This solicitation is for a construction project to improve a 35.88 mile section of OR58 between Coast Fork Willamette River and Lower Salt Cr Bridges in Lane County, Oregon. The project includes replacing or rehabilitating bridges and pavements along the route. The contract will be a firm fixed-price agreement awarded through a sealed bid process. The estimated value is between $15-20 million. Bids are due through the federal SAM.gov system by the date specified in solicitation number 69056723B000010. The selected contractor will be responsible for completing all construction work. The sponsoring agency is the Oregon Department of Transportation in partnership with the Federal Highway Administration.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Expires: 12-31-2022
BRENT L COE Digitally signed by BRENT L COE Date: 2023.01.17 11:25:53 -08'00'
I.1 UTILITY DETAILS
I. MISCELLANEOUS DETAILS
H.2-3 GUARDRAIL STANDARD DRAWINGS
H.1 GUARDRAIL PLAN/PLAN
H. GUARDRAIL
G.5 DITCH RECONDITIONING
G.2-4 STANDARD DRAWINGS
G.1 TABUATION OF DRAINAGE QUANTITIES
G. DRAINAGE
F.6-9 STANDARD DETAILS FOR EROSION CONTROL
F.2-5 SOIL EROSION AND SEDIMENT CONTROL PLANS
F.1 TABULATION OF SOIL EROSION AND SEDIMENT CONTROL QUANTITIES
F. SOIL EROSION AND SEDIMENT CONTROL
E.1 APPROACH ROAD DETAILS
E. APPROACHES
D.7 SURVEY CONTROL
D.6 PLAN AND PROFILE 685+20 TO 692+00
D.2-5 PLAN AND PLAN
D.1 TABULATION OF PLAN QUANTITIES
D. PLAN-PROFILE
C.3
C.2
C.1 TABULATION OF TYPICAL SECTION QUANTITIES
C. TYPICAL SECTIONS
B.1-2 SUMMARY OF QUANTITIES
B. SUMMARY OF QUANTITIES
A.4 VICINITY MAP
A.3 PLAN SYMBOLS AND ABBREVIATIONS
A.2 INDEX TO SHEETS
A.1 TITLE SHEET
A. GENERAL INFORMATION
I N D E X T O S H E E T S
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
:4
P M
J a n u a r y
D e f a u lt
F
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r a b .d g n
OR DOT 18(1)
P
D r u y v e s te in D
L a u tz e n h e is e r
/2
/2
C h e c k e d b y
D e s ig n e d b y
55V-066
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
M a y
:2 A
M
U S
C
R iv e r s id e R o a d I m p r o v e m e n ts
\d g n \i d a R iv e r s id e \i d a a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3DOT 18(1)OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
F O R E S T
N A T I O N A L
WILLAMETTE
Springfield
Oakridge
Creswell
Cottage Grove
Lowell
T 18 S
T 17 S
N
R
W
R
W
R
W
R
W
R
W
R
W
R
E
R
W
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
.5 E
R
E
T 18 S
T 17 S
T 18 S
T 17 S
T 18 S
T 17 S
T 18 S
T 17 S
T 18 S
T 17 S
End Bridge: Lat. 43.980600, Long. -122.966213 Begin Bridge: Lat. 43.980843, Long. -122.966810
MP 2.46
Coast Fork Willamette River Bridge 05286
SCHEDULE A
End Bridge: Lat. 43.747139, Long. -122.510019 Begin Bridge: Lat. 43.746861, Long. -122.511327
(Barnard) MP 33.24 Willamette River Bridge 07894
OPTION Z
End Bridge: Lat. 43.740671, Long. -122.459572 Begin Bridge: Lat. 43.740187, Long. -122.459081
MP 35.99
Salmon Creek Bridge 02073C
SCHEDULE A
End Bridge: Lat. 43.730212, Long. -122.419924 Begin Bridge: Lat. 43.730043, Long. -122.419073
MP 38.26
(Lower) Salt Creek Bridge 01519A
SCHEDULE A
To US97
Scale in miles
6 3 0 6 12 18
55V-066
VICINITY MAP
A.4
STATE PROJECT
NUMBER
SHEET
:5
A
D e c e m b e r
U S
S u r_ ft
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r a d .d g n
OR DOT 18(1)
P
D r u y v e s te in D
L a u tz e n h e is e r
/2
/2
C h e c k e d b y
D e s ig n e d b y
F O R E S T
N A T I O N A L
WILLAMETTE
Springfield
Oakridge
Creswell
Cottage Grove
Lowell
T 18 S
T 17 S
N
R
W
R
W
R
W
R
W
R
W
R
W
R
E
R
W
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
.5 E
R
E
T 18 S
T 17 S
T 18 S
T 17 S
T 18 S
T 17 S
T 18 S
T 17 S
T 18 S
T 17 S
End Bridge: Lat. 43.980600, Long. -122.966213 Begin Bridge: Lat. 43.980843, Long. -122.966810
MP 2.46
Coast Fork Willamette River Bridge 05286
SCHEDULE A
End Bridge: Lat. 43.747139, Long. -122.510019 Begin Bridge: Lat. 43.746861, Long. -122.511327
(Barnard) MP 33.24 Willamette River Bridge 07894
OPTION Z
End Bridge: Lat. 43.740671, Long. -122.459572 Begin Bridge: Lat. 43.740187, Long. -122.459081
MP 35.99
Salmon Creek Bridge 02073C
SCHEDULE A
End Bridge: Lat. 43.730212, Long. -122.419924 Begin Bridge: Lat. 43.730043, Long. -122.419073
MP 38.26
(Lower) Salt Creek Bridge 01519A
SCHEDULE A
To US97
Scale in miles
6 3 0 6 12 18
Sheet and Description
SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
SITE PLAN
SOIL EROSION
AND SEDIMENT
CONTROL
LANDSCAPING
AND
REVEGETATION
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE 05286
COAST FORK
WILLAMETTE
RIVER BRIDGE
RETROFIT
OPTION Z BRIDGE
07894
WILLAMETTE
RIVER (BARNARD)
BRIDGE RETROFIT
BRIDGE
02073C
SALMON CREEK
BRIDGE
RETROFIT
BRIDGE
01519A
(LOWER) SALT
CREEK BRIDGE
RETROFIT
ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 884 86 970
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 1,350 80 1,430
A0160 15706-1600 SOIL EROSION CONTROL,
STABILIZED CONSTRUCTION EXIT EACH 8 6
A0180 20304-4000 REMOVAL OF BRIDGE
SUPERSTRUCTURE (END FRAMES) LPSM All ALL
A0200 20304-5000 REMOVAL OF BUILDING (USGS
GAGE STATION) LPSM All ALL
A0220 20305-1000 REMOVAL OF CONCRETE CUYD 49 3 52
A0240 20801-0000 STRUCTURE EXCAVATION CUYD 1,846 250 21 2,117 Contract Quantity
A0260 20811-0000 SHORING AND BRACING SQFT 540 10 550
A0280 20815-0000 COFFERDAMS LPSM All ALL
A0300 20820-0000 DEWATERING LPSM All ALL
A0320 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 1,520 175 1,695
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 98 98
A0360 40302-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 (2" THICKNESS) SQYD 818 818
A0380 41301-0600 ASPHALT PAVEMENT MILLING,
2-INCH DEPTH SQYD 818 818
A0400 41401-2000 CRACKS, CLEANING AND SEALING LNFT 288 62 350
A0420 50201-0000 CONCRETE PAVEMENT
RESTORATION, PAVEMENT PATCH SQYD 20 20
A0440 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 668 44 5 26 743
A0460 55220-0000 REPAIR CONCRETE SQYD 35 5 40
A0480 55225-0000 CLEAN AND RESEAL JOINTS LNFT 69 11 80
A0500 55235-0000 EXPANSION JOINTS (ASPHALTIC
PLUG SEAL) LNFT 78 78
A0520 55401-1000 REINFORCING STEEL LB 182,135 14,980 2,802 3,203 203,120 Contract Quantity
MileStone: 100% Base + Option
Date Completed: 01/05/23
Report Date: 01/05/23
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A
-J a n -2
:5 P
M
Remarks and/or
Determination of Estimated
Quantity
Pay Item Description Unit
Estimated
Quantities F
.0
O
R R e tr o fi t
B ri d g e F in a l D e s ig n \D o c s \Q u a n ti ti e s a n d C o s t
E s ti m a te
S u m m a ry o f Q u a n ti ti e s .x ls m
]S h e e t
STATE PROJECT
B.1DOT 18(1)OR
SHEET
NUMBER
SITE PLAN
SOIL EROSION
AND SEDIMENT
CONTROL
LANDSCAPING
AND
REVEGETATION
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE 05286
COAST FORK
WILLAMETTE
RIVER BRIDGE
RETROFIT
OPTION Z BRIDGE
07894
WILLAMETTE
RIVER (BARNARD)
BRIDGE RETROFIT
BRIDGE
02073C
SALMON CREEK
BRIDGE
RETROFIT
BRIDGE
01519A
(LOWER) SALT
CREEK BRIDGE
RETROFIT
ALLOWANCE
Bid
Schedule
A0540 55501-0000 STRUCTURAL STEEL (RIVET
REPLACEMENT) LPSM All ALL
A0560 55506-0000 MISCELLANEOUS STEEL (END
FRAME) EACH 6 6
A0580 55506-0000 MISCELLANEOUS STEEL (SEAT
BRACKET) EACH 72 72
A0600 55506-0000 MISCELLANEOUS STEEL (TRUSS
ANCHORING SYSTEM) EACH 4 4
A0620 55506-0000 MISCELLANEOUS STEEL (END
ANCHORAGE) EACH 8 8
A0640 55506-0000 MISCELLANEOUS STEEL
(JACKETING) EACH 4 4
A0660 55901-0000 MEMBRANE WATERPROOFING SQYD 818 818
A0680 56101-0000 STRUCTURAL CONCRETE INJECTION
AND CRACK REPAIR LNFT 794 56 850
A0700 56203-0000 TEMPORARY SUPPORT STRUCTURE
(BRIDGE JACKING) EACH 4 4
A0720 56203-0000 TEMPORARY SUPPORT STRUCTURE
(BRIDGE JACKING) EACH 2 2
A0740 56302-2000 PAINTING, STEEL STRUCTURE
(SUBSTRUCTURE) SQFT 3,160 190 3,350
A0760 56302-2000 PAINTING, STEEL STRUCTURE SQFT 1,340 160 1,500
A0780 56302-2000 PAINTING, STEEL STRUCTURE SQFT 2,250 100 2,350
A0800 56401-3000 BEARING DEVICE, SLIDING EACH 6 6
A0820 56701-0000 MICROPILE LNFT 1,776 750 158 2,684
A0840 56705-0000 MICROPILE LOAD VERIFICATION
TEST EACH 1 1 2
A0860 56706-0000 MICROPILE PROOF LOAD TEST EACH 2 2 4
A0880 57501-0000 MINOR BRIDGE WORK LPSM All ALL
A0900 57705-0200 FIBER REINFORCED POLYMER Contract Quantity
(FRP), STRENGTHENING SYSTEM
(CFRP) SQFT 888 32 920
A0920 57705-0200 FIBER REINFORCED POLYMER Contract Quantity
(FRP), STRENGTHENING SYSTEM
(CFRP) SQFT 1,470 70 1,540
A0940 60103-4200 CONCRETE, PLANK (REMOVE AND
RESET) EACH 4 4
A0960 60510-0300 4-INCH COLLECTOR PIPE LNFT 3,864 36 3,900
A0980 61601-1000 SLOPE PAVING, CONCRETE SQYD 334 16 350
-J a n -2
:5 P
M
MileStone: 100% Base + Option
Date Completed: 01/05/23
Report Date: 01/05/23
F
.0
O
R R e tr o fi t
B ri d g e F in a l D e s ig n \D o c s \Q u a n ti ti e s a n d C o s t
E s ti m a te
S u m m a ry o f Q u a n ti ti e s .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B.2DOT 18(1)OR
SHEET
SITE PLAN
SOIL EROSION
AND SEDIMENT
CONTROL
LANDSCAPING
AND
REVEGETATION
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE 05286
COAST FORK
WILLAMETTE
RIVER BRIDGE
RETROFIT
OPTION Z BRIDGE
07894
WILLAMETTE
RIVER (BARNARD)
BRIDGE RETROFIT
BRIDGE
02073C
SALMON CREEK
BRIDGE
RETROFIT
BRIDGE
01519A
(LOWER) SALT
CREEK BRIDGE
RETROFIT
ALLOWANCE
Bid
Schedule
A1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A1020 62201-0500 BACKHOE LOADER, 4 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 4-WHEEL DRIVE HOUR 40
A1040 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 40
A1060 62201-3750 CHAIN SAW HOUR 20
A1080 62301-0000 GENERAL LABOR HOUR 160
A1100 62501-0000 TURF ESTABLISHMENT ACRE 1.2 0.3 1.5 Contract Quantity
A1120 62635-3000 CUTTINGS, WILLOW POLE EACH 452 38 490
A1140 63302-0000 SIGN SYSTEM SQFT 32 32
A1160 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID LNFT 1,868 12 1,880
A1180 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
A1200 63502-0300 TEMPORARY TRAFFIC CONTROL,
ARROW BOARD, TYPE C EACH 2 2
A1220 63502-0500 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 2 EACH 4 1 5
A1240 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 9 1 10
A1260 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 190 22 212
A1280 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 113 13 126
A1300 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 6 6
A1320 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 278 39 317
A1340 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 1,056 92 1,148
A1360 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 528 46 574
A1380 64620-0000 REMOVE AND RESET (BOAT RAMP) EACH 1 1
-J a n -2
:5 P
M
MileStone: 100% Base + Option
Date Completed: 01/05/23
Report Date: 01/05/23
F
.0
O
R R e tr o fi t
B ri d g e F in a l D e s ig n \D o c s \Q u a n ti ti e s a n d C o s t
E s ti m a te
S u m m a ry o f Q u a n ti ti e s .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B.3DOT 18(1)OR
SHEET
SITE PLAN
SOIL EROSION
AND SEDIMENT
CONTROL
LANDSCAPING
AND
REVEGETATION
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE 05286
COAST FORK
WILLAMETTE
RIVER BRIDGE
RETROFIT
OPTION Z BRIDGE
07894
WILLAMETTE
RIVER (BARNARD)
BRIDGE RETROFIT
BRIDGE
02073C
SALMON CREEK
BRIDGE
RETROFIT
BRIDGE
01519A
(LOWER) SALT
CREEK BRIDGE
RETROFIT
ALLOWANCE
Bid
Schedule
Z0020 15101-0000 MOBILIZATION LPSM ALL
Z0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
Z0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
Z0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Z0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Z0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 210 20 230
Z0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 730 40 770
Z0160 15706-1600 SOIL EROSION CONTROL,
STABILIZED CONSTRUCTION EXIT EACH 2 2
Z0180 20120-1000 REMOVAL, INDIVIDUAL TREE EACH 20 10 30
Z0200 20305-1000 REMOVAL OF CONCRETE CUYD 35 3 38
Z0220 20801-0000 STRUCTURE EXCAVATION CUYD 1,962 10 1,972 Contract Quantity
Z0240 20815-0000 COFFERDAMS LPSM All ALL
Z0260 20820-0000 DEWATERING LPSM All ALL
Z0280 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 1,455 165 1,620
Z0300 50201-0000 CONCRETE PAVEMENT
RESTORATION, PAVEMENT PATCH SQYD 25 20 45
Z0320 55106-1000 SHEET PILE, IN PLACE (TIE
BACK) LPSM All ALL
Z0340 55106-1000 SHEET PILE, IN PLACE LPSM All ALL
Z0360 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 442 25 467
Z0380 55201-1200 STRUCTURAL CONCRETE, CLASS S Contract Quantity
(SEAL) CUYD 169 17 186
Z0400 55235-0000 EXPANSION JOINTS (ASPHALTIC
PLUG SEAL) LNFT 78 78
Z0420 55401-1000 REINFORCING STEEL LB 69,219 1,001 70,220 Contract Quantity
Z0440 55501-0000 STRUCTURAL STEEL (BOLT
REPLACEMENT) LPSM All ALL
Z0460 55506-0000 MISCELLANEOUS STEEL
(JACKETING) EACH 8 8
Z0480 56302-2000 PAINTING, STEEL STRUCTURE SQFT 1,610 190 1,800
Z0500 56701-0000 MICROPILE LNFT 1,764 36 1,800
Z0520 56705-0000 MICROPILE LOAD VERIFICATION
TEST EACH 2 2
-J a n -2
:5 P
M
MileStone: 100% Base + Option
Date Completed: 01/05/23
Report Date: 01/05/23
F
.0
O
R R e tr o fi t
B ri d g e F in a l D e s ig n \D o c s \Q u a n ti ti e s a n d C o s t
E s ti m a te
S u m m a ry o f Q u a n ti ti e s .x ls m
]S h e e t
(4
SUMMARY OF QUANTITIES - Option Z
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B.4DOT 18(1)OR
SHEET
SITE PLAN
SOIL EROSION
AND SEDIMENT
CONTROL
LANDSCAPING
AND
REVEGETATION
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE 05286
COAST FORK
WILLAMETTE
RIVER BRIDGE
RETROFIT
OPTION Z BRIDGE
07894
WILLAMETTE
RIVER (BARNARD)
BRIDGE RETROFIT
BRIDGE
02073C
SALMON CREEK
BRIDGE
RETROFIT
BRIDGE
01519A
(LOWER) SALT
CREEK BRIDGE
RETROFIT
ALLOWANCE
Bid
Schedule
Z0540 56706-0000 MICROPILE PROOF LOAD TEST EACH 4 4
Z0560 56901-0000 CONCRETE OVERLAY, CLASS MPCO SQYD 2,120 2,120
Z0580 57705-0200 FIBER REINFORCED POLYMER Contract Quantity
(FRP), STRENGTHENING SYSTEM
(CFRP) SQFT 2,057 103 2,160
Z0600 62501-0000 TURF ESTABLISHMENT ACRE 0.8 0.2 1.0 Contract Quantity
Z0620 62630-0350 PLANTINGS, TREES, BALLED AND
BURLAPPED EACH 40 20 60
Z0640 62635-3000 CUTTINGS, WILLOW POLE EACH 480 30 510
Z0660 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID LNFT 2,368 12 2,380
Z0680 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN LNFT 1,184 16 1,200
Z0700 63502-0500 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 2 EACH 2 2
Z0720 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 2 2
Z0740 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 28 28
Z0760 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 24 24
Z0780 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
Z0800 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 83 83
Z0820 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 192 192
Z0840 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 96 96
Z0860 64630-0000 ROADSIDE DEVELOPMENT (ACCESS
ROAD) LPSM All ALL
-J a n -2
:5 P
M
MileStone: 100% Base + Option
Date Completed: 01/05/23
Report Date: 01/05/23
F
.0
O
R R e tr o fi t
B ri d g e F in a l D e s ig n \D o c s \Q u a n ti ti e s a n d C o s t
E s ti m a te
S u m m a ry o f Q u a n ti ti e s .x ls m
]S h e e t
(5
SUMMARY OF QUANTITIES - Option Z
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B.5DOT 18(1)OR
SHEET
QUANTITIES
TABULATION OF SITE
D a n
L a u tz e n h e is e r
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D.1
STATE PROJECT
NUMBER
SHEET
F
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r f c .d g n
OR DOT 18(1)
:5 e c e m b e r
5 5
10 10
15 15
20 20
25 25
30 30
35 35
40 40
45 45
50 50
55 55
60 60
65 65
70 70
75 75
80 80
85 85
90 90
95 95
0 10
0 10
5 10
5 10
110 110 110
115 115 115
0 12
0 12
5 12
5 12
0 13
0 13
5 13
5 13
0 14
0 14
5 14
5 14
0 15
0 15
5 15
5 15
0 16
0 16
5 16
5 16
0 17
0 17
5 17
5 17
0 18
0 18
5 18
5 18
0 19
0 19
5 19
5 19
0 20
5 20
0 21
0 21
5 21
5 21
0 22
5 22
0 23
5 23
0 24
5 24
0 25
5 25
0 26
5 26
0 27
5 27
0 28
5 28
0 29
5 29
0 30
5 30
0 31
0 31
5 31
5 31
0 32
5 32
0 33
5 33
0 34
5 34
0 35
5 35
0 36
5 36
0 37
5 37
0 38
5 38
0 39
5 39
0 40
5 40
0 41
5 41
0 42
5 42
0 43
5 43
0 44
5 44
0 45
5 45
0 46
5 46
0 47
5 47
0 48
5 48
0 49
0 49
495495
495495
500500
500 500
500500
T
T
T
T
T
UP
T
DIDI DI
T
W A R N I N G
B U R I E D
U T I L I T Y
DI DI
BM
C O
A S
T F
O R
K
W I L L
A M
E T
T E R I V
E R
N
CP
19102
CP
19103
19104
CP
CP
19105
19106
CP
050100 100 200 300
Scale in feet
3) See Section G for Temporary Traffic Control.
2) See Section E for Soil Erosion and Sediment Control.
1) See sheet D.7 for control point table.
Note:
See Section I for details
Willamette River
Bridge 05286 Coast Fork
See Section F for details
Revegetated riprap
190+81.46
MP 2.46
RIVER BRIDGE
WILLAMETTE
COAST FORK
BRIDGE 05286
BEGIN WORK
END WORK
195+18.54
MP 2.46
RIVER BRIDGE
WILLAMETTE
COAST FORK
BRIDGE 05286
ramp. See Sheet D.3.
Remove and reset boat
Construction limits
C OR58L
access
Construction access
Construction
55V-066
Edge of water
(Typ.)
Turf Establishment
STATE PROJECT
NUMBER
SHEET
OR DOT 18(1) D.2
:2
J u n e
P la n
S h e e t]
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\O
R
C o a s t
F o r k
\d g n \o r d
C o n tr o l_
P o in t.
d g n
SITE PLAN
WILLAMETTE RIVER
BRIDGE 05286 COAST FORK
100 101 102 103
106107108
110111112113
116 117 118 119
-30 -20 -10 CL OR58 10 20 30
480 480
490 490
500 500
510 510 N existing transition to match
Grade out 10' min.
existing transition to match
Grade out 10' min.
Scale in feet
10 10 20 30
Existing ground cenerline of road.
Grade down 6", 17'6" out from plan sheet.
varies, see
Transition plan sheet.
varies, see
Transition
Finished grade
A
A
SECTION A-A
C OR58L
Construction limits match existing
Transition to match existing
Transition to
.3
.3
.6
55V-066
Edge of water
See Sheet I.26
Cofferdam, typ.
Ordinary High Water
Ordinary High Water
See Section 646
Reset adjacent to the riprap
Remove and reset boat ramp access road to tie into boat launch
Resurface existing access road and extend
Roadway Aggregate, Method 2 STATE PROJECT
NUMBER
OR DOT 18(1) D.3
:4 a n u a r y
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\O
R C o a s t
F o r k \d g n \C o a s t
F o r k G r a d in g .d g n
GRADING LAYOUT
WILLAMETTE RIVER
10501050
10601060
0 1060
10601060
10651065
1065 1065
1070107
10701070
10701070
5 1075
1075 1075
1075 1075
10751075
1080 1080
1080 1080
1080 10
1080 1080
0 1080
1085 1085
1085 1085
10851085
1090 1090 1090
10901090
10901090
1095 1095
10951095 109510951095
10951095
10951095
10951095
11051105
11101110
11501155
N
WIL
LAMETTE
RI
VER
MID
DLE
FORK
CP
19141
CP
19142
19143
CP
19144
CP
CP
19145
19146
CP
Scale in feet
600 4) See Section H for Permanent Traffic Control.
3) See Section G for Temporary Traffic Control.
2) See Section E for Soil Erosion and Sediment Control.
1) See sheet D.7 for control point table.
Note:
4002000100200
See Section J for details
Willamette River (Barnard)
Bridge 07894 for details
Riprap, see Section J see Section F for details
Revegetated riprap, 1075+65.00
MP 33.24
BRIDGE
RIVER (BARNARD)
WILLAMETTE
BRIDGE 07894
BEGIN WORK
END WORK
1081+58.00
MP 33.24
BRIDGE
RIVER (BARNARD)
WILLAMETTE
BRIDGE 07894
Construction limits
See sheet D.6
Access road
C OR58L
Construction access
W estfir-O a k rid g e R o a d
Edge of water
55V-066
(Typ.)
Turf Establishment
STATE PROJECT
NUMBER
OR DOT 18(1)
D.4
SITE PLAN
WILLAMETTE RIVER (BARNARD)
BRIDGE 07894
OPTION Z
:5 a n u a r y
P la n
S h e
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\o r d
B a r n a r d
C o n tr o l.
d g n
-40 -30 -20 -10 CL OR58 10 20 30 40
1,060 1,060
1,070 1,070
1,080 1,080
10701070 1070
N
202 203
204205 existing transition to match
Grade out 10' min.
A
A
SECTION A-A
plan sheet.
varies, see
Transition cenerline of road.
Grade down 6", 17'6" out from plan sheet.
varies, see
Transition
Existing ground Finished grade
Construction limits
.1 match existing
Transition to
Scale in feet
10 10 20 30
55V-066
See Section 646
Access Road
See Sheet F.3 for details
Cuttings, willow pole (typ)
See Sheet J.15
Cofferdam (typ)
Edge of water
C OR58L
STATE PROJECT
NUMBER
D.5
GRADING LAYOUT
WILLAMETTE RIVER (BARNARD)
BRIDGE 07894
OPTION Z
:3 e c e m b e r
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r B a r n a r d G r a d in g .d g
'190.93L =
'160.87T =
'90.00R =
(LT)121°32'53"Δ =
11+97.58PI
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50
1,064 1,064
1,066 1,066
1,068 1,068
1,070 1,070
1,072 1,072
1,074 1,074
1,076 1,076
1,078 1,078
1,080 1,080
1,082 1,082
1,084 1,084
1,086 1,086
1,088 1,088
1,090 1,090
1,092 1,092
1,094 1,094
1,096 1,096
-3.000%
+11 .00
0%
-12.000%
-5.259%
-12.000%
.2
.2
.6
.5
' VC50
5.56K =
'61.63SSD =
' VC50
2.17K =
'37.86SSD =
' VC70
3K =
'40.67HLSD =
' VC70
10K =
'87.53HLSD =
,0
.4
Existing grade
Proposed grade
OR 58
Access Road C Barnard L aggregate Edge of toe of fill Approximate toe of fill Approximate
2. See Section 646 to design and submit for approval.
conceptual purposes only. Contractor
1. Access road design shown for
NOTE:
Fill: 3346 CuY Aggregate: 88 CuY Conceptual Quantities
Clearing limits
CL
2%
1:2 1:2
2%
10'10'
Typical Section Barnard Access Road aggregate Surface course
:3 a n u a ry
A c c e s s R o a d
P la n
S h e
.0
O
R R e tr o fi t B ri d g e F in a l D e s ig n \d w g \D
G N
\o r-d o t1
\B a rn a rd
A c c e s s R o a d V
.d g n
STATE PROJECT
NUMBER
SHEET
OR DOT 18(1) D.6
55V-066
ACCESS ROAD
WILLAMETTE RIVER (BARNARD)
BRIDGE 07894
OPTION Z
S A
L M
O N C
R E
E K
END WORK
2576+16.92
MP 35.98
CREEK BRIDGE
SALMON
BRIDGE 02073C
BEGIN WORK
2573+98.08
MP 35.98
CREEK BRIDGE
SALMON
BRIDGE 02073C
Edge of water
N
Scale in feet
25 50 100 150
3) See Section G for Temporary Traffic Control.
2) See Section E for Soil Erosion and Sediment Control.
1) No survey data collected for this site.
Note:
See Section K for details
Salmon Creek
Bridge 02073C
Construction limits
Construction access
C OR58L
Gr ee nwat er s P ar k
Construction access
55V-066
.1
(Typ.)
Turf Establishment
STATE PROJECT
NUMBER
OR DOT 18(1) D.7
:2 e c e m b e r
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r d S a lm o n C o n tr o l.
d g n
SITE PLAN
SALMON CREEK
BRIDGE 02073C
END WORK
2451+44.61
MP 38.25
CREEK BRIDGE
LOWER SALT
BRIDGE 01519A BEGIN WORK
2449+13.39
MP 38.25
CREEK BRIDGE
LOWER SALT
BRIDGE 01519A
Edge of water
L O
W E
R S
A L T C
R E
E K
N
Scale in feet
25 50 100 150
4) See Section H for Permanent Traffic Control.
3) See Section G for Temporary Traffic Control.
2) See Section E for Soil Erosion and Sediment Control.
1) No survey data collected for this site.
Note:
See Section L for details
(Lower) Salt Creek
Bridge 01519A
C OR58L
Construction limits
Construction limits
55V-066
F S R
D
Construction access
Construction access
(Typ.)
Turf establishment
:4 e c e m b e r
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r d L o w e r S a lt
C o n tr o l.
d g n
SITE PLAN
SALT CREEK
BRIDGE 01519A (LOWER)
STATE PROJECT
NUMBER
OR DOT 18(1) D.8
GPK FILE DATED November 2019
GEO COORDINATES
POINT
NUMBER
NORTH EAST ELEVATION LATITUDE LONGITUDE
ELLIPSOID
HEIGHT
COMBINED
FACTOR
DESCRIPTION
19101 53804.89 70744.06 496.82 N43°58'58.52307" W122°58'19.73874" 419.83 0.99997564 2.5IN AC WFLHD 19101
19102 53602.54 71272.12 498.58 N43°58'56.67959" W122°58'12.43823" 421.58 0.999975429 2.5IN AC WFLHD 19102
19103 53271.00 71764.18 503.11 N43°58'53.55023" W122°58'05.57795" 426.11 0.999974997 2.5IN AC WFLHD 19103
19104 52796.45 72422.66 501.76 N43°58'49.05742" W122°57'56.38526" 424.76 0.999974751 2.5IN AC WFLHD 19104
19105 52544.24 72954.16 500.94 N43°58'46.72231" W122°57'49.01822" 423.92 0.999974631 2.5IN AC WFLHD 19105
19106 52175.08 73405.81 497.66 N43°58'43.20949" W122°57'42.69576" 420.65 0.999974545 2.5IN AC WFLHD 19106
19141 64248.60 188962.00 1081.00 N43°44'45.00391" W122°30'58.58572" 1006.25 0.999897248 2.5IN AC WFLHD 19141
19142 64399.00 189518.71 1088.58 N43°44'46.62102" W122°30'51.05364" 1013.76 0.999896968 2.5IN AC WFLHD 19142
19143 64525.32 190124.83 1092.44 N43°44'48.01196" W122°30'42.84069" 1017.68 0.999896849 2.5IN AC WFLHD 19143
19144 64729.00 190715.43 1093.19 N43°44'50.16283" W122°30'34.86422" 1018.43 0.999896918 2.5IN AC WFLHD 19144
19145 64910.11 191280.55 1094.76 N43°44'52.08471" W122°30'27.22734" 1020.01 0.999896937 2.5IN AC WFLHD 19145
19146 64947.61 191792.42 1094.66 N43°44'52.57601" W122°30'20.26856" 1019.91 0.999896966 2.5IN AC WFLHD 19146
BRIDGE 05286 COAST FORK
BRIDGE 07894 BARNARD
MODIFIED STATE PLANE COORDINATE SYSTEM (GROUND)
PROJECT : OR DOT 18(1)
DATE OF FIELD WORK : 09/10 2019
DATE OF FINAL ADJUSTMENT : October 2019
PROJECT UNITS : INTERNATIONAL FEET
COORDINATE SYSTEM : Modified State Plane Coordinate System (Ground)
EPOCH DATE : 2010
VERTICAL DATUM : NAVD88 based on Geoid 12B
F
.0
O
R R e tr o fi t B ri d g e F in a l D e s ig n \D o c s \E x c e l\
[C o a s t F o rk
C o n tr o l P o in t T a b le
.x ls x ]S h e e t
-M a y -2
:2
D e s ig n e r
D
C h e c k e r
D e s ig n e d b y
C h e c k e d b y
STATE PROJECT
D.8
SHEET
NUMBER
DOT 18(1)OR
SURVEY CONTROL TABLE
D.9 D
L a u tz e n h e is e r
/2
/2
P.
D ru yv es te in
TABULATION OF EROSION CONTROL
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
E.1
STATE PROJECT
NUMBER
SHEET
F
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r d a .d g n
OR DOT 18(1)
D e c e m b e r
5 48
0 49
495495
500 500
0 1
T
T
UP
TT
N
END WORK
195+18.54
MP 2.46
RIVER BRIDGE
WILLAMETTE
COAST FORK
BRIDGE 05286
19104
CP
CP
19105
BEGIN WORK
190+81.46
MP 2.46
RIVER BRIDGE
WILLAMETTE
COAST FORK
BRIDGE 05286
W I L L
A M
E T
T E R I V
E R
C O
A S
T F
O R
K accordance with Section 625.
3) Apply turf establishment to all disturbed slopes in water into vegetated bank adjacent to the river.
2) Perform dewatering in accordance with Section 208, pump point off of asphalt paves surfaces. See detail sheet E.8.
1) Construct Stabilized Construction Exits at each access
Note:
Fiber roll
Soil erosion control, Fiber roll
Soil erosion control, Scale in feet
50 50 100 150
See I sheets
Cofferdam, typ.
See Sheet F.2 willow pole, typ.
Cuttings, See Sheet E.8 construction exit
Stabilized
See Sheet E.8 construction exit
Stabilized
Construction limits
C OR58L
55V-066
Ordinary High Water
Ordinary High Water
A B
C D
E
F
G
H
I J
K
L
M
N
O
PQ
R
S
T
U
STATE PROJECT
NUMBER
OR DOT 18(1) E.2
:4
M a y
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\O
R C o a s t
F o r k \d g n \o r d b .d g n
SEDIMENT CONTROL PLAN
EROSION AND
WILLAMETTE RIVER
1070107
1070 1070
10701070
1075 1075
1075 1075
10751075
1080 1080
108010
1080 1080
1090 1090
10951095
109510951095
10951095
10951095
110011051105 11101115112011251130113511401145
.9
PC
BEGIN WORK
1075+65.00
MP 33.24
BRIDGE
RIVER (BARNARD)
WILLAMETTE
BRIDGE 07894
END WORK
1081+58.00
MP 33.24
BRIDGE
RIVER (BARNARD)
WILLAMETTE
BRIDGE 07894
CP
19143
CP
19144
W I L L
A M
E T
T E R I V
E R
I D
D L E F
O R
K
Cofferdam, typ.
Fiber roll
Soil erosion control, Fiber roll
Soil erosion control, Scale in feet
50 50 100 150
See Sheet F.3 willow pole, typ.
Cuttings, both sides of the river.
5) Do not have cofferdams in place simultaneously on existing channel with a low clearance structure.
Construct bridge that spans the whetted perimeter of the through the side channel during constriction activities.
4) Construct temporary channel crossing to maintain water flow accordance with Section 625.
3) Apply turf establishment to all disturbed slopes in water into vegetated bank adjacent to the river.
2) Perform dewatering in accordance with Section 208, pump point off of asphalt paves surfaces. See detail sheet E.8.
1) Construct Stabilized Construction Exits at each access
Note:
See Sheet E.8 construction exit
Stabilized See Sheet E.8 construction exit
Stabilized
Construction limits
C OR58L
C OR58L
See Note 4
Temporary channel crossing
55V-066
Ordinary High Water
Ordinary High Water
Silt fence
Soil erosion control, A
B C
D
E
F
G
H I
J
K
L
M N
O P
STATE PROJECT
NUMBER
OR DOT 18(1) E.3
:4 a n u a r y
P la n
S h e
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\o r d c .d g n
CONTROL PLAN
EROSION AND SEDIMENT
WILLAMETTE RIVER (BARNARD)
BRIDGE 07894
Sheet E.6
See detail on silt fence
Soil erosion control, S A
L M
O N C
R E
E K
END WORK
2576+16.92
MP 35.98
CREEK BRIDGE
SALMON
BRIDGE 02073C BEGIN WORK
2573+98.08
MP 35.98
CREEK BRIDGE
SALMON
BRIDGE 02073C
Edge of travelled way
Edge of water
N
Scale in feet
25 50 100 150 slopes in accordance with Section 625.
2) Apply turf establishment to all disturbed
1) No survey data collected for this site.
Note:
storage, typ.
Staging/materiel fiber roll.
Soil erosion control, See Sheet E.8 construction exit
Stabilized
See Sheet E.8 construction exit
Stabilized
Construction limits
C OR58L
Gr ee nwat er s P ar k
55V-066
A
B C
DE
F G
H
I
J
K
L
M
N
O P
Q
STATE PROJECT
NUMBER
OR DOT 18(1) E.4
M a y
P la n
S h e
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\o r d d
.d g n
SEDIMENT CONTROL PLAN
SALMON CREEK EROSION AND
BRIDGE 02073C
END WORK
2451+44.61
MP 38.25
CREEK BRIDGE
LOWER SALT
BRIDGE 01519A BEGIN WORK
2449+13.39
MP 38.25
CREEK BRIDGE
LOWER SALT
BRIDGE 01519A
Edge of travelled way
Edge of water
L O
W E
R S
A L T C
R E
E K
N
Scale in feet
25 50 100 150 slopes in accordance with Section 625.
2) Apply turf establishment to all disturbed
1) No survey data collected for this site.
Note:
storage (typ.)
Staging/materiel fiber roll.
Soil erosion control, See Sheet E.8 construction exit
Stabilized
See Sheet E.8 construction exit
Stabilized
Construction limits
C OR58L
See Sheet E.6 silt fence
Soil erosion control, 55V-066
A B
C D
E
F G
H
I
J K
L
M N
O P
:0
M a y
P la n
S h e
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\o r d e .d g n
SEDIMENT CONTROL PLAN
SALT CREEK EROSION AND
BRIDGE 01519A (LOWER)
STATE PROJECT
NUMBER
OR DOT 18(1) E.5
NO SCALE
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
U S
C c m y fi le s p w p r o d u c ti o n d m s
W .d g n
O c to b e r
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
S
C c m y fi le s p w p r o d u c ti o n d m s
W .d g n
J u ly
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
CONSTRUCTION EXIT
STABILIZED
W157-19
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
S
C c m y fi le s p w p r o d u c ti o n d m s
W .d g n
J u ly
STABILIZED CONSTRUCTION EXIT
NOTE:
4.
3.
2.
1.
Existing paved roadway
Adjust length to fit field conditions as approved.
built up sediment.
Minimize tracking onto paved roadway by removing crosses existing drainage ditches.
Provide temporary drainage culvert where entrance
Construct drainage ditches along entrance as directed.
Use this entrance for construction vehicles only.
movement of typical truck using exit
Construct radius to allow turning geotextile, class 2, type E
Separation-stabilization
Filter rock in gr es s / e gr es s ar ea
Pr ov id e fu ll w id th o f ty p.
50' (typ.)
6" (min.)
TABULATION OF REVEGETATION
D a n
L a u tz e n h e is e r
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
F.1
STATE PROJECT
NUMBER
SHEET
F
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\o r f a .d g n
OR DOT 18(1)
D e c e m b e r
0 4
48548
5 48
0 500
T
N
19104
CP
CP
19105
W I L L
A M
E T
T E R I V
E R
C O
A S
T F
O R
K
Method A, Class 3
Placed riprap, willow pole (typ.)
Cuttings, Scale in feet
10 20 40 60
Riprap
Plant cuttings, willow pole in riprap
C OR58L
Bridge 05286
55V-066
Water (TYP)
Ordinary High of the bridge.
1) Do not plant trees or willow poles within 20 feet
Note:
(Typ.)
Turf establishment
Turf Establishment
STATE PROJECT
NUMBER
OR DOT 18(1) F.2
J u n e
P la n
S h e
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\D e w a te r in g \C o a s t
F o r k
R e V e g
P la n .d g n
REVEGETATION PLAN
WILLAMETTE RIVER
5101520253035404550556065707580859095100105110115120125130135140145150155160165170175180185190195200205210215220225230235240245250255260265270275280285290295300305310315320325330335340345350355360365370375380385390395400405410415420425430435440445450455460465470475480485490495500505510515520525530535540545550555560565570575580585590595600605610615620625630635640645650655660665670675680685690695700705710715720725730735740745750755760765770775780785790795800805810815820825830835840845850855860865870875880885890895900905910915920925930935940945950955960965970975980985990995 1005101010151020
10651065
1070 1070
10701070
10701070
10901090
N species (10 trees).
burlaped, match existing
Planting trees, balled and estimated area.
Removal, individual tree, (20 trees).
Match existing species balled and burlaped, typ.
Planting, trees, of the bridge.
2) Do not plant trees or willow poles within 20 feet placed on vegetated bank.
1) 8 large downed wood sections to be conserved and
Note:
species (10 trees).
burlaped, match existing
Planting trees, balled and estimated area.
Removal, individual tree, willow pole (typ.)
Cuttings, OHW
Scale in feet
25 50 100 150
Riprap
Plant cuttings, willow pole in riprap
Estimated area of tree removal
Planting, tree; balled and burlaped
C OR58L
Bridge 07894
55V-066
(Typ.)
Turf establishment
Turf Establishment
Access Road
STATE PROJECT
NUMBER
F.3
REVEGETATION PLAN
WILLAMETTE RIVER (BARNARD)
BRIDGE 07894
OPTION Z
:3 a n u a r y
R e V e g P la
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\B a r n a r d
R e V e g
P la n .d g
Central leader.
Existing soil.
loosened soil.
Slope sides of flush with finished grade.
Top of root ball shall be settle the soil.
around the root ball to been backfilled, pour water
When the planting hole has tree. Do not over compact.
ball in 6" lifts to brace tamp soil around the root
Prior to mulching, lightly to the area and depth shown.
the soil to reduce compaction
Loosened soil. Dig and turn on top of rootball.
more than 1" of mulch
4" layer of mulch. No
Finished grade of root ball 3x widest dimension
TREE W/ BERM (EXISTING SOIL NOT MODIFIED)
existing or recompacted soil.
Bottom of root ball rests on periphery.
Begin berm at root ball above root ball surface.
ball 4" high x 8" wide soil berm around root
Construct round-topped required
Root ball modified as edition for root ball size.
meet ANSI Z60 current
Trunk caliper shall
Filter fabric aggregate
Filter layer graded
'6" thickness salvaged material, Top dress with
OHW
Class 3
Placed riprap, method A, Finished grade
6" thickness material, min.
Native bank
3) Place poles 2' apart.
2) Base of poles to penetrate 12" below filter fabric.
is not representative of the time of installation.
1) Rooted/leafed condition of the living plant material
Note:
filter fabric.
Extend min. 12" below
Cuttings, willow pole.
LIVE WILLOW POLES
55V-066
:5
M a y
T r e e D e ta il s
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\B a r n a r d R e V e g P la n .d g n
MISCELLANEOUS DETAILS
STATE PROJECT
NUMBER
OR DOT 18(1) F.4
TRAFFIC CONTROL QUANTITIES
TABULATION OF TEMPORARY
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D a n
L a u tz e n h e is e r
G.1
STATE PROJECT
NUMBER
SHEET
F
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r n a .d g n
OR DOT 18(1)
D e c e m b e r
OREGON HW
Y 58
100'
50'-100'
F la g g e r
50'-100'
100'
A
A
SECTION A-A
F la g g e r
BE
PREPARED
TO STOP
W -4
BE
PREPARED
TO STOP
W -4
C W -2
C W -2
ROAD WORK
END
48X24
CG20-2A
ROAD WORK
END
48X24
CG20-2A
Buffer Zone message sign (PCMS)
Portable changeable message sign (PCMS)
Portable changeable
3) See detail sheet G.13 for additional lane closure details.
2) Reference Section 156 for lane closure requirements.
1) Provide lighting system for nighttime operations per Section 156.08.
Note:
the other side of the structure.
closure. Flip configuration for lane closure on
Temporary traffic control shown for single lane
Note:
±1'-0" 2'-0"
Work Zone 15'-0"
Traffic Lane 12'-0" min.
marker
Temporary traffic
CL Bridge
55V-066
500'
250'
500'
500'
250'
250'
250'
Activity Area
500'
500'
500'
STATE PROJECT
NUMBER
OR DOT 18(1) G.2
:5
M a y
P la n
S h e
.0
O
R
R e tr o f it
B r id g e F in a l
D e s ig n \d w g
\D G
N \o r d o t1
\O
R
C o a s t
F o r k
\d g n \o r n b
.d g n
CONTROL PLAN
TEMPORARY TRAFFIC
WILLAMETTE RIVER
O
REG
O N H
W Y
0'
'-1
'-1
0'
500'
0'
F la g g e r
F la g g e r
ROAD WORK
END
48X24
CG20-2A
ROAD WORK
END
48X24
CG20-2A
C W -2
C W -2
BE
PREPARED
TO STOP
W -4
BE
PREPARED
TO STOP
W -4
A
A
Buffer Zone message sign (PCMS)
Portable changeable message sign (PCMS)
Portable changeable
3) See detail sheet G.13 for additional lane closure details.
2) Reference Section 156 for lane closure requirements.
1) Provide lighting system for nighttime operations per Section 156.08.
Note:
closure on the other side of the structure.
lane closure. Flip configuration for lane
Temporary traffic control shown for single
Note:
SECTION A-A
±2'-0" 2'-0"
Work Zone 16'-1"
Traffic Lane 12'-0" min.
marker
Temporary traffic
CL Bridge
55V-066
0'
0'
0'
0'
0'
0'
0'
Ac tiv ity A re a
STATE PROJECT
NUMBER
OR DOT 18(1) G.3
J u n e
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r n c .d g n
CONTROL PLAN
TEMPORARY TRAFFIC
WILLAMETTE RIVER (BARNARD)
BRIDGE 07894
Arrow
Sequential
8' B(III)R
Arrow
Sequential
8' B(III)R
3) See detail sheet G.14 for additional lane closure details.
2) Reference Section 156 for lane closure requirements.
1) Provide lighting system for nightime operations per Section 156.08.
Note:
A
A the structure.
Flip configuration for lane closure on the other side of
Temporary traffic control shown for half bridge closure.
Note:
350'
350'
350'
350'
245'
350'
175'
245'
350'
350'
350'
245'
B u ffe r
B u ffe r
Ta p e r
Ta p e r
Taper
Taper W -5
CLOSED
AHEAD
RIGHT LANE
W 4-
ROAD WORK
END
48X24
CG20-2A
W -5
CLOSED
AHEAD
LEFT LANE
W 4-
ROAD WORK
END
48X24
CG20-2A
(M ou nt o n
TS
S)
W
1-message sign (PCMS) Portable changeable message sign (PCMS) Portable changeable
SECTION A-A
(M ou nt o n
TS
S)
W
1-
8' B(III)R
55V-066
Traffic Lane 12'-0" min.
Work Zone 37'-4"
Traffic Lane 12'-0" min.
Shoulder 4'-0" marker Temporary traffic
2'-0" 2'-0"
STATE PROJECT
NUMBER
SHEET
OR DOT 18(1) G.4
CONTROL PLAN
TEMPORARY TRAFFIC
SALMON CREEK
BRIDGE 02073C
:1
J u n e
P la n
S h e
.0
O R
R e tr o fi t
B ri d g e
F in a l D e s ig n \d w g
\D G
N \o r-d o t1
\o r-n d
.d g
ROAD WORK
END
48X24
CG20-2A
500'
500'
500'
100'
'-1
250'
50'-100' 250'
100'
500'
500'
500' A ctiv ity A re a
BE
PREPARED
TO STOP
W -4
C W -2
BE
PREPARED
TO STOP
W -4
C W -2
ROAD WORK
END
48X24
CG20-2A
Buffer Zone F la g g e r
F la g g e r
A
A message sign (PCMS)
Portable changeable message sign (PCMS)
Portable changeable
3) See detail sheet G.13 for additional lane closure details.
2) Refer to Section 156 for lane closure requirements.
1) Provide lighting system for nighttime operations per Section 156.08.
Note:
other side of the structure.
closure. Flip configuration for lane closure on the
Temporary traffic control shown for single lane
Note:
SECTION A-A
±2'-0" 2'-0"
Work Zone 16'-0"
Traffic Lane 12'-0" min.
marker
Temporary traffic
CL Bridge
55V-066
:5 p r il
P la n
S h e
.0
O
R R e tr o f it
B r id g e F in a l
D e s ig n \d w g \D
G N
\o r d o t1
\o r n e .d g n
TRAFFIC CONTROL PLAN
SALT CREEK TEMPORARY
BRIDGE 01519A (LOWER)
STATE PROJECT
NUMBER
OR DOT 18(1) G.5
Freeway
Use aggregate wedge when abrupt edge is 2 inches or greater.
four feet wide protect longitudinal abrupt edge as shown.
When paved shoulders adjacent to excavations are less than
NOTES:
shoulder, as far as practical.
Place cart / generator / power supply off of the on 10' spacing.
Use six tubular markers in shoulder taper outside shoulder, where practical.
Install Flagger Station Lighting beyond the
2" or GreaterExtg. pavement aggregate base rock
Shoulder or message sign (PCMS)
Portable changeable
20'
100'
4' B(III)R
Temp. Plastic Drums
Lighting
Flagger Station
50'
10'
Markers
28" Tubular
Place roll-up signs in advance of barricades.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.
Continue signing and other traffic control devices
"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.
8' B(III)R barricades with 8' B(III)L barricades and replace the
If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.
or other roadway work. Use abrupt edge signing for longitudinal
Abrupt edges may be created by paving, operations, excavations
GENERAL NOTES FOR ALL TCP DRAWINGS:
for max. spacing.
See TCD Spacing Table
Temp. Plastic Drums for max. spacing.
See TCD Spacing Table
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION
PORTABLE CHANGEABLE MESSAGE
LIGHTING DELINEATION
FLAGGER STATION
Sl. 1:3
TAPER TYPES & FORMULAS
TEMPORARY BARRIER FLARE RATE TABLE
TAPER FORMULA
Merging (Lane Closure)
Shifting
Shoulder Closure
Flagging (See Drg. TM850)
Downstream (Termination)
"L"
"L"3 1"L"/3 or
50' - 100'
Varies (See Drawings)
"L"2 1"L"/2 or the Speed from the Tables below:
Use Pre-Construction Posted Speed to select
For Lane closures where W < 10', use "L" value for W = 10'.
Limit spacing adjustments to 30% of the "A" dimension for all speeds.
When necessary, sign spacing may be adjusted to fit site conditions.
Place traffic control devices on 10 ft. spacing for intersection and access radii.
NOTES:
SPEED (mph) MINIMUM FLARE RATE
M I N I M U M L E N G T H S T A B L E
"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted
20:1
19:1
18:1
16:1
14:1
12:1
10:1
9:1
8:1
FREEWAYS
SPEED (mph) W = 12 W = 14 W = 16
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
20 - 30
35 - 40
45 - 55
60 - 70 700
100 100
15001000 2640
100 20
Device Spacing (ft)
Max. Channelizing Sign Spacing (ft) SPEED (mph)
A B C
CW21-8A
(As noted)
36x18
C W
(Mount on TSS)
(As needed)
42x18
CW21-8C
OR
C
W
Plaques
CW21-9
Abrupt edge
8' B(III)R 8' B(III)R
mi.4 1 mi.4
1 mi.4
EDGE
ABRUPT
RIGHT
LEFT
(Roll-up sign)
(As needed)
EDGE
ABRUPT 32x11
32x11
32x11
CENTER
RIGHT
LEFT
≤ 10W
W/60, S = Speed, W=WidthS 45: L = WS, Speeds < 45: L = ≥ formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using
Combine drawing details to complete temporary traffic control for each work activity.
Do not locate sign supports in locations designated for bicycle or pedestrian traffic.
High speed highways have a pre-construction posted speed of 45 mph or higher.
Low speed highways have a pre-construction posted speed of 40 mph or less.
All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.
All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".
background of all temporary warning signs.
Use flourescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.
to indicate traffic movements.
Arrows shown in roadway are directional arrows sequential arrow boards.
Place a barricade approx. 20' ahead of all shown are the minimum required.
Signs and other Traffic Control Devices (TCD)
TYPICAL ABRUPT EDGE DELINEATION
Smart Work Zone Systems Portable Traffic Signals
Detail as shown is used for trailered and non-crashworthy components of:
barricade may be omitted when PCMS is placed behind a roadside barrier.
Use six drums in shoulder taper on 20' spacing. The drums and
Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.
Install PCMS beyond the outside shoulder, when possible.
TM800
PCMS DETAILS
TABLES, ABRUPT EDGE AND
55V-066
:1
J u n e
U n ti tl e d S h e t
.0
O
R R e tr o fi t B ri d g e F in a l D e s ig n \d w g \D
G N
\o r-d o t1
\S ta n d a rd
D e ta il s \O
D O
T D e ta il s \T e m p T ra ff ic
C o n tr o l\ T
M T a b le s a n d P
C M
S .d g n
DETAIL
STATE PROJECT
NUMBER
SHEET
OR DOT 18(1) G.6
LC
CL
CL
CL
sheeting on rail encapsulated lens
White and orange
Extg. ground
" 6 m in m in m in m in
V a r
4' min. - 8' max.
m in
V a r m in
"6 m in
24" min. - 48" max.
sheeting on rail encapsulated lens
White and orange
Extg. groundExtg. ground sheeting on rail encapsulated lens
White and orange
M in
V a r
"6
24" min.
direction toward which traffic must turn in detouring.
it is desirable that the stripes slope downward in the
Where a barricade extends entirely across a roadway, at an angle of 45° in the direction traffic is to pass.
Markings for barricade rails shall slope downward directions from the center of the barricade.
slope the chevron striping downward in both
Where both right and left turns are provided for, local road users.
across roadway unless access is required for may be used. Extend barricades completely
For full roadway closures, the C or LR barricade
NOTES:
Traffic Traffic
(For approaching traffic)(For approaching traffic)
(For approaching traffic)
Traffic
(For approaching traffic)
Traffic
BARRICADE RAIL LAYOUT
DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING
BARRICADE NOTATION
B(III)R
LT. SIDE - L
CLOSED…