This document contains a fracture critical detail inspection report for the Willamette River Bridge and a related federal contract opportunity notice. The inspection report provides condition assessments for structural elements of the bridge such as girders, floorbeams, stringers and bearings. Deficiencies including pack rust, section loss and distortions are documented. The related federal contract opportunity is seeking bids for a highway bridge project along OR DOT 18(1) and OR58 between the Coast Fork Willamette River and Lower Salt Creek. The estimated price range for the project is between $15-20 million. It involves Schedule A work over 35.88 miles as well as a 0.11 mile optional segment. Bids for the firm fixed price contract will be sealed and the solicitation is open to full and unrestricted competition.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Owner: ODOT Bridge No. 07894 District: 05 County: Year Built: 1955 Highway: 18
Frequency: 10 years MP: 33.24 4/18/2018
OREGON DEPARTMENT OF TRANSPORTATION
FRACTURE CRITICAL DETAIL INSPECTION REPORT
(Executive Summery) Bridge Name: Willamette River (Barnards) Br.
Lane FP Structure Type: 3 span Fracture Critical Riveted Girders FP Member Type: Stringer to Floor Beam: Riveted Date of Inspection:
Agency Inspected By: Region 4 Bridge Inspection Team Name and No: John Adkins (183) Fracture Critical Detail Inspection Procedures: The appropriate fracture critical detail inspection procedures, as contained in the ODOT Bridge Inspection Manual, Section 11 are categorized by the type of steel superstructure and member type.
STEEL PLATE GIRDER SPANS
B 2 B 3 B 4 B 5 B 6 B 7 B 8
TENSION ZONES
RCDG SPANS RCDG SPANS
B1
OAKRIDGE
PACK RUST SECTION LOSS DISTORTION OR CONSTRUCTION DEFECT
B3 / PP0 B4 / PP5SPAN 3
SPAN 4B4 / PP5 B5 / PP13
B6 / PP 18
SPAN 5B5 / PP13
SPAN TRUSS LENGTH TYPE OF
MEMBER PAINT PACK RUST FATIGUE SECTION LOSS DISTORTION REPAIR
Bent 3 Left FC Girde PP0
3 Left FC Girde PP0-PP1
3 Left FC Girde PP1-PP2 at PP2 CS2 rust inbetween vertical double stiff 1/2" Ding in lower flange
3 Left FC Girde PP2-PP3 at PP2, PR and SL Between Floorbeam gusset and lower chord
3 Left FC Girde PP3-PP4 at PP3 CS1 pack rust
3 Left FC Girde PP4-PP5
Bent 4 Left FC Girde PP5 CS3 paint on vert stiffener Crevasse rust between double vert stiff At PP5 1/16" S.L. in lower web
4 Left FC Girde PP5-PP6
4 Left FC Girde PP6-PP7 Ding in lower flange
4 Left FC Girde PP7-PP8 Ding in lower flange
4 Left FC Girde PP8-PP9 minor PR in lower flange splice plate
4 Left FC GirdePP9-PP10
4 Left FC GirdePP10-PP1
4 Left FC GirdePP11-PP12 Bad torch cut on upper web
4 Left FC GirdePP12-PP13
Bent 5 Left FC Girde PP13 Pack rust at bottom of double vertical stiffener
5 Left FC GirdePP13-PP14
5 Left FC GirdePP14-PP15
5 Left FC GirdePP15-PP16
MEMBER
MEMBER LOCATION MEMBER DESCRIPTION MEMBER CONDITION
5 Left FC GirdePP16-PP17 Pack rust at bottom of double vertical stiffener
5 Left FC GirdePP17-PP18 Pack rust at bottom of double vertical stiffener shotgun damage
Bent 6 Left FC Girde PP18 Pack rust at bottom of double vertical stiffener
SPAN TRUSS LENGTH TYPE OF
MEMBER PAINT PACK RUST FATIGUE SECTION LOSS DISTORTION REPAIR
Bent 3 Right FC Girde PP0
3 Right FC Girde PP0-PP1
3 Right FC Girde PP1-PP2 minor ding on bot flange
3 Right FC Girde PP2-PP3
3 Right FC Girde PP3-PP4
3 Right FC Girde PP4-PP5
Bent 4 Right FC Girde PP5 Crevasse rust between double vert stiff
4 Right FC Girde PP5-PP6
4 Right FC Girde PP6-PP7
4 Right FC Girde PP7-PP8
4 Right FC Girde PP8-PP9
4 Right FC GirdePP9-PP10
4 Right FC GirdePP10-PP1
4 Right FC GirdePP11-PP12
4 Right FC GirdePP12-PP13 minor PR on lower flange splice plate
Bent 5 Right FC Girde PP13
5 Right FC GirdePP13-PP14 minor PR on lower flange splice plate
5 Right FC GirdePP14-PP15 minor PR on lower flange splice plate
5 Right FC GirdePP15-PP16 at PP16 minor PR on lower flange splice plaMinor SL
5 Right FC GirdePP16-PP17 minor ding on bot flange
5 Right FC GirdePP17-PP18
Bent 6 Right FC Girde PP18
SPAN TRUSS LENGTH TYPE OF
MEMBER PAINT PACK RUST FATIGUE SECTION LOSS DISTORTION REPAIR
Bent 3 Floorbeam PP0 CS3 on lower angles and gussets Minor S.L. on lower gussets
3 Floorbeam PP1
3 Floorbeam PP2
3 Floorbeam PP3
3 Floorbeam PP4
Bent 4 Floorbeam PP5 CS3 on lower angles and gussets Minor S.L. on lower gussets
4 Floorbeam PP6
4 Floorbeam PP7
4 Floorbeam PP8
4 Floorbeam PP9
4 Floorbeam PP10
4 Floorbeam PP11
4 Floorbeam PP12
Bent 5 Floorbeam PP13 CS3 on lower angles and gussets Minor S.L. on lower gussets
5 Floorbeam PP14
5 Floorbeam PP15
5 Floorbeam PP16
5 Floorbeam PP17
Bent 6 Floorbeam PP18 CS3 on lower angles and gussets Minor S.L. on lower gussets
SPAN TRUSS LENGTH TYPE OF
MEMBER PAINT PACK RUST FATIGUE SECTION LOSS DISTORTION REPAIR
Bent 3 Stringer 1 PP0 CS3 at girder ends at PP0
2 PP0 CS3 at girder ends at PP0
3 PP0 CS3 at girder ends at PP0
4 PP0 CS3 at girder ends at PP0
5 PP0 CS3 at girder ends at PP0
3 Stringer 1 PP1
2 PP1
3 PP1
4 PP1
5 PP1
3 Stringer 1 PP2
2 PP2
3 PP2
4 PP2
5 PP2
3 Stringer 1 PP3
2 PP3
3 PP3
4 PP3
5 PP3
3 Stringer 1 PP4
2 PP4
3 PP4
4 PP4
5 PP4
Bent 4 Stringer 1 PP5 CS3 at girder ends at PP5
2 PP5 CS3 at girder ends at PP5
3 PP5 CS3 at girder ends at PP5
4 PP5 CS3 at girder ends at PP5
5 PP5 CS3 at girder ends at PP5
4 Stringer 1 PP6
2 PP6
3 PP6
4 PP6
5 PP6
4 Stringer 1 PP7
2 PP7
3 PP7
4 PP7
5 PP7
4 Stringer 1 PP8
2 PP8
3 PP8
4 PP8
5 PP8
4 Stringer 1 PP9
2 PP9
3 PP9
4 PP9
5 PP9
4 Stringer 1 PP10
2 PP10
3 PP10
4 PP10
5 PP10
4 Stringer 1 PP11
2 PP11
3 PP11
4 PP11
5 PP11
4 Stringer 1 PP12
2 PP12
3 PP12
4 PP12
5 PP12
Bent 5 Stringer 1 PP13
2 PP13
3 PP13
4 PP13
5 PP13
5 Stringer 1 PP14
2 PP14
3 PP14
4 PP14
5 PP14
5 Stringer 1 PP15
2 PP15
3 PP15
4 PP15
5 PP15
5 Stringer 1 PP16
2 PP16
3 PP16
4 PP16
5 PP16
5 Stringer 1 PP17
2 PP17
3 PP17
4 PP17
5 PP17
5 Stringer 1 PP18
2 PP18
3 PP18
4 PP18
5 PP18
SPAN TRUSS LENGTH TYPE OF
MEMBER PAINT PACK RUST FATIGUE SECTION LOSS DISTORTION REPAIR
Bent 3 Bearing Left 1 Moveable CS2. Earthquake rehab has created a birdbath. Water collects around bearings. Debris accumulation
Bent 3 Bearing Right 2 Moveable CS1. Earthquake rehab has created a birdbath. Water collects around bearings
Bent 4 Bearing Left 1 Fixed CS2. Earthquake rehab has created a birdbath. Water collects around bearings. Debris accumulation
Bent 4 Bearing Right 2 Fixed CS1. Earthquake rehab has created a birdbath. Water collects around bearings
Bent 5 Bearing Left 1 Moveable CS1. Earthquake rehab has created a birdbath. Water collects around bearings
Bent 5 Bearing Right 2 Moveable CS1. Earthquake rehab has created a birdbath. Water collects around bearings
Bent 6 Bearing Left 1 Moveable CS1. Earthquake rehab has created a birdbath. Water collects around bearings
Bent 6 Bearing Right 2 Moveable CS1. Earthquake rehab has created a birdbath. Water collects around bearings
INSPECTION NOTES:
Vertical Stiffeners added to girders in 2007 (look for bolted stiffeners)
All plate girders / stingers / floorbeams that are in contact w/ the concrete deck have minor CS3 rust on the upper flange that is imbedded in the concrete Most lower splice plates on FC Girders have crevace rust/ pack rust Floorbeams at Bents 4,5 & 6 have cs3 deterioration on most members Some rough flame cuts where rivets were torched out and replaced w/ bolts in upper web.
Can take the lane from 8am- Aspen can inspect both girders from 1 lane well.
East bound/ Upstream traffic lane taken from 8:30 am-11:30am 4/18/18.
If needed, can inspect spans 4-7 with a bucket truck.
Need 2 flaggers