be provided for paint and stucco operations as applicable. Washout areas will be located at least 50 yards away from storm drains and watercourses. If this is not possible, prefabricated washout containers will be used.

Alternatively, constructed washout areas may be used either by digging a pit and lining it with 10 mil plastic sheeting or creating an aboveground structure from straw bales or sandbags with a plastic liner. Designate washout areas will be shown on the erosion control plan sheets (TAB 6).

☒ Not applicable to this project

The following precautions will be implemented:

• Concrete trucks or equipment will not be washed out into storm drains, streets, gutters, uncontained areas, or any watercourses.

• Washout areas will be established prior to commencing the activity and their locations advertise with signs or delineators.

• Concrete wastewater must be directed into an impermeable-lined pit or leak-proof container sufficiently sized to avoid overflows.

• Washout structures will be routinely inspected to detect leaks or tears and to identify when materials need to be removed.

• Materials will be disposed of properly (for example, allow the water to evaporate and to recycle the hardened concrete).

• Inspections will include looking for evidence that contractors are using the washout areas and not dumping materials onto the ground or into drainage facilities. If the washout areas are not being used regularly, additional signage will be posted or the facility will be relocated to a more convenient location.

• Employees and subcontractors will receive training regarding designated washout areas, including proper handling and storage practices (training efforts documented in TAB 12).

[25]

Section 8: INSPECTIONS

8.1 Inspection Frequency

Inspections will be conducted in accordance with the following schedule(s):

Inspect all erosion and sediment control measures once every 14 days and within 24 hours of a storm event that results in discharge from the site, and/or when there is runoff from snowmelt sufficient to cause a discharge.

Inspection frequency may be reduced in accordance with the 1200-CA permit and SCR 157.14.

Inspections will be conducted by qualified personnel as required in SCR Section 157. Inspector qualifications are documented in TAB 12.

The WFL Inspection Report template will be used for all inspections. All completed Inspection Reports will be signed in accordance with the 1200-CA and SCR 107.01A.

Completed Inspection Reports are filed in TAB 9.

8.2 Corrective Actions

Corrective action is required for the following reasons and as stated in the 1200-CA:

(a) Discharges are causing an exceedance of water quality standards or there is visible turbidity in surface waters or a conveyance system leading to surface waters.

(b) An erosion and sediment control device necessary to comply with the 1200-CA was not installed or installed incorrectly.

(c) A prohibited discharge has occurred according to Section 12 of the 1200-CA.

Corrective actions will be started immediately and completed within 24 hours of discovery.

Temporary steps may be required to prevent or minimize discharge of pollutants until a permanent solution is installed; including cleaning any contaminated surfaces so that material will not discharge in subsequent storm events. If infeasible to implement corrective action within 24 hours, document reasons in the corrective action log in the ESCP and identify the schedule for repair.

All corrective actions will be signed/approved as required in the 1200-CA, SCR 107.01A, and 157.

All corrective actions will be recorded in the Corrective Action Log found in TAB 10.

Corrective actions requiring changes to the erosion and sediment control plans or ESCP narrative will be recorded on the Erosion and Sediment Control plan sheets in TAB 6 and in the ESCP narrative in TAB 1.

[26]

Section 9: Delegations of Authority

Operators Delegations of Authority for the purpose of overseeing compliance with environmental requirements, including the 1200-CA, at the construction site is documented in

TAB 4.

The designee is authorized to sign any reports, stormwater pollution prevention plans (ESCP) modifications and all other documents required by the 1200-CA.

Section 10: Staff Training

Prior to earth-disturbing activities or pollutant-generating activities, the following construction personnel will receive training to understand the requirements of the 1200-CA and their specific responsibilities:

• Personnel responsible for installation, maintenance, or repair of stormwater control BMPs;

• Personnel responsible for the application and storage of treatment chemicals (if applicable);

• Personnel responsible for conducting inspections;

• Personnel responsible for taking corrective actions

The General Contractor will provide an Erosion Control Supervisor (ECS) and Visual Monitoring Inspector for the project who meets one of the following criteria:

(a) Certified Professional in Erosion and Sediment Control (CPESC);

(b) Certified Professional in Storm Water Quality (CPSWQ);

(c) Certified Inspector of Sediment and Erosion Control (CISEC);

(d) Washington State Certified Erosion and Sediment Control Lead (CESCL);

(e) Rogue Valley Sewer Services Erosion and Sediment Control Certification;

(f) Other Oregon DEQ-Approved Erosion and Sediment Control Certification.

All training and certifications are documented in TAB 12.

[27]

Section 11: Certification and Notification

“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”

For FHWA, Western Federal Lands Highway Division:

Name: Scott Smithline Title: Environmental Manager

Signature: Date:

Project ESCP of Record Approval following General Contractor modifications.

For FHWA, Western Federal Lands Highway Division:

Name: Scott Smithline Title: Environmental Manager

Signature: Date:

Tab 2 - OR DEQ Permit (1200-CA)

Appendix A - Environmental Management Plan Review Applications for Contaminated Media Management & Active Chemical Treatment Systems August 2022

WQ Permitting 700 NE Multnomah St.

Suite 600 Portland, OR 97232 Phone: 503-229-5185 800-452-4011 Fax: 503-229-6124 Contact: Blair Edwards www.oregon.gov/DEQ

DEQ is a leader in restoring, maintaining and enhancing the quality of Oregon’s air, land and water.

file://deq000/Templates/General/www.oregon.gov/DEQ

This report prepared by:

Oregon Department of Environmental Quality

700 NE Multnomah Street, Suite 600

Portland, OR 97232

1-800-452-4011 www.oregon.gov/deq

Contact:

Blair Edwards

503-229-5185

DEQ can provide documents in an alternate format or in a language other than English upon request. Call DEQ at 800-452-4011 or email deqinfo@deq.state.or.us.

http://www.oregon.gov/deq mailto:deqinfo@deq.state.or.us

Executive Summary

Contaminated Media Management

Contaminated Media Environmental Management Plan Review Application

Active Chemical Treatment Systems

Active Chemical Treatment System Environmental Management Plan Review Application

Executive Summary The purpose of this Appendix is to assist 1200-CA permit registrants in complying with the requirements of Section 6 regarding DEQ review and approval of a contaminated media management plan (CMMP) or an active chemical treatment system. The permit registrant must complete an Environmental Management Plan (EMP) application, pay the review fee (See Table 70F), and submit to DEQ the required documents found on DEQ’s website and electronic reporting system when contaminated soil, contaminated groundwater or hazardous materials exist or are anticipated to be encountered during construction activities. If contaminated soil, contaminated groundwater or hazardous materials are discovered on a construction project site after construction activities are initiated, the EMP application must be submitted and approved before discharges from areas exposed to contaminated media will be authorized. The approved EMP becomes a component of the Erosion and Sediment Control Plan.

Contaminated Media Management This Section of Appendix A provides the Environmental Management Plan review application form for construction projects that will or have the potential of encountering contaminated soils, contaminated groundwater, or hazardous materials during construction activities.