This document contains a federal contract opportunity for bridge inspection and maintenance services on a 35.88 mile stretch of highway in Lane County, Oregon. The firm fixed price contract is valued between $15-20 million and will be awarded through a sealed bid process. The Department of Transportation Federal Highway Administration is seeking inspection of multiple bridges along OR DOT 18(1) and OR58, including the Coast Fork Willamette River Bridge, with services to include fatigue inspection, element condition assessments, traffic control planning, and recommended maintenance activities. Submissions are due through the System for Award Management no later than the date specified in the solicitation.

View the file

Other files

File Type Posted
Bid Tab_OR DOT 18(1).pdf PDF
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FP05286(2019).xlsx COVER 1

OWNER: ODOT BRIDGE NO. 05286

DISTRICT: 5 COUNTY: YEAR BUILT: 1950 HIGHWAY: 18

FREQUENCY: 2 years MILEPOINT: 2.46

INSPECTOR (#):

INSPECTOR (#):

QUANTITY UNITS CS 1 CS 2 CS 3 CS 4

900 LF 894 4 2 0

1010 - Cracking 0 LF 0 43608 0 0

1020 - Connection 6 LF 0 4 2 0

340 LF 338 0 2 0

1010 - Cracking 0 LF 0 0 0 0

1020 - Connection 2 LF 0 0 2 0

ELEMENT

113 - Steel Stringer - FATIGUE

152 - Steel Floor Beam - FATIGUE

DRAWING KEY ELEMENT RATING SUMMARY

AGENCY INSPECTED BY: Region 3 - Inspection Team DATE OF INSPECTION: 5/23/2019

Josh Lonie (S0037)

Austin Grimes (ODOT) Fatigue Prone Detail Inspection Procedures: The appropriate fatigue prone detail inspection procedures, as contained in the ODOT Bridge Inspection Manual, Section 11 are categorized by the type of steel superstructure and member type.

NOTE : Bridge members are labeled with increasing mile points and counted from left to right when facing with increasing mile points.

OREGON DEPARTMENT OF TRANSPORTATION

FATIGUE PRONE DETAIL INSPECTION REPORT

(Executive Summary) BRIDGE NAME: Coast Fork Willamette River

Lane STRUCTURE TYPE: Riveted Through Truss

MILE POINTS

FC Members

Non-FC Members

L0 Truss Panel Point

FIX.

EXP.

Fixed Bearings

Expansion Bearings

OAKRIDGEEUGENE

BENT 4 BENT 5

L0 L1 L2 L3 L4 L5 L6 L7 L8

U1 U2

U3 U4 U5 U6 U7

L9

U8

SPAN 4

FP05286(2019).xlsx FPD LOCATIONS 2

CONNECTION DESCRIPTION

SPANS PANEL MEMBER LENGTH TYPE OF CONNECTION CATERGORY STRINGERS

4 L0 - L9 W36X182 W36X230 34.0' Riveted Stringer-Floor Beam

Connection D 1-5

Typical connections are riveted stringer-floor beam connectionns with clip angles and riveted support angle brackets.

MEMBER & LOCATIONS

FATIGUE PRONE DETAIL DESCRIPTION

FATIGUE PRONE DETAIL

FLOOR SYSTEM LOCATIONS

TYPICAL FATIGUE PRONE DETAILS

REPLACED CONNECTORCRACK/CRACK INDICATOR BROKEN OR MISSING CONNECTORARRESTED CRACK

STR-1

STR-2

STR-3

STR-4

STR-5

TRUSS

TRUSS

BE

N

T

BE

N

T

L0 L1 L2 L3 L4 L5 L6 L7 L8 L9

TYPICAL STRINGER FLOORBEAM CONNECTIONS

FP05286(2019).xlsx NOTES 3

DATE ACTION TAKEN PRIORTIY INSTRUCTION/REMARK

5/26/2015 113 - Replace Connector Routine Replace missing/broken rivets at Floor Beam 3 - Stinger 5 & Floor Beam 6 - Stinger 4.

5/26/2015 152 - Replace connector Routine Replace the missing rivets in Floor Beam 9.

INSPECTION NOTES

1. Sharp copes on most of the stringers.

2. There are tack welds in the lateral/sway bracing systems.

ELEMENT REMARKS NOTE: These remarks are intended to be incorporated into the routine inspection report.

113 - Steel Stringer:

1020 - Connections: There is one missing bolt in the bottom clip angle bracket in the connection for Stringer 4 and Floor Beam 3. Stringer 4 has a broken rivet in the connection for Floor Beam 6. There are numerous stringer to floor beam connection where the rivets have been replaced with bolts.

152 - Steel Floor Beam:

MAINTENANCE RECOMMENDATIONS

1020 - Connections: Floor Beam 9 is missing one rivet at each end in the truss to floor beam connection.

FP05286(2019).xlsx SPAN 4 4

SPAN TRUSS QUANITY UNITS CS 1 CS 2 CS 3 CS 4 LEFT - BACK RIGHT - FRONT

113 - Steel Stringer 900 LF 894 4 2 0

1010 - Cracking 0 LF 0 43608 0 0 1020 - Connection 6 LF 0 4 2 0

152 - Steel Floor Beam 340 LF 338 0 2 0 1010 - Cracking 0 LF 0 0 0 0 1020 - Connection 2 LF 0 0 2 0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 19.0 1.0 0.0 0.0

1020 - Connection 1.0 LF 0.0 1.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 19.0 1.0 0.0 0.0

1020 - Connection 1.0 LF 0.0 1.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 19.0 0.0 1.0 0.0

1020 - Connection 1.0 LF 0.0 0.0 1.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 19.0 0.0 1.0 0.0

1020 - Connection 1.0 LF 0.0 0.0 1.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 19.0 1.0 0.0 0.0

1020 - Connection 1.0 LF 0.0 1.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 34.0 0.0 0.0 0.0

113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 19.0 1.0 0.0 0.0

SPAN 4

STRINGER TOTALS

FLOOR BEAM TOTALS

1 OK

152 - Steel Floor Beam

MEMBER LOCATION ELEMENT RATING SUMMARY REMARKS

MEMBER ELEMENT

4 PP 1 STRG 3 OK OK

4 L-R FLBM U88 OK OK

OK

4 PP 1 STRG 2 OK Paint cracks.

4 PP 1 STRG

4 PP 1 STRG 5 OK OK

4 PP 1 STRG 4 OK OK

4 PP 2 STRG 1 OK

4 L-R FLBM U1 OK OK152 - Steel Floor Beam

4 PP 2 STRG 3 OK OK

OK

4 PP 2 STRG 2 Paint indicator in the right clip angle. 3 rivets replaced with bolts.

4 PP 2 STRG 5 OK OK

4 PP 2 STRG 4 OK OK

4 PP 3 STRG 1 OK

4 L-R FLBM U2 OK152 - Steel Floor Beam

4 PP 3 STRG 3 OK OK

4 PP 3 STRG 2 3 rivets replaced with bolts. OK

4 PP 3 STRG 5 OK

4 PP 3 STRG 4 OK

4 PP 4 STRG 1 OK

4 L-R FLBM U3 OK152 - Steel Floor Beam

4 PP 4 STRG 3 Scratch at cope. OK 4 PP 4 STRG 2 OK Top left rivet is loose.

4 PP 4 STRG 5 OK

4 PP 4 STRG 4 OK

4 PP 5 STRG 1 OK

4 L-R FLBM U4 OK152 - Steel Floor Beam

4 PP 5 STRG 3 OK OK

4 PP 5 STRG 2 Paint indicator in the right clip angle. OK

4 PP 5 STRG 5 OK OK

4 PP 5 STRG 4 OK OK

4 PP 6 STRG 1 OK

4 L-R FLBM U5 OK OK152 - Steel Floor Beam

4 PP 6 STRG 3 OK OK

4 PP 6 STRG 2 OK OK

4 PP 6 STRG 5 OK

4 PP 6 STRG 4 OK

4 PP 7 STRG 1 OK

4 L-R FLBM U6 OK152 - Steel Floor Beam

4 PP 7 STRG 3 OK OK

4 PP 7 STRG 2 OK OK

4 PP 7 STRG 5 OK

4 PP 7 STRG 4 OK

4 PP 8 STRG 1 OK

4 L-R FLBM U7 OK152 - Steel Floor Beam

4 PP 8 STRG 3 OK OK

4 PP 8 STRG 2 Paint crack indicator in the right clip angle. 3 rivets replaced with bolts.

152 - Steel Floor Beam

4 PP 8 STRG 4 OK OK

4 PP 8 STRG 5 OK

OK

OK

OK

OK

4 L-R FLBM U8 OK OK

4 PP 9 STRG 1 OK OK

4 PP 9 STRG 2 3 rivets replaced with bolts OK

One missing bolt in the bottom clip angle bracket connection (PHOTO 1).

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

Top rivet in the left clip angle is broken

(PHOTO 2).

OK

OK

BC - BOTTOM CHORD MEMBER

TC - TOP CHORD MEMBER

DIAG - DIAGONAL MEMBER

VERT - VERTICAL MEMBER

HORZ - HORIZONTAL MEMBER

FLBM - FLOOR BEAM

FRACTURE CRITICAL MEMBER

FL

O

O R

BE

AM

BA

CK

FR

O

N

STRINGER

STRINGER

STRINGER

STRINGER

FP05286(2019).xlsx SPAN 4 5

SPAN TRUSS QUANITY UNITS CS 1 CS 2 CS 3 CS 4 LEFT - BACK RIGHT - FRONT

MEMBER LOCATION ELEMENT RATING SUMMARY REMARKS

MEMBER ELEMENT

1020 - Connection 1.0 LF 0.0 1.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0 113 - Steel Stringer 20.0 LF 20.0 0.0 0.0 0.0

34.0 LF 32.0 0.0 2.0 0.0

1020 - Connection 2.0 LF 0.0 2.0

STRG

PP 9 STRG 5 OK

4 PP 9

L-R FLBM L9

One missing rivet at the end of the floor beam.

152 - Steel Floor Beam

4 PP 9 STRG

4 OK

One missing rivet at the end of the floor beam.

4 PP 9 STRG 2 3 rivets replaced with bolts.

4 OK

OK

OK

OK OK

FP05286(2019).xlsx PHOTOS 6

TITLE:

DATE:

LOCATION:

FILE NAME:

TITLE:

DATE:

LOCATION:

FILE NAME:

TITLE:

DATE:

LOCATION:

FILE NAME:

INSPECTION PHOTOS

PHOTO 1

Missing Bolt in Stringer 5 at Floor Beam 2

DESPCRIPTION:

Missing bolt in the stringer bottom support clip angle.

PHOTO 2

Broken Rivet in Stringer 4 at Floor Beam 6

DESPCRIPTION:

PHOTO 3

DESPCRIPTION:

MISSING

BROKEN RIVET

FP05286(2019).xlsx RESOURCES 7

1 2 3 4

GOOD FAIR POOR SEVERE

None Freckled Rust. Corrosion of the steel has initiated.

Section loss is evident or pack rust is present but does not warrant structural review.

None

Crack that has self arrested or has been arrested with effective arrest holes, doubling plates, or similar.

Identified crack exists that is not arrested but does not warrant structural review

Connection is in place and functioning as in-tended.

Loose fasteners or pack rust without distortion is present but the connection is in place and functioning as intended.

Missing bolts, rivets, broken welds, fasteners or pack rust with distortion but does not warrant a structural review.

None Distortion not requiring mitigation or mitigated distortion.

Distortion that requires mitigation that has not been addressed but does not warrant structural review.

Not Applicable

The element has impact damage. The specific damage caused by the impact has been captured in condition state 2 under the appropriate material defect entry.

The element has impact damage. The specific damage caused by the impact has been captured in condition state 3 under the appropriate material defect entry.

The element has impact damage. The specific damage caused by the impact has been captured in condition state 4 under the appropriate material defect entry.

ACCESS QTY TIME

PRIMARY 1 4 hours

NOTE/LOCATION

SECONDARY 1 2 hours

NOTE/LOCATION

SPECIAL - -

NOTE/LOCATION

QTY TIME

2 6 hours

2 6 hours

CONDITION STATE DEFINITIONS

CONDITION STATES

DEFECT FLAGS

Corrosion (1000)

The condition warrants a structural review to determine the effect on strength or serviceability of the element or bridge; OR a structural review has been completed and the defects impact strength or serviceability of the element or bridge.

Cracking (1010)

Connection (1020)

Distortion (1900)

TRAFFIC CONTOL RESOURCES NOTES

Damage (7000)

INSPECTION RESOURCES

EQUIPMENT

Under Bridge Inspection Truck (UBIT)

Deploy off the westbound lane.

Man lift/Bucket Truck

Manlift needed to access all parts of the upper truss

None

TRAFFIC CONTROL PLAN

Single lane closure controlled by flaggers. Standard temporary work zone.

Lane Closure

Flaggers

COVER
FPD LOCATIONS
NOTES
SPAN 4
PHOTOS
RESOURCES

File details come from the government source that posted it. Updated .