As-Built Plans 07894.pdf

PDF 5 MB Posted

Attached to
OR DOT 18(1), OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Solicitation number
69056723B000010
Issued by

About this file

This document contains details for a federal contract solicitation for construction services. The solicitation is for a firm fixed price construction project located five miles southeast of Springfield, Oregon along OR DOT 18(1), OR58. The project involves replacing bridges over the Coast Fork Willamette River and Lower Salt Creek. The estimated value of the contract is between $15 million and $20 million. The base schedule involves 35.88 miles of work along with an optional 0.11 mile section. Sealed bids are due by the date specified in the solicitation. The selected contractor will be required to complete all construction work according to the plans provided by the Federal Highway Administration Western Federal Lands Highway Division.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR DOT 18(1)

OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

As-Builts for Willamette River (Barnard) Bridge

Comments_As-Built Plans 07894.pdf
02126
02126A
02126B
58367
58368
58369
58370
58371
58372
58373
58374
58375
58376
58377
69473
69474
69475
69476
69477
69478
69479
69480
69481
69482
69483
75341
75342
88023
88024
B-838
BR120
BR145
BR206

File details come from the government source that posted it. Updated .