This document provides details for a federal solicitation seeking bids for a highway construction project in Oregon. The solicitation is for Project OR DOT 18(1), which involves work on OR58 from the Coast Fork Willamette River to Lower Salt Creek Bridges. The project includes a base schedule and one option, with an estimated price range between $15-20 million. Bids are due by sealed submission and the contract type will be firm fixed price. The work involves 35.88 miles for the base schedule and 0.11 additional miles for the option. The solicitation is offered through full and open competition on an unrestricted basis. Interested vendors can view the list by registering as a SAM user and being assigned the Contract Opportunities Administrator role for their entity. The federal agency issuing this solicitation is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
QA_03-21-2023.pdf PDF
QA_03-20-2023.pdf PDF
Amendment A002.pdf PDF
QA_03-16-2023.pdf PDF
Amendment A001.pdf PDF
QA_03-08-2023.pdf PDF
QA_02-28-2023.pdf PDF
As-Builts USGS Structure at Bridge 05286.pdf PDF
XC 07894.pdf PDF
Physical Data_OR DOT 18(1).zip ZIP file
As-Built Plans 07894.pdf PDF
Scour Plan of Action_7894.pdf PDF
As-Built Plans 01519A.PDF PDF
BIR_01519A.pdf PDF
OR DOT 18(1) Coast Fork Willamette River Hydraulic Report.pdf PDF
or dot 18(1)_plans.pdf PDF
OR DOT 18(1) ESCP.pdf PDF
As-Built Plans 02073C.pdf PDF
FAT_07894.pdf PDF
UWinspection_07894.pdf PDF
IFB_69056723B000010_OR DOT 18(1).pdf PDF
Control Point Table.xlsx XLSX spreadsheet
BIR_02073C.pdf PDF
ODOT Traffic Control Approval.pdf PDF
FAT_05286.pdf PDF
OR DOT 18(1)_Geotechnical_Report.pdf PDF
OR DOT 18(1) Barnard Bridge Hydraulic Report.pdf PDF
OR DOT 18(1)_Bridge Material Investigation.pdf PDF
Dilly Boat Ramp Construction Photo Summary.pdf PDF
BIR_05286.pdf PDF
FCIR_07894.pdf PDF
As-Built Plans 05286.pdf PDF
FCIR_05286.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 03/21/23

1 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Contractor Responsive?

Engineer's Estimate

Conway Construction, Inc.

Farline Bridge

Stellar J Corporation

Base Schedule A

$8,428,937.44

$15,425,506.40

$14,321,912.20

$11,705,291.00

Option: Z

$6,573,348.99

$6,870,426.40

$6,749,184.60

$6,534,540.00

Contractor Responsive?

Engineer's Estimate

Conway Construction, Inc.

Farline Bridge

Stellar J Corporation

Total Base Schedule A and Option(s): Z

$15,002,286.43

$22,295,932.80

$21,071,096.80

$18,239,831.00

2 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Solcitation No: 69056723B000010

Division: Western Federal Lands

State: OR County: Lane

Federal Land: Willamette National Forest Opened at: FHWA Vancouver, WA Office

Opened by: Robert Kolln

Date: 03/21/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Stellar J Corporation $6,534,540.00 1363 Down River Drive Woodland, WA 98674

Farline Bridge $6,749,184.60 1445 Miller DR Stayton, OR 973839431

Conway Construction, Inc. $6,870,426.40 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665

Engineer's Estimate $6,573,348.99

3 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0020 15101-0000 MOBILIZATION

Stellar J Corporation Lump Sum $300,000.00 Farline Bridge Lump Sum $688,000.00 Conway Construction, Inc. Lump Sum $650,000.00 Engineer's Estimate ALL LPSM Lump Sum $704,287.39

Z0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Stellar J Corporation Lump Sum $30,000.00 Farline Bridge Lump Sum $15,000.00 Conway Construction, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

Z0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Stellar J Corporation Lump Sum $15,000.00 Farline Bridge Lump Sum $75,000.00 Conway Construction, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

Z0080 15401-0000 CONTRACTOR TESTING

Stellar J Corporation Lump Sum $50,000.00 Farline Bridge Lump Sum $25,000.00 Conway Construction, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

Z0100 15501-0000 CONSTRUCTION SCHEDULE

Stellar J Corporation Lump Sum $2,500.00 Farline Bridge Lump Sum $15,000.00 Conway Construction, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00

Z0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Stellar J Corporation $15.00 $3,450.00 Farline Bridge $5.00 $1,150.00 Conway Construction, Inc. $8.00 $1,840.00 Engineer's Estimate 230 LNFT $6.00 $1,380.00

4 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Stellar J Corporation $8.00 $6,160.00 Farline Bridge $4.00 $3,080.00 Conway Construction, Inc. $8.00 $6,160.00 Engineer's Estimate 770 LNFT $8.40 $6,468.00

Z0160 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Stellar J Corporation $6,000.00 $12,000.00 Farline Bridge $2,000.00 $4,000.00 Conway Construction, Inc. $6,000.00 $12,000.00 Engineer's Estimate 2 EACH $5,760.00 $11,520.00

Z0180 20120-1000 REMOVAL, INDIVIDUAL TREE

Stellar J Corporation $1,500.00 $45,000.00 Farline Bridge $240.00 $7,200.00 Conway Construction, Inc. $650.00 $19,500.00 Engineer's Estimate 30 EACH $720.00 $21,600.00

Z0200 20305-1000 REMOVAL OF CONCRETE

Stellar J Corporation $1,500.00 $57,000.00 Farline Bridge $425.00 $16,150.00 Conway Construction, Inc. $600.00 $22,800.00 Engineer's Estimate 38 CUYD $420.00 $15,960.00

Z0220 20801-0000 STRUCTURE EXCAVATION

Stellar J Corporation $100.00 $197,200.00 Farline Bridge $68.00 $134,096.00 Conway Construction, Inc. $114.00 $224,808.00 Engineer's Estimate 1,972 CUYD $95.00 $187,340.00

Z0240 20815-0000 COFFERDAMS

Stellar J Corporation Lump Sum $900,000.00 Farline Bridge Lump Sum $980,000.00 Conway Construction, Inc. Lump Sum $70,000.00 Engineer's Estimate ALL LPSM Lump Sum $730,000.00

5 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0260 20820-0000 DEWATERING

Stellar J Corporation Lump Sum $100,000.00 Farline Bridge Lump Sum $70,000.00 Conway Construction, Inc. Lump Sum $90,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00

Z0280 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

Stellar J Corporation $275.00 $445,500.00 Farline Bridge $120.00 $194,400.00 Conway Construction, Inc. $110.00 $178,200.00 Engineer's Estimate 1,620 CUYD $120.00 $194,400.00

Z0300 50201-0000 CONCRETE PAVEMENT RESTORATION, PAVEMENT PATCH

Stellar J Corporation $250.00 $11,250.00 Farline Bridge $275.00 $12,375.00 Conway Construction, Inc. $300.00 $13,500.00 Engineer's Estimate 45 SQYD $720.00 $32,400.00

Z0320 55106-1000 SHEET PILE, IN PLACE (TIE BACK)

Stellar J Corporation Lump Sum $800,000.00 Farline Bridge Lump Sum $1,250,000.00 Conway Construction, Inc. Lump Sum $1,500,000.00 Engineer's Estimate ALL LPSM Lump Sum $810,000.00

Z0340 55106-1000 SHEET PILE, IN PLACE

Stellar J Corporation Lump Sum $200,000.00 Farline Bridge Lump Sum $380,000.00 Conway Construction, Inc. Lump Sum $360,000.00 Engineer's Estimate ALL LPSM Lump Sum $270,000.00

Z0360 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

Stellar J Corporation $800.00 $373,600.00 Farline Bridge $990.00 $462,330.00 Conway Construction, Inc. $1,500.00 $700,500.00 Engineer's Estimate 467 CUYD $1,200.00 $560,400.00

6 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0380 55201-1200 STRUCTURAL CONCRETE, CLASS S (SEAL)

Stellar J Corporation $450.00 $83,700.00 Farline Bridge $505.00 $93,930.00 Conway Construction, Inc. $700.00 $130,200.00 Engineer's Estimate 186 CUYD $300.00 $55,800.00

Z0400 55235-0000 EXPANSION JOINTS (ASPHALTIC PLUG SEAL)

Stellar J Corporation $250.00 $19,500.00 Farline Bridge $173.00 $13,494.00 Conway Construction, Inc. $230.00 $17,940.00 Engineer's Estimate 78 LNFT $216.00 $16,848.00

Z0420 55401-1000 REINFORCING STEEL

Stellar J Corporation $3.50 $245,770.00 Farline Bridge $2.05 $143,951.00 Conway Construction, Inc. $2.00 $140,440.00 Engineer's Estimate 70,220 LB $2.90 $203,638.00

Z0440 55501-0000 STRUCTURAL STEEL (BOLT REPLACEMENT)

Stellar J Corporation Lump Sum $35,000.00 Farline Bridge Lump Sum $38,750.00 Conway Construction, Inc. Lump Sum $12,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,200.00

Z0460 55506-0000 MISCELLANEOUS STEEL (JACKETING)

Stellar J Corporation $115,000.00 $920,000.00 Farline Bridge $90,000.00 $720,000.00 Conway Construction, Inc. $100,000.00 $800,000.00 Engineer's Estimate 8 EACH $112,000.00 $896,000.00

Z0480 56302-2000 PAINTING, STEEL STRUCTURE

Stellar J Corporation $175.00 $315,000.00 Farline Bridge $137.80 $248,040.00 Conway Construction, Inc. $136.00 $244,800.00 Engineer's Estimate 1,800 SQFT $80.00 $144,000.00

7 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0500 56701-0000 MICROPILE

Stellar J Corporation $300.00 $540,000.00 Farline Bridge $242.00 $435,600.00 Conway Construction, Inc. $460.00 $828,000.00 Engineer's Estimate 1,800 LNFT $265.00 $477,000.00

Z0520 56705-0000 MICROPILE LOAD VERIFICATION TEST

Stellar J Corporation $25,000.00 $50,000.00 Farline Bridge $20,000.00 $40,000.00 Conway Construction, Inc. $20,000.00 $40,000.00 Engineer's Estimate 2 EACH $3,600.00 $7,200.00

Z0540 56706-0000 MICROPILE PROOF LOAD TEST

Stellar J Corporation $5,000.00 $20,000.00 Farline Bridge $4,500.00 $18,000.00 Conway Construction, Inc. $5,000.00 $20,000.00 Engineer's Estimate 4 EACH $1,200.00 $4,800.00

Z0560 56901-0000 CONCRETE OVERLAY , CLASS MPCO

Stellar J Corporation $62.00 $131,440.00 Farline Bridge $62.00 $131,440.00 Conway Construction, Inc. $85.00 $180,200.00 Engineer's Estimate 2,120 SQYD $60.00 $127,200.00

Z0580 57705-0200 FIBER REINFORCED POLYMER (FRP), STRENGTHENING SYSTEM (CFRP)

Stellar J Corporation $100.00 $216,000.00 Farline Bridge $82.00 $177,120.00 Conway Construction, Inc. $75.00 $162,000.00 Engineer's Estimate 2,160 SQFT $72.00 $155,520.00

Z0600 62501-0000 TURF ESTABLISHMENT

Stellar J Corporation $20,000.00 $20,000.00 Farline Bridge $4,500.00 $4,500.00 Conway Construction, Inc. $5,400.00 $5,400.00 Engineer's Estimate 1.0 ACRE $6,000.00 $6,000.00

8 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0620 62630-0350 PLANTINGS, TREES, BALLED AND BURLAPPED

Stellar J Corporation $1,200.00 $72,000.00 Farline Bridge $500.00 $30,000.00 Conway Construction, Inc. $80.00 $4,800.00 Engineer's Estimate 60 EACH $960.00 $57,600.00

Z0640 62635-3000 CUTTINGS, WILLOW POLE

Stellar J Corporation $30.00 $15,300.00 Farline Bridge $40.00 $20,400.00 Conway Construction, Inc. $25.00 $12,750.00 Engineer's Estimate 510 EACH $16.80 $8,568.00

Z0660 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Stellar J Corporation $2.00 $4,760.00 Farline Bridge $0.65 $1,547.00 Conway Construction, Inc. $0.68 $1,618.40 Engineer's Estimate 2,380 LNFT $1.50 $3,570.00

Z0680 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Stellar J Corporation $6.00 $7,200.00 Farline Bridge $0.35 $420.00 Conway Construction, Inc. $0.37 $444.00 Engineer's Estimate 1,200 LNFT $0.48 $576.00

Z0700 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2

Stellar J Corporation $5.00 $10.00 Farline Bridge $55.00 $110.00 Conway Construction, Inc. $55.00 $110.00 Engineer's Estimate 2 EACH $108.00 $216.00

Z0720 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Stellar J Corporation $5.00 $10.00 Farline Bridge $165.00 $330.00 Conway Construction, Inc. $218.00 $436.00 Engineer's Estimate 2 EACH $450.00 $900.00

9 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0740 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Stellar J Corporation $5.00 $140.00 Farline Bridge $21.00 $588.00 Conway Construction, Inc. $24.00 $672.00 Engineer's Estimate 28 EACH $30.00 $840.00

Z0760 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Stellar J Corporation $5.00 $120.00 Farline Bridge $49.00 $1,176.00 Conway Construction, Inc. $45.00 $1,080.00 Engineer's Estimate 24 EACH $84.00 $2,016.00

Z0780 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Stellar J Corporation $6,000.00 $12,000.00 Farline Bridge $10,000.00 $20,000.00 Conway Construction, Inc. $20,000.00 $40,000.00 Engineer's Estimate 2 EACH $24,000.00 $48,000.00

Z0800 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Stellar J Corporation $30.00 $2,490.00 Farline Bridge $10.00 $830.00 Conway Construction, Inc. $36.00 $2,988.00 Engineer's Estimate 83 SQFT $36.00 $2,988.00

Z0820 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Stellar J Corporation $70.00 $13,440.00 Farline Bridge $67.90 $13,036.80 Conway Construction, Inc. $95.00 $18,240.00 Engineer's Estimate 192 HOUR $81.60 $15,667.20

Z0840 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Stellar J Corporation $125.00 $12,000.00 Farline Bridge $84.80 $8,140.80 Conway Construction, Inc. $125.00 $12,000.00 Engineer's Estimate 96 HOUR $98.40 $9,446.40

10 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0860 64630-0000 ROADSIDE DEVELOPMENT (ACCESS ROAD)

Stellar J Corporation Lump Sum $250,000.00 Farline Bridge Lump Sum $255,000.00 Conway Construction, Inc. Lump Sum $180,000.00 Engineer's Estimate ALL LPSM Lump Sum $450,000.00

Total Schedule - All Items

Stellar J Corporation $6,534,540.00 Farline Bridge $6,749,184.60 Conway Construction, Inc. $6,870,426.40 Engineer's Estimate $6,573,348.99

11 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Solcitation No: 69056723B000010

Division: Western Federal Lands

State: OR County: Lane

Federal Land: Willamette National Forest Opened at: FHWA Vancouver, WA Office

Opened by: Robert Kolln

Date: 03/21/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Stellar J Corporation $11,705,291.00 1363 Down River Drive Woodland, WA 98674

Farline Bridge $14,321,912.20 1445 Miller DR Stayton, OR 973839431

Conway Construction, Inc. $15,425,506.40 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665

Engineer's Estimate $8,428,937.44

12 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Stellar J Corporation Lump Sum $1,250,000.00 Farline Bridge Lump Sum $1,433,000.00 Conway Construction, Inc. Lump Sum $3,600,000.00 Engineer's Estimate ALL LPSM Lump Sum $903,100.44

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Stellar J Corporation Lump Sum $125,000.00 Farline Bridge Lump Sum $57,900.00 Conway Construction, Inc. Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Stellar J Corporation Lump Sum $400,000.00 Farline Bridge Lump Sum $685,000.00 Conway Construction, Inc. Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $120,000.00

A0080 15401-0000 CONTRACTOR TESTING

Stellar J Corporation Lump Sum $150,000.00 Farline Bridge Lump Sum $240,000.00 Conway Construction, Inc. Lump Sum $190,000.00 Engineer's Estimate ALL LPSM Lump Sum $120,000.00

A0100 15501-0000 CONSTRUCTION SCHEDULE

Stellar J Corporation Lump Sum $5,000.00 Farline Bridge Lump Sum $55,000.00 Conway Construction, Inc. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,000.00

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Stellar J Corporation $9.00 $8,730.00 Farline Bridge $3.00 $2,910.00 Conway Construction, Inc. $8.00 $7,760.00 Engineer's Estimate 970 LNFT $6.00 $5,820.00

13 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Stellar J Corporation $9.00 $12,870.00 Farline Bridge $3.50 $5,005.00 Conway Construction, Inc. $8.00 $11,440.00 Engineer's Estimate 1,430 LNFT $8.40 $12,012.00

A0160 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Stellar J Corporation $5,000.00 $30,000.00 Farline Bridge $2,000.00 $12,000.00 Conway Construction, Inc. $7,000.00 $42,000.00 Engineer's Estimate 6 EACH $5,760.00 $34,560.00

A0180 20304-4000 REMOVAL OF BRIDGE SUPERSTRUCTURE (END FRAMES)

Stellar J Corporation Lump Sum $40,000.00 Farline Bridge Lump Sum $200,000.00 Conway Construction, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,800.00

A0200 20304-5000 REMOVAL OF BUILDING (USGS GAGE STATION)

Stellar J Corporation Lump Sum $40,000.00 Farline Bridge Lump Sum $75,000.00 Conway Construction, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $21,600.00

A0220 20305-1000 REMOVAL OF CONCRETE

Stellar J Corporation $700.00 $36,400.00 Farline Bridge $575.00 $29,900.00 Conway Construction, Inc. $600.00 $31,200.00 Engineer's Estimate 52 CUYD $420.00 $21,840.00

A0240 20801-0000 STRUCTURE EXCAVATION

Stellar J Corporation $200.00 $423,400.00 Farline Bridge $90.00 $190,530.00 Conway Construction, Inc. $120.00 $254,040.00 Engineer's Estimate 2,117 CUYD $95.00 $201,115.00

14 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 20811-0000 SHORING AND BRACING

Stellar J Corporation $60.00 $33,000.00 Farline Bridge $100.00 $55,000.00 Conway Construction, Inc. $240.00 $132,000.00 Engineer's Estimate 550 SQFT $54.00 $29,700.00

A0280 20815-0000 COFFERDAMS

Stellar J Corporation Lump Sum $950,000.00 Farline Bridge Lump Sum $1,000,000.00 Conway Construction, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $480,000.00

A0300 20820-0000 DEWATERING

Stellar J Corporation Lump Sum $350,000.00 Farline Bridge Lump Sum $180,000.00 Conway Construction, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00

A0320 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

Stellar J Corporation $250.00 $423,750.00 Farline Bridge $120.00 $203,400.00 Conway Construction, Inc. $200.00 $339,000.00 Engineer's Estimate 1,695 CUYD $120.00 $203,400.00

A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2

Stellar J Corporation $100.00 $9,800.00 Farline Bridge $175.00 $17,150.00 Conway Construction, Inc. $35.00 $3,430.00 Engineer's Estimate 98 TON $48.00 $4,704.00

A0360 40302-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (2" THICKNESS)

Stellar J Corporation $30.00 $24,540.00 Farline Bridge $25.82 $21,120.76 Conway Construction, Inc. $28.00 $22,904.00 Engineer's Estimate 818 SQYD $21.60 $17,668.80

15 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Stellar J Corporation $40.00 $32,720.00 Farline Bridge $17.43 $14,257.74 Conway Construction, Inc. $14.00 $11,452.00 Engineer's Estimate 818 SQYD $21.60 $17,668.80

A0400 41401-2000 CRACKS, CLEANING AND SEALING

Stellar J Corporation $60.00 $21,000.00 Farline Bridge $61.00 $21,350.00 Conway Construction, Inc. $46.00 $16,100.00 Engineer's Estimate 350 LNFT $24.00 $8,400.00

A0420 50201-0000 CONCRETE PAVEMENT RESTORATION, PAVEMENT PATCH

Stellar J Corporation $350.00 $7,000.00 Farline Bridge $350.00 $7,000.00 Conway Construction, Inc. $500.00 $10,000.00 Engineer's Estimate 20 SQYD $720.00 $14,400.00

A0440 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

Stellar J Corporation $1,000.00 $743,000.00 Farline Bridge $1,500.00 $1,114,500.00 Conway Construction, Inc. $2,400.00 $1,783,200.00 Engineer's Estimate 743 CUYD $1,200.00 $891,600.00

A0460 55220-0000 REPAIR CONCRETE

Stellar J Corporation $1,800.00 $72,000.00 Farline Bridge $500.00 $20,000.00 Conway Construction, Inc. $5,000.00 $200,000.00 Engineer's Estimate 40 SQYD $720.00 $28,800.00

A0480 55225-0000 CLEAN AND RESEAL JOINTS

Stellar J Corporation $60.00 $4,800.00 Farline Bridge $57.00 $4,560.00 Conway Construction, Inc. $50.00 $4,000.00 Engineer's Estimate 80 LNFT $48.00 $3,840.00

16 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 55235-0000 EXPANSION JOINTS (ASPHALTIC PLUG SEAL)

Stellar J Corporation $250.00 $19,500.00 Farline Bridge $173.00 $13,494.00 Conway Construction, Inc. $240.00 $18,720.00 Engineer's Estimate 78 LNFT $216.00 $16,848.00

A0520 55401-1000 REINFORCING STEEL

Stellar J Corporation $4.00 $812,480.00 Farline Bridge $3.50 $710,920.00 Conway Construction, Inc. $2.50 $507,800.00 Engineer's Estimate 203,120 LB $2.90 $589,048.00

A0540 55501-0000 STRUCTURAL STEEL (RIVET REPLACEMENT)

Stellar J Corporation Lump Sum $3,000.00 Farline Bridge Lump Sum $25,000.00 Conway Construction, Inc. Lump Sum $12,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0560 55506-0000 MISCELLANEOUS STEEL (END FRAME)

Stellar J Corporation $60,000.00 $360,000.00 Farline Bridge $85,000.00 $510,000.00 Conway Construction, Inc. $80,000.00 $480,000.00 Engineer's Estimate 6 EACH $34,000.00 $204,000.00

A0580 55506-0000 MISCELLANEOUS STEEL (SEAT BRACKET)

Stellar J Corporation $6,000.00 $432,000.00 Farline Bridge $15,000.00 $1,080,000.00 Conway Construction, Inc. $6,400.00 $460,800.00 Engineer's Estimate 72 EACH $6,820.00 $491,040.00

A0600 55506-0000 MISCELLANEOUS STEEL (TRUSS ANCHORING SYSTEM)

Stellar J Corporation $60,000.00 $240,000.00 Farline Bridge $45,000.00 $180,000.00 Conway Construction, Inc. $90,000.00 $360,000.00 Engineer's Estimate 4 EACH $28,800.00 $115,200.00

17 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 55506-0000 MISCELLANEOUS STEEL (END ANCHORAGE)

Stellar J Corporation $75,000.00 $600,000.00 Farline Bridge $100,000.00 $800,000.00 Conway Construction, Inc. $120,000.00 $960,000.00 Engineer's Estimate 8 EACH $27,000.00 $216,000.00

A0640 55506-0000 MISCELLANEOUS STEEL (JACKETING)

Stellar J Corporation $175,000.00 $700,000.00 Farline Bridge $185,000.00 $740,000.00 Conway Construction, Inc. $170,000.00 $680,000.00 Engineer's Estimate 4 EACH $165,000.00 $660,000.00

A0660 55901-0000 MEMBRANE WATERPROOFING

Stellar J Corporation $37.00 $30,266.00 Farline Bridge $37.00 $30,266.00 Conway Construction, Inc. $42.00 $34,356.00 Engineer's Estimate 818 SQYD $54.00 $44,172.00

A0680 56101-0000 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR

Stellar J Corporation $65.00 $55,250.00 Farline Bridge $78.00 $66,300.00 Conway Construction, Inc. $74.00 $62,900.00 Engineer's Estimate 850 LNFT $45.00 $38,250.00

A0700 56203-0000 TEMPORARY SUPPORT STRUCTURE (BRIDGE JACKING)

Stellar J Corporation $75,000.00 $300,000.00 Farline Bridge $150,000.00 $600,000.00 Conway Construction, Inc. $100,000.00 $400,000.00 Engineer's Estimate 4 EACH $24,000.00 $96,000.00

A0720 56203-0000 TEMPORARY SUPPORT STRUCTURE (BRIDGE JACKING)

Stellar J Corporation $40,000.00 $80,000.00 Farline Bridge $450,000.00 $900,000.00 Conway Construction, Inc. $150,000.00 $300,000.00 Engineer's Estimate 2 EACH $36,000.00 $72,000.00

18 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0740 56302-2000 PAINTING, STEEL STRUCTURE (SUBSTRUCTURE)

Stellar J Corporation $40.00 $134,000.00 Farline Bridge $73.45 $246,057.50 Conway Construction, Inc. $76.00 $254,600.00 Engineer's Estimate 3,350 SQFT $30.00 $100,500.00

A0760 56302-2000 PAINTING, STEEL STRUCTURE

Stellar J Corporation $350.00 $525,000.00 Farline Bridge $177.30 $265,950.00 Conway Construction, Inc. $175.00 $262,500.00 Engineer's Estimate 1,500 SQFT $110.00 $165,000.00

A0780 56302-2000 PAINTING, STEEL STRUCTURE

Stellar J Corporation $90.00 $211,500.00 Farline Bridge $70.45 $165,557.50 Conway Construction, Inc. $75.00 $176,250.00 Engineer's Estimate 2,350 SQFT $80.00 $188,000.00

A0800 56401-3000 BEARING DEVICE, SLIDING

Stellar J Corporation $5,000.00 $30,000.00 Farline Bridge $40,000.00 $240,000.00 Conway Construction, Inc. $20,000.00 $120,000.00 Engineer's Estimate 6 EACH $8,000.00 $48,000.00

A0820 56701-0000 MICROPILE

Stellar J Corporation $300.00 $805,200.00 Farline Bridge $242.00 $649,528.00 Conway Construction, Inc. $460.00 $1,234,640.00 Engineer's Estimate 2,684 LNFT $265.00 $711,260.00

A0840 56705-0000 MICROPILE LOAD VERIFICATION TEST

Stellar J Corporation $30,000.00 $60,000.00 Farline Bridge $20,000.00 $40,000.00 Conway Construction, Inc. $21,000.00 $42,000.00 Engineer's Estimate 2 EACH $3,600.00 $7,200.00

19 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0860 56706-0000 MICROPILE PROOF LOAD TEST

Stellar J Corporation $5,000.00 $20,000.00 Farline Bridge $4,500.00 $18,000.00 Conway Construction, Inc. $5,000.00 $20,000.00 Engineer's Estimate 4 EACH $1,200.00 $4,800.00

A0880 57501-0000 MINOR BRIDGE WORK

Stellar J Corporation Lump Sum $200,000.00 Farline Bridge Lump Sum $280,000.00 Conway Construction, Inc. Lump Sum $112,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00

A0900 57705-0200 FIBER REINFORCED POLYMER (FRP), STRENGTHENING SYSTEM (CFRP)

Stellar J Corporation $90.00 $82,800.00 Farline Bridge $82.00 $75,440.00 Conway Construction, Inc. $160.00 $147,200.00 Engineer's Estimate 920 SQFT $144.00 $132,480.00

A0920 57705-0200 FIBER REINFORCED POLYMER (FRP), STRENGTHENING SYSTEM (CFRP)

Stellar J Corporation $105.00 $161,700.00 Farline Bridge $82.00 $126,280.00 Conway Construction, Inc. $85.00 $130,900.00 Engineer's Estimate 1,540 SQFT $72.00 $110,880.00

A0940 60103-4200 CONCRETE, PLANK (REMOVE AND RESET)

Stellar J Corporation $500.00 $2,000.00 Farline Bridge $10.00 $40.00 Conway Construction, Inc. $18,000.00 $72,000.00 Engineer's Estimate 4 EACH $1,800.00 $7,200.00

A0960 60510-0300 4-INCH COLLECTOR PIPE

Stellar J Corporation $10.00 $39,000.00 Farline Bridge $22.00 $85,800.00 Conway Construction, Inc. $5.00 $19,500.00 Engineer's Estimate 3,900 LNFT $7.20 $28,080.00

20 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0980 61601-1000 SLOPE PAVING, CONCRETE

Stellar J Corporation $250.00 $87,500.00 Farline Bridge $250.00 $87,500.00 Conway Construction, Inc. $250.00 $87,500.00 Engineer's Estimate 350 SQYD $228.00 $79,800.00

A1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Stellar J Corporation $180.00 $7,200.00 Farline Bridge $195.00 $7,800.00 Conway Construction, Inc. $200.00 $8,000.00 Engineer's Estimate 40 HOUR $186.00 $7,440.00

A1020 62201-0500 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 4-WHEEL DRIVE

Stellar J Corporation $110.00 $4,400.00 Farline Bridge $165.00 $6,600.00 Conway Construction, Inc. $190.00 $7,600.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00

A1040 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT

Stellar J Corporation $150.00 $6,000.00 Farline Bridge $215.00 $8,600.00 Conway Construction, Inc. $230.00 $9,200.00 Engineer's Estimate 40 HOUR $228.00 $9,120.00

A1060 62201-3750 CHAIN SAW

Stellar J Corporation $80.00 $1,600.00 Farline Bridge $50.00 $1,000.00 Conway Construction, Inc. $120.00 $2,400.00 Engineer's Estimate 20 HOUR $96.00 $1,920.00

A1080 62301-0000 GENERAL LABOR

Stellar J Corporation $75.00 $12,000.00 Farline Bridge $115.00 $18,400.00 Conway Construction, Inc. $117.00 $18,720.00 Engineer's Estimate 160 HOUR $98.40 $15,744.00

21 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1100 62501-0000 TURF ESTABLISHMENT

Stellar J Corporation $20,000.00 $30,000.00 Farline Bridge $4,500.00 $6,750.00 Conway Construction, Inc. $5,400.00 $8,100.00 Engineer's Estimate 1.5 ACRE $6,000.00 $9,000.00

A1120 62635-3000 CUTTINGS, WILLOW POLE

Stellar J Corporation $35.00 $17,150.00 Farline Bridge $40.00 $19,600.00 Conway Construction, Inc. $25.00 $12,250.00 Engineer's Estimate 490 EACH $16.80 $8,232.00

A1140 63302-0000 SIGN SYSTEM

Stellar J Corporation $40.00 $1,280.00 Farline Bridge $85.00 $2,720.00 Conway Construction, Inc. $200.00 $6,400.00 Engineer's Estimate 32 SQFT $120.00 $3,840.00

A1160 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Stellar J Corporation $2.00 $3,760.00 Farline Bridge $0.75 $1,410.00 Conway Construction, Inc. $0.78 $1,466.40 Engineer's Estimate 1,880 LNFT $1.50 $2,820.00

A1180 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Stellar J Corporation Lump Sum $200,000.00 Farline Bridge Lump Sum $350,000.00 Conway Construction, Inc. Lump Sum $157,000.00 Engineer's Estimate ALL LPSM Lump Sum $372,000.00

A1200 63502-0300 TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE C

Stellar J Corporation $2,000.00 $4,000.00 Farline Bridge $5,300.00 $10,600.00 Conway Construction, Inc. $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $8,040.00 $16,080.00

22 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1220 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2

Stellar J Corporation $65.00 $325.00 Farline Bridge $55.00 $275.00 Conway Construction, Inc. $55.00 $275.00 Engineer's Estimate 5 EACH $108.00 $540.00

A1240 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Stellar J Corporation $165.00 $1,650.00 Farline Bridge $165.00 $1,650.00 Conway Construction, Inc. $218.00 $2,180.00 Engineer's Estimate 10 EACH $450.00 $4,500.00

A1260 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Stellar J Corporation $5.00 $1,060.00 Farline Bridge $21.00 $4,452.00 Conway Construction, Inc. $24.00 $5,088.00 Engineer's Estimate 212 EACH $30.00 $6,360.00

A1280 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Stellar J Corporation $40.00 $5,040.00 Farline Bridge $49.00 $6,174.00 Conway Construction, Inc. $46.00 $5,796.00 Engineer's Estimate 126 EACH $84.00 $10,584.00

A1300 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Stellar J Corporation $4,000.00 $24,000.00 Farline Bridge $10,000.00 $60,000.00 Conway Construction, Inc. $26,000.00 $156,000.00 Engineer's Estimate 6 EACH $24,000.00 $144,000.00

A1320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Stellar J Corporation $30.00 $9,510.00 Farline Bridge $10.00 $3,170.00 Conway Construction, Inc. $37.00 $11,729.00 Engineer's Estimate 317 SQFT $36.00 $11,412.00

23 out of 23

Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1340 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Stellar J Corporation $70.00 $80,360.00 Farline Bridge $67.90 $77,949.20 Conway Construction, Inc. $95.00 $109,060.00 Engineer's Estimate 1,148 HOUR $81.60 $93,676.80

A1360 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Stellar J Corporation $125.00 $71,750.00 Farline Bridge $84.80 $48,675.20 Conway Construction, Inc. $125.00 $71,750.00 Engineer's Estimate 574 HOUR $98.40 $56,481.60

A1380 64620-0000 REMOVE AND RESET (BOAT RAMP)

Stellar J Corporation $40,000.00 $40,000.00 Farline Bridge $105,370.30 $105,370.30 Conway Construction, Inc. $5,300.00 $5,300.00 Engineer's Estimate 1 EACH $24,000.00 $24,000.00

Total Schedule - All Items

Stellar J Corporation $11,705,291.00 Farline Bridge $14,321,912.20 Conway Construction, Inc. $15,425,506.40 Engineer's Estimate $8,428,937.44

2023-03-22T08:51:23-0700
DEAN ALAN UMATHUM

File details come from the government source that posted it. Updated .