This Task Group Instruction (TGI) details the technical requirements for a 5-year inspection and preparation of the 1B Boiler on the USS Blue Ridge (LCC-19). The document outlines a comprehensive procedure for inspecting, cleaning, painting, and reinstalling various boiler components, including superheater tubes, refractory materials, and associated piping systems. Key steps include scale cleaning of tubes, applying heat-resistant aluminum paint, installing Fiberfrax (FC-25) insulation, and applying a lightweight castable refractory cap.
The instruction specifies precise technical requirements for each component, such as tube cleaning methods, paint application procedures, curing times, and installation guidelines. Critical requirements include maintaining specific ambient air curing times for different materials, documenting each inspection step in the Boiler Inspection and Repair Management Information System (BIRMIS), and ensuring proper lay-up conditions. The procedure is applicable to multiple naval vessels, including the USS Blue Ridge, and must be completed between January 2026 and December 2027, with specific inspection and preparation protocols to prevent tube corrosion and ensure optimal boiler performance.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 1B BLR 5YR INSP PREP AY A 0 2
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*F/O - ACCOMPLISH 1B BOILER 5 YEAR INSPECTION SUPPORT
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YUUYA YAJIMA 234. 315-243-0977 1 AUG 2024
APPROVED BY: CODE PHONE DATE
NORIAKI IZUMI 234. 315-243-2243 1 AUG 2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Modify reference 2.20.
CHANGE INSTRUCTIONS:
CH1: Add CFM cost and modify procedure 5.8. (12/25/2024) CH2: Modify reference 2.20. (1/13/2025)
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 1B BLR 5YR INSP PREP AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 2/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-20 Sketch (1-7)
J1-2 M1-13 Sketch (1-3)
1. SCOPE/PURPOSE
1.1 Title: 1B Boiler 5 Year Inspection Support; accomplish
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.2.2 Test Laboratory (5-83-1-Q)
1.2.3 Blower Room (5-79-0-E)
1.2.4 Uptake Space (5-76-0-Q)
1.2.5 Void (9-82-4-V)
1.2.6 Contractors Facility
1.3 Identification:
1.3.1 Quantity (One EA), Boiler, Main Propulsion, 1B
Mfr: Foster Wheeler Corp Mfr ID: N/A Design Pressure: 705 PSIG Max Operating Pressure: 655 PSIG
APL: 021550096
1.3.1.1 Quantity (One Lot), Temporary Access Cover
Cover Material: Aluminum Alloy 5086 Hand Grab Material: Aluminum Alloy 5086 Gasket Material: Neoprene Rubber
1.3.1.2 Quantity (One Lot), Main Feed Piping
Remarks: The area is from main feed control valve (1MF-E34) to steam drum inlet includes vent, drain, bypass, piping and economizer header with header drain piping See 2.23 through 2.27
1.3.1.3 Quantity (One Lot), U-Bend and Header Stub, Economizer Remarks: The area is boiler front and rear (U-Bend) and inlet and outlet header (Stub) See 2.28
1.3.1.4 Quantity (One Lot), Saturated Steam Piping
Remarks: The area is from steam drum to superheater inlet header includes vent and bypass piping See 2.29 through 2.33
1.3.1.5 Quantity (One Lot), Nozzle, Steam Drum
FOUO
SHIP: LCC-19 CHG/VER: 2/2
Remarks: The area is top, front and rear side of steam drum See 2.34
1.3.1.6 Quantity (One Lot), Superheater High Pressure(HP) Drain Piping Remarks: The area is inlet and outlet superheater header at front and rear side, from each header nozzle to each second valve includes inside air casing area See 2.35
1.3.1.7 Quantity (One Lot), Main Steam Piping
Remarks: The area is from superheater outlet header to pipe hanger (1B16) section on main steam stop valve (1MS-1B) outlet piping and desuperheater inlet on the steam drum includes backfill, vent, drain and bypass piping
See 2.29 through 2.34
1.3.1.8 Quantity (One Lot), 600 LB Auxiliary Steam Piping
Remarks: The area is from desuperheater outlet on the steam drum to valve (1AS-1B) includes vent, drain and bypass piping See 2.36 through 2.39
1.3.1.9 Quantity (One Lot), Bottom Blow Piping (Carbon Steel) Remarks: The area is from each drum and header nozzle to first valve (water drum, screen wall header, side wall header and rear wall header) See 2.40 and 2.41
1.3.1.10 Quantity (One Lot), Surface and Bottom Blow Piping (Monel) Remarks: The area is from valve (1B-BB-1) to each first valve See 2.40 and 2.41
1.3.1.11 Quantity (One Lot), Water Drum Sample Cooler Piping
Remarks: The area is from valve (1B-BB-5B) to sample cooler See 2.42
1.3.1.12 Quantity (One Lot), De-Superheater Sample Cooler Piping Remarks: The area is from de-superheater outlet piping to sample cooler See 2.37 through 2.39
1.3.1.13 Quantity (One Lot), Feed Control Piping (Transmitter Sensing Piping) Remarks: The area is from main feed piping connection to each second valve includes each sediment chamber, and bypass piping, and from saturated steam piping connection to each second valve includes each sediment chamber and bypass piping, and from steam drum piping connection to each second valve includes each sediment chamber
See 2.24 through 2.26 and 2.43
1.3.3.14 Quantity (One Lot), Steam Smothering Piping
Remarks: The area is from 1B boiler air casing to each valve (1AS-E23 and 1AS-E44) includes test connection bypass piping See 2.44 through 2.47
1.3.1.15 Quantity (One Lot), Soot Blower Piping
Remarks: The area is from each soot blower head to each valve (1AS-E6 and LP-E3B) includes air pressurizing piping and drain reservoir See 2.48 and 2.49
1.3.1.16 Quantity (One Lot), Steam Atomizing Piping
Remarks: The area is from No. One through No. 3 safety shut-off devices to boiler front corner section at upper level for atomizing steam root valve (12) side including bypass piping
FOUO
SHIP: LCC-19 CHG/VER: 2/2
See 2.44 through 2.47
1.3.1.17 Quantity (One Lot), Fuel Oil Burner Lead
Remarks: The area is from No. One through No.3 safety shut-off devices to valves (23, 24, and 25) for fuel oil supply manifold connections See 2.50 and 2.51
1.3.1.18 Quantity (One Lot), Bottom Blow Overboard Discharge Piping (Carbon Steel) Remarks: The area is from Valve 1B-BB-3 to Shell of Void See 2.41
1.3.1.19 Quantity (6 EA), Stuffing Box, Air Casing Penetration, High Pressure(HP) Drain Pipe Section and nozzle section, Inlet and Outlet Superheater Header Remarks: See 2.8, 2.15, 2.35, 2.41, 2.61 through 2.63
1.3.1.20 Quantity (6 EA), Stuffing Box, Air Casing Penetration, Screen Wall header, Side Wall Header, Rear Wall Header Remarks See 2.41 and 2.63
1.3.1.21 Quantity (5 EA), Variable Spring Hanger
System: 1B Boiler Main Steam Piping Hanger No.:1S3, 1S14, 1S29, 1S34 and 1S-35 Pipe Size of Hanger:
1S3 for 8 Inch IPS 1S14 for 4 Inch IPS 1S29 for 5 Inch IPS 1S34 and 1S35 for 6 Inch IPS Type of Hanger Assembly: 3A
1.3.1.22 Quantity (3 EA), Sway Brace
System: 1B Boiler Main Steam Piping Hanger No.: 1B16, 1B28 and 1B29 Pipe Size of Hanger:
1B16 for 5 Inch IPS 1B28 and 1B29 for 6 Inch IPS Type of Hanger Assembly: 3C
1.3.1.23 Quantity (4 EA), Variable Spring Hanger
System: 1B Boiler 600 PSI Auxiliary Steam Piping Hanger No.:2S1 through 2S4 Pipe Size of Hanger:
2S1 for 2 Inch IPS 2S2 and 2S3 for 4 Inch IPS 2S4 for 3 Inch IPS Type of Hanger Assembly: 3A
1.3.1.24 Quantity (One EA), Sway Brace
System: 1B Boiler 600 PSI Auxiliary Steam Piping Hanger No.: 2B1 Pipe Size of Hanger: 4 Inch IPS Type of Hanger Assembly: 3C
1.3.1.25 Quantity (5 EA), Variable Spring Hanger
System: 1B Boiler Feed Water Piping Hanger No.:30S15 through 30S19 Pipe Size of Hanger: 5 Inch IPS
FOUO
SHIP: LCC-19 CHG/VER: 2/2
Type of Hanger Assembly: 3A
1.3.1.26 Quantity (2 EA), Sway Brace
System: 1B Boiler Feed Water Piping Hanger No.: 30B13 and 30B14 Pipe Size of Hanger: 5 Inch IPS Type of Hanger Assembly: 3C
1.3.1.27 Quantity (2 EA), Plain Hanger
System: 1B Boiler Feed Water Piping Hanger No.: 30H10 and 30H11 Pipe Size of Hanger: 5 Inch IPS Type of Hanger Assembly: 3D
1.3.1.28 Quantity (3 EA), Sway Brace
System: 1B Boiler Soot Blower Piping Hanger No.: 11B1, 11B3 and 11B5 Pipe Size of Hanger:
11B3 for 1-1/2 Inch IPS 11B1 and 11B5 for 2 Inch IPS Type of Hanger Assembly: 3C
1.3.1.29 Quantity (3 EA), Plain Hanger
System: 1B Boiler Soot Blower Piping Hanger No.: 11H3, 11H4 and 11H6 Pipe Size of Hanger: 2 Inch IPS Type of Hanger Assembly: 3D
1.3.1.30 Quantity (10 EA), Plain Hanger for 1B Boiler Bottom Blow Piping System: 1B Boiler Bottom Blow Piping Hanger No.: S-9 through S-17 and S-19 Pipe Size of Hanger: 1-1/2 Inch IPS for S-9 through S-17
3/8 Inch IPS for S-19 Type of Hanger Assembly: 4
1.3.1.31 Quantity (One Lot), Various System Pipe Hangers
See 2.52 and 2.54 for details.
1.3.1.32 Quantity (One AY), 1B Boiler Bottom Blow Overboard Discharge Inner Sleeve Assembly Size: 1-1/2 Inch IPS Material: Monel Specification: MIL-T-1368 Remarks: See Sheet 2 (Plan 10-E and Elevation 12-D) and Sheet 3 (Detail 22-A) of 2.52. This assembly will be inspected by Code 281.
1.3.1.33 Quantity (One EA), 1B Blowdown Overboard Discharge Valve Type: Angle Globe Size: 1.50 IPS Valve No.: V-5 (L-19) of 2.41 (1BB-E8)
1.3.1.34 Quantity (One EA), Soot Blower Head, No. 2
Type: Rotary, 360-Degree Pressure: 600 PSI Model of Operation: Manual Rotation: Clockwise
FOUO
SHIP: LCC-19 CHG/VER: 2/2
1.3.1.35 Quantity (One EA), Soot Blower Head, No. 3
Same data as 1.3.1.34
1.3.1.36 Quantity (One EA), Soot Blower Head, No. 4
Same data as 1.3.1.34
1.3.1.37 Quantity (One EA), Soot Blower Head, No. 6
Type: Rotary, 240-Degree Pressure: 600 PSI Model of Operation: Manual Rotation: Clockwise
1.3.1.38 Quantity (One EA), Soot Blower Head, No. 8
Same data as 1.3.1.34
1.3.1.39 Quantity (One EA), Soot Blower Head, No. 9
Same data as 1.3.1.34
1.3.1.40 Quantity (One EA), Soot Blower Head, No. 5
Type: Angle Globe Size: 1.50 IPS Pressure: 600 PSI Operation: Manual, Handwheel
1.3.1.41 Quantity (One EA), Soot Blower Head, No. 7
Same data as 1.3.1.40
1.3.1.42 Quantity (One EA), Auxiliary Steam Valve for 1B Boiler Burner Resister Type: Globe, Stop Check Size: 0.75 IPS Valve No.: V-118 of 2.47 and 1AS-E91 of 2.20
1.3.1.43 Quantity (One EA), Auxiliary Steam Valve for 1B Boiler Burner Resister Type: Angle Globe, Stop Check Size: 0.75 IPS Valve No.: V-119 of 2.47 and 1AS-E89 of 2.20
1.3.1.44 Quantity (One EA), Auxiliary Steam Valve for 1B Boiler Burner Resister Type: Angle Globe, Stop Check Size: 0.75 IPS Valve No.: V-119 of 2.47 and 1AS-E90 of 2.20
1.3.1.45 Quantity (One Lot), Attachment Weld Joints, Weld Seams, Nozzle Welds, Exterior Surface of Steam Drum, Water Drum, Economizer Headers, Superheater Headers, Screen Wall Header, Side Wall Header, and Rear Wall Header Remarks: The inspection will be accomplished by Code 281
1.3.1.46 Quantity (One Lot), Water Side of Boiler, Internal Surface of Steam Drum, Water Drum, Economizer Headers, Superheater Headers, Screen Wall Header, Side Wall Header, and Rear Wall Header, Including Manhole plate and Handhole Plate, Gasket Seating Surface, Attachment Weld Joints and Soot blower Element Remarks: The inspection will be accomplished by Code 281
1.3.1.47 Quantity (One Lot), Boiler Tube, Screen Wall Tube, Superheater Support Tube, Superheater Tube, Side Wall Tube, and Rear Wall Tube
FOUO
SHIP: LCC-19 CHG/VER: 2/2
1.3.1.48 Quantity (2,027 SF in Total), External Surfaces of Steam Drum, Water Drum, Superheater Headers, Screen Wall Header, Side Wall Header, Rear Wall Header and External Surfaces of Downcomers, and Inner and Outer Air Casings Including Plate, Supports, Structural Framing, and Penetrations, Including Not Normally Accessible Area and Handhole Plate
1.3.2 Quantity (One Lot), Insulation and Lagging for 1B Boiler and Associated Piping
A. Location: Fire Room (8-76-0-E)
1.3.2.1 Quantity (40 FT), Lagging, Main Feed Piping with (One) Valve and (2) Flanges, 1B Boiler , Upper/Level Port Side to Rear Piping/Valve Size: 5 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.2 Quantity (20 SF), Lagging, Economizer Inlet and Outlet Header, 1B Boiler, Upper /Level Rear (Including Flanges and Bank Flanges and Drain Piping) Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.3 Quantity (3 FT), Lagging, Economizer Main Feed Inlet Drain Piping with (2) Valves and (2) Flanges, 1B Boiler, Upper/Level Rear Piping/Valve Size: 1-1/2 Inch IPS, 3/4 Inch IPS Pipe/Valve Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.4 Quantity (4 FT), Lagging, Economizer Outlet Drain Piping with (2) Flanges and (2) Valves, 1B Boiler, Upper/Level Rear Piping/Valve Size: One Inch IPS, 3/4 Inch IPS Pipe/Valve Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.5 Quantity (6 FT), Lagging, Main Feed Drain Piping with (2) Valves, 1B Boiler, Upper/Level Rear/Port Side Piping/Valve Size: 1/2 Inch IPS Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9
1.3.2.6 Quantity (30 FT), Lagging, Saturated Steam Piping, 1B Boiler, Lower/Level, Front and Upper/Level Piping Size: 6 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
FOUO
SHIP: LCC-19 CHG/VER: 2/2
1.3.2.7 Quantity (10 FT), Lagging, Superheater Protection Steam (SPS) Piping with (2) Valves, 1B Boiler, Upper/Level Rear, In Front of Steam Drum
Piping/Valve Size: 2 Inch IPS Pipe/Valve Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.8 Quantity (8 FT), Lagging, SPS Drain Piping with (2) Valves, 1B Boiler, Upper/Level Rear and Front of Steam Drum
Piping/Valve Size: 1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.9 Quantity (One EA), Lagging Pad, SPS Relief Valve, 1B Boiler, Upper/Level Rear, In Front of Steam Drum Valve Size: 3/4 Inch IPS
Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.10 Quantity (70 SF), Lagging, Steam Drum, 1B Boiler, Upper/Level (Including Front and Rear Ends Side, Under the Safety Valves and Associated Piping)
Drum Insulation: MIL-PRF-2819 Lagging: MIL-C-20079, Type I, Class 9 Weld Joint Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.11 Quantity (10 FT), Lagging, Steam Drum Vent Piping with (4) Valves and (2) Flanges, 1B Boiler, Upper/Level, In Front of Steam Drum
Piping Size: 1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Valve Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.12 Quantity( 8 FT), Lagging, Aux Steam Drain Piping with (3) Valves, 1B Boiler, Upper/Level Rear Piping Size: 1/2 Inch IPS Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9
1.3.2.13 Quantity (3 FT). Lagging, Aux Steam Drain Piping with (3) Valves, 1B Boiler, Upper/Level Rear Above Steam Drum
Piping Size: 1/2 Inch IPS Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9
1.3.2.14 Quantity (20 FT) Lagging, Main Steam Piping with (One) Main Steam Stop Valve (Superheater to First Valve), 1B Boiler, Lower/Level Rear
Piping/Valve Size: 5 Inch IPS, 6 Inch IPS, 9 Inch IPS, Insulation: MIL-DTL-2781
FOUO
SHIP: LCC-19 CHG/VER: 2/2
Lagging: MIL-C-20079, Type I, Class 9
1.3.2.15 Quantity (20 FT), Lagging, Main Steam Piping with Desuperheater Inlet Valve, Superheater Outlet to Desuperheater Inlet, 1B Boiler, Lower/Level to Upper/Level Rear Piping Size: 4 Inch IPS Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9
1.3.2.16 Quantity (One EA), Lagging Pad, Steam Blank Flange, 1B Boiler, Upper/Level Rear Piping Size: 1/2 Inch IPS Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.17 Quantity (22 FT), Lagging, HP Drain Piping with (13) Valves and (3) Flanges, 1B Boiler, Lower/Level Rear Piping/Valve Size: 1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.18 Quantity (13 FT), Lagging, HP Drain Piping with (2) Valves and (3) Flanges, 1B Boiler, Lower/Level Rear Piping Size: 3/4 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.19 Quantity (7 FT), Lagging, Aux Steam Piping with (One) Valve (1AS-1B), 1B Boiler, Upper/Level Rear Piping/Valve Size: 4 Inch IPS Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9
1.3.2.20 Quantity (20 SF), Lagging, Water Drum, 1B Boiler, Lower/Level Bottom (Including Front, Rear Ends and Bottom Blow Pipe Nozzle Section) Insulation: MIL-PRF-2819 Lagging: MIL-C-20079, Type I, Class 9
1.3.2.21 Quantity (60 FT), Lagging, Water Drum Sample Cooler Piping (2 Pipes), 1B Boiler, Upper/Level to Lower/Level Behind of DFT Piping Size: 1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.22 Quantity (60 FT), Lagging, Desuperheater Sample Cooler Piping (2 Pipes), 1B Boiler Piping Size: 1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
FOUO
SHIP: LCC-19 CHG/VER: 2/2
1.3.2.23 Quantity (40 FT), Lagging, Steam Smothering Piping with (2) Valves and (1) Flanges, 1B Boiler, Lower/Level
Piping/Valve Size: 3/4 Inch IPS Pipe/Valve Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.24 Quantity (50 FT), Lagging, Soot Blower Piping with (2) Valves and (4) Flanges, 1B Boiler, Upper/Level to Lower/Level
Piping/Valve Size: 1-1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.25 Quantity (40 FT), Lagging, Soot Blower Piping with (2) Valves, 1B Boiler, Upper/Level to Lower/Level Piping/Valve Size: 2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.26 Quantity (4 FT), Lagging, Soot Blower Piping with (One) Valve and (One) Flange, 1b Boiler, Upper/Level to Lower/Level
Piping/Valve Size: One Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.27 Quantity (5 FT), Lagging, Surface Blow Piping with (One) Valve, 1B Boiler, Upper/Level to Lower/Level Piping/Valve Size: 1-1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.28 Quantity (5 FT), Lagging, Steam Atomizing Piping, 1B Boiler, Lower/Level Front [Apply Boiler Epoxy Coating on New Lagging]
Piping Size: One Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.29 Quantity (25 FT), Lagging, Steam Atomizing Piping with (5) Valves and (7) Flanges, 1B Boiler, Lower/Level Front [Apply Boiler Epoxy Coating on New Lagging]
Piping/Valve Size: 3/4 Inch IPS
FOUO
SHIP: LCC-19 CHG/VER: 2/2
Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.2.30 Quantity (1010 SF), Lagging, Outer Casing including Access Plate, Furnace Side, Front Side, Rear Side, Generator Bank Side, Lower Slope Area and Roof Area, Economizer Front/Rear/Side/Top Side Casing and Access Door Insulation: MIL-DTL-32585 , Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details. Preservation work is not required on lagging pad.
1.3.2.31 Quantity (One Lot), Lagging Pad, Manhole Cover, Steam Drum and Water Drum Insulation: MIL-DTL-32585 , Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
B. Location: Oil Lab (5-83-1-Q)
1.3.2.33 Quantity (12 FT) Lagging, Water Drum Sample Cooler Pipe with (One) Valve and (One) Flange, 1B Boiler Piping/Valve Size: 1/2 Inch IPS Pipe Insulation: MIL-DTL-2781 Lagging: MIL-C-20079, Type I, Class 9 Valve/Flange Insulation: MIL- DTL-32585, Type-I, form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: Preservation work is not required on lagging pad.
1.3.3 Quantity (60 SF), Castable Refractory, Furnace Front Wall, 1B Boiler located in 1.2.1 Material: Castable Refractory, Fireclay Specification: MIL-C-717 Remarks: See PC No. 12 of 2.80
1.3.3.1 Anchor Strip
Material: CRES CL 310 Specification: ASTM A-240 Remarks: See PC No. 34 of 2.80
1.3.3.2 Wire
Material: Nichrome Specification: ASTM B-166 Remarks: See PC No. 38 of 2.80
1.3.4 Quantity (50 SF), Castable Refractory, Furnace Screen, Side and Rearwall Headers, 1B Boiler located in 1.2.1 Material: Castable Refractory, Fireclay Specification: MIL-C-717 Remarks: See PC No. 12 of 2.80
1.3.4.1 Anchor Strip
Material: CRES CL 310 Specification: ASTM A-240 Remarks: See PC No. 34 of 2.80
1.3.4.2 Wire
Material: Nichrome Specification: ASTM B-166 Remarks: See PC No. 38 of 2.80
FOUO
SHIP: LCC-19 CHG/VER: 2/2
1.3.5 Quantity (30 SF), Fiberfrax (Ceramic Fiber Tamping Mix /FC-25), Super Heater Tube Penetration,1B Boiler Superheater Cavity Area, until adequate position to interspace of each superheater tube
Material: Ceramic Fiber Remarks; See PC No. 35 of 2.80 and PC No. 2 of 2.81 for the details.
1.3.5.1 Refractory Retaining Plate for 1B Boiler Inlet/Outlet Superheater Header Material: CRES 316L, 0.063 Inch Thickness Sheet Specification: ASTM A-240 Remarks: See PC No. 3 through 8 of 2.81 for details.
1.3.5.2 Rope, Fiberfrax
Material: Ceramic Fiber Specification: 1365-626-7BPC8007 Remarks: See PC No. One of 2.81 for details.
1.3.6 Quantity (One Lot), Scaffolding Assembly for 1B Boiler Smoke Pipe Remarks: The inspection will be accomplished by Code 281
1.3.7 Quantity (One Lot), Entire 1B Boiler Smoke Pipe, From Top to Economizer, Including Expansion Joints, Weld Joints and Pipe Openings
Remarks: The inspection will be accomplished by Code 281
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Lead Hazard.
1.5.2 Potential Asbestos Hazard.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 6/12/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-
GY-STM-
010/CH-221
Boilers 8 - N
4 DWG 47-
360-665-2
GENERAL ARRANGEMENT MAIN
SECTIONS
R N
5 DWG D-674-
Main Boiler 5-1/2" O.D. Economizer Inlet Header
D N
6 DWG D-674-
Main Boiler 5-1/2" O.D. Economizer Outlet Header
C N
7 DWG 205-
2492053
Uptakes, Upper - DETLS, L/M B N
8 DWG D-675-
145-C
MAIN BOILER CASING
ARRANGEMENT
C N
9 DWG D-675-
146-B
MAIN BOILER CASING SECTIONS B N
10 DWG D-675-
131-E
ARRG'T & DETAILS OF OUTER
REAR CASING
E N
FOUO
SHIP: LCC-19 CHG/VER: 2/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
11 DWG D-675-
129-G
ARRG'T & DETAILS OF OUTER
REAR CASING (FURNACE SIDE)
G N
12 DWG 47-
360-665-3
Economizer Assembly & Sections L N
13 DWG D-675-
119-F
ARRG'T & DETAILS OF SIDEWALL
CASING
F N
14 DWG D-675-
127-D
STEEL DETAILS SUPHTR FLOOR
PART 7001
D N
15 DWG D-675-
132-D
ARRANGMENT & DETAILS OF
FRONT OUTER ENCLOSURE
FURNACE SIDE PART 7003
D N
16 DWG D-675-
136-A
ARRANGEMENT & DETAILS OF
BOILER SIDE WALL ENCLOSURE
TUBE BANK SIDE
A N
17 DWG 204-
2492046
F.D Blower Ducts - DETS C N
18 DWG 47-
360-665-20
ARRANGEMENT OF UPPER
DRUM INTERNALS
H N
19 DWG M-665-
DETAILS OF DESUPERHEATER D N
20 PDD
DBFA/0358/
012918
DIAGRAM FOR BOILER FROMT
ARRANGEMENT
- N
21 DWG D-
42100
Assembly of Model "D-20" Fuel Oil Burner W/NAV - Jet Atomizer
C N
22 DWG D-
42101
List of Material Model "D-20" Fuel Oil Burner
- N
23 DWG 208-
2492083
Feed SUCT, DISCH & TRANS Piping SIAG
D N
24 DWG 208-
2492086
Feed SUCT & DISCH & TRANS Piping -Plan
H Y AL
L
25 DWG 208-
2492087
AGC19 Feed Suction & Discharge & Transfers Piping - ELEV
J N
26 DWG 208-
2492088
Feed SUCT & DISCH & TRANS Piping - SECT
H Y AL
L
27 DWG 514-
2492539
S.W. CONTAM & MACHY DRAINS
ARR & L/M
E N
28 DWG
138078-25-
Economizer Replacement Arrangement
D N
29 DWG 207-
2492073
Main Steam Piping DIAG B N
30 DWG 207-
2492074
MAIN STEAM PIPING - PLAN E Y AL
L
31 DWG 207-
2492075
Main Steam Piping -ELEV E N
32 DWG 207-
2492076
Main Steam Piping - SECT E Y AL L
33 DWG 207-
6577116
S/A 1485D LCC 19 1B BLR MN
STM DR & BACKFILL PP, MOD OF
D N
34 DWG M-665-
MAIN BOILER 50" I.D. UPPER
DRUM DETAIL AND NOZZLE
ARRANGEMENT
E N
35 DWG 514-
2492515
Steam Drain COLLECT. SYS -DIAG C N
36 DWG 514-
2492508
600LB HP. AUX Steam DIAG B N
37 DWG 514-
2492517
600LB H.P AUX STM-PLAN D Y AL
L
38 DWG 514-
2492518
600LB H.P AUX STM-ELEV D N
39 DWG 514-
2492519
600LB H.P. AUX STM-SECT D Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 2/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
40 DWG 514-
5594455
Boiler Blow Piping Diagram ARR - N
41 DWG 514-
5594452
BLR BLOW PIPING
INSTALLATION
A Y AL
L
42 DWG 208-
6575661
Sample Cooler Piping for Boiler Water Modification of
- N
43 DWG 206-
2492064
Feed Control Piping ARR & L/M A N
44 DWG 514-
2492509
150 LB AUX Steam DIAG D N
45 DWG 514-
2492521
150LB AUX Steam-Plan F N
46 DWG 514-
2492522
150LB AUX Steam-ELEV F N
47 DWG 514-
2492523
150LB AUX Steam-SECT F N
48 DWG 200-
2492005
Soot Blower Piping ARR D Y AL L
49 DWG 200-
2492007
Soot Blower Piping Drain Reservoir A N
50 DWG 210-
2492121
FO SERV SUCT & DISCH Piping
DIAG
E N
51 DWG 210-
2492122
F.O SERV. DISCH. Piping - ARR G N
52 DWG 514-
5594459
MPNEL BOILER BOTTOM BLOW
OVBD DISH CONN
- Y AL
L
53 DWG 545-
2492747
Pipe Hangers & Sway Braces STD
DETS 425 DEG F & ABV
J Y AL
L
54 DWG 208-
2492101
Pipe Supports Feed DISCH B Y AL L
55 DWG 514-
2492553
Pipe Supports - H.P. AUX Steam D Y AL L
56 DWG 200-
2492008
Pipe Supports - Soot Blower Piping B Y AL L
57 DWG 207-
2492078
Pipe Supports -Main Steam C Y AL L
58 DWG 804-
1385781
Hangers, Pipe for Surface Ships E Y AL L
59 DWG 810-
4714432
STD Pipe Hangers Fabrication
DETS & INSTL
K Y AL
L
60 PDD 200-
ELM-190128
PIPE SUPPORT FOR 1B BLR
BOTTOM BLOW PIPING,
RELOCATION OF
- Y AL
L
61 DWG D-675-
ARRANGEMENT OF
SUPERHEATER FLOOR PART #
C N
62 DWG D-675-
MAIN BOILER CASING SECTIONS C N
63 PDD 200-
ELM-200420
STD FAB FOR STUFFING BOX
ASSY OF BOTTOM BLOW &
SPRHTR HEADER DR PP
- Y AL
L
64 TM 29 CFR
PART
1915.71
Scaffolding or Staging - N
65 DWG 205-
2492051
Uptakes, Upper, Lower, DK CONNS, FDB DISCH Ducts, Trash Burner Uptake - ARR
C N
66 DWG 205-
2492052
UPTAKES LWR DETS L/M C N
67 DWG 205-
2492054
UPTAKES, UPPPER-DETS, L/M B N
68 DWG 205-
2492055
UPTAKES, UPPER-DET, L/M B N
FOUO
SHIP: LCC-19 CHG/VER: 2/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
69 DWG 205-
2492056
UPTAKES, UPPER-DETS, L/M C N
70 DWG 205-
2492058
Uptakes - Dk Conns - Dets, L/M B N
71 PDD 200-
ELM-100625
1A/1B BOILER CASING METAL
INSULATION SUPPORT, INSTL
OF
- Y AL
L
72 PDD 200-
ELM-190627
1A & 1B BLR OUTER CASING
ROOF INSULATION,
INSTALLATION OF
- Y AL
L
73 PDD 200-
ELM-210026
1A & 1B BLR OUTER CASING
INSULATION, REPLACEMENT OF
A Y AL
L
74 DWG 200-
2500405
BOILER OUTER CASING
INSULATION & LAGGING
- Y AL
L
75 DWG X-
99519
DN-4 Soot Blower Views C Y AL L
76 DWG X-
74223
BASIC HEAD ASSEMBLY FOR
ND-4 & ND-4A
V Y AL
L
77 MRC 43
A7PY N
Soot Blower Head Assembly - Y AL L
78 DWG X-
99520
SOOT BLOWER INSTALLATION C N
79 PDD 200-
ELM-200419
SUBST MATLS FOR SOOT
BLOWER PEN, STDZN OF
- Y AL
L
80 DWG 200-
4692826
LCC-19 Class-Main Boilers, Refractory Arrangement and Detail
D Y AL
L
81 PDD 200-
ELM-180259
WORK PROCEDURE FOR
APPLICATION OF CERAMIC
FIBER INTO 1A & 1B BOILERS,
PROVIDE OF
- Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove each access plate of the boiler listed in 1.3.1 including smoke pipe for 5 year inspection, using 2.3 through 2.17 for guidance.
5.1.1 Match-mark and install identification tags to each removed access plate.
5.1.2 Retain and store the removed each access plate at an appropriate location until reinstallation to prevent damage.
5.2 Fabricate and install each temporary access cover listed in 1.3.1.1 for the boiler listed 1.3.1, using 2.4 through
2.17 for guidance.
5.2.1 Template exact size, configuration, and dimension from each existing shipboard condition.
FOUO
SHIP: LCC-19 CHG/VER: 2/2
5.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column C, Lines One through 7 for hand grab.
5.3 Remove each handhole plate from each rear wall header, screen wall Header, Side wall Header, Superheater Inlet and Outlet Header of the boiler listed in 1.3.1, using 2.3 and 2.4 and for guidance.
5.3.1 Match-mark and install identification tags to removed each handhole plate.
5.3.2 Retain and store the removed each handhole plate at an appropriate location until reinstallation to prevent damage.
5.3.3 Install Foreign Material Exclusion (FME) closure to each handhole.
5.4 Remove each internal parts from the steam drum of the boiler listed in 1.3.1, using 2.3, 2.18 and 2.19 for guidance.
5.4.1 Install FME closure to each tube and downcomer opening prior to beginning internal removed work.
5.4.2 Match-mark and install identification tags to removed each internal parts.
5.4.3 Retain and store the removed each internal parts at an appropriate location until reinstallation to prevent damage.
5.4.4 Retain and store the removed desuperheater at an appropriate location until reinstallation in wooden box to prevent damage.
5.5 Remove each valve listed in 1.3.1.42 through 1.3.1.44, using 2.20 and 2.47 for guidance.
5.6 Remove each air register of the boiler listed in 1.3.1, using 2.3, 2.21, 2.22, 2.50 and 2.51 for guidance.
5.6.1 Match-mark and install identification tags to removed each air register.
5.6.2 Retain and store the removed each air register at an appropriate location until reinstallation to prevent damage.
5.7 Remove each existing insulation, lagging and reusable cover listed in 1.3.2 from each piping and machinery equipment.
5.8 Remove existing castable refractory and clean front wall and each furnace side, using 2.80 and paragraph 221-
2.14 of 2.3 for guidance.
5.8.1 Contact C106R for disposal of known/suspected radiation substance waste.
5.8.1.1 Ensure radiation substance waste is not mixed with other hazardous/industrial waste.
5.8.1.2 Properly segregate, package, and label all known/suspected radiation substance waste.
5.8.1.3 Accumulate radiation substance waste in compatible 55 gallon drums. 55 gallon drums must be prepared by the contractor and the government must not return the drums after disposal.
5.8.1.4 Contact C106R to request coordination of disposal of accumulated radiation substance waste.
5.8.2 Ensure existing condition after completed mechanical cleaning.
5.9 Remove existing fiberfrax and clean debris from each superheater tube penetration.
FOUO
SHIP: LCC-19 CHG/VER: 2/2
5.9.1 Ensure existing condition after completed mechanical cleaning.
5.10 Remove each stuffing box listed in 1.3.1.19 and 1.3.1.20, using 2.8, 2.15, 2.35, 2.41, 2.61 through 2.63 for guidance.
5.11 Remove each existing variable spring hanger, sway brace, plain hanger and other hanger listed in 1.3.1.21 through 1.3.1.31 for accomplishment of UT inspection, using 2.24, 2.26, 2.30, 2.32, 2.37, 2.39, 2.41, 2.48, 2.53 through 2.60 for guidance.
5.11.1 Deliver and pick up to/from SRF-JRMC Code 135 for calibration of each spring hanger listed in 1.3.1.21,
1.3.1.23 and 1.3.1.25.
5.11.2 Retain the removed each pipe hanger for reinstallation.
5.12 Remove each overboard discharge valve listed in 1.3.1.33, using 2.41 for guidance.
5.13 Remove each existing 1B boiler bottom blow overboard discharge inner sleeve assembly listed in 1.3.1.32 for the ISEA/SGPI Inspection, using 2.52 for guidance.
5.14 Remove each soot blower head listed in 1.3.34 through 1.3.41 prior to removal of stationary soot blower head, document existing orifice adjustment position for restoration, using 2.48, 2.75 and 2.76 for guidance.
5.14.1 Remove each soot blower element of each soot blower head listed in 1.3.34 through 1.3.41 for ISEA/SGPI inspection, using 2.75 and 2.78 and 2.79 for guidance.
5.14.2 Match-mark and install identification tags to removed each soot blower head.
5.14.3 Deliver and pick up to/from SRF-JRMC Code 135 for UT inspection of each soot blower head listed in 1.3.34 through 1.3.39.
5.15 Erect/hang scaffolding listed in 1.3.6 in accordance with 2.64.
5.15.1 Remove scaffolding listed in 1.3.6 in accordance with 2.64 when requested by Code 281 via Code 333.
5.16 Accomplish cleaning work for each smoke pipe listed in 1.3.7, using 2.5, 2.65 through 2.70 for guidance.
5.17 Accomplish the requirements of 009-32 of 2.1, including Table 5, Line(s) 7, for each piping listed in 1.3.1.2 through 1.3.1.18.
5.18 Accomplish mechanical and wire brush clean to bare metal for each area listed in 1.3.1.32, 1.3.1.45 through 1.3.1.47.
5.19 Accomplish the requirements of 009-32 of 2.1, including Table 5, Line(s) 6, for each area listed in 1.3.1.2 through 1.3.1.9, 1.3.1.11 through 1.3.1.16 and 1.3.1.47 and 1.3.1.48.
5.19.1 Remove existing coating on each sliding feet chock faces to bare metal if its painted. Do not paint each chock faces.
5.20 Reinstall each 1B boiler bottom blow overboard discharge inner sleeve assembly listed in 1.3.1.32 after completion of the ISEA/SGPI Inspection, using 2.52 for guidance.
5.21 Install overboard discharge valve listed in 1.3.1.33, using 2.41 for guidance.
5.21.1 Remove existing and install new each piping joint gasket and fastener. Gasket must conform to MIL-G-24716.
Stud must conform to MIL-DTL-1222, continuous thread stud type IV, Grade 500, QQ-N-286, nickel-copper
FOUO
SHIP: LCC-19 CHG/VER: 2/2
aluminum (K-Monel). Self-locking nut must conform to NASM17828, Grade 400 or 405, QQ-N-281, nickel-copper alloy.
5.21.2 Cycle the valve from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) “VALVE CYCLING”
5.22 Install each soot blower head listed in 1.3.34 through 1.3.41, using 2.48, 2.75 and 2.76 for guidance.
5.22.1 Lubricate each rotary soot blower head in accordance with 2.77.
5.22.2 Remove existing and install new each gasket (PC No. 29) and snap ring (PC No. 33) conforming to specifications in 2.76.
5.22.3 Remove existing and install new each piping joint gasket and fastener. Gasket must conform to MIL-G-24716.
Stud must conform to MIL-DTL-1222 Grade B16, alloy steel. Nut must conform to MIL-DTL-1222, Grade 4 or 7, alloy steel.
5.22.4 Manually rotate each rotating element of each rotary soot blower head for ease of operation and proper alignment. Binding or rubbing is not allowed.
5.22.5 Cycle the valve from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) “VALVE CYCLING”
5.22.6 Install each soot blower element of each soot blower head listed in 1.3.34 through 1.3.41 in accordance with 2.75, 2.78 and 2.79 for guidance.
5.22.7 Remove existing and install each new gasket. Material must conform to each specification in material list of 2.79.
5.22.8 Install protection cover to each soot blower head listed in 1.3.34 through 1.3.41 after installation work is completed to prevent damage. See 5.34.6.
5.23 Install each handhole plate to the boiler listed in 1.3.1 in accordance with 2.3, using 2.4 and for guidance.
5.23.1 Remove existing and install each new gasket. Material must conform to MIL-G-15342.
5.23.2 Apply anti-galling compound conforming to A-A-59004 for thread of each fastener.
5.24 Install each internal parts of the steam drum to the boiler listed in 1.3.1 in accordance with 2.3 and 2.18 and 2.19.
5.24.1 Remove existing and install each new gasket of the desuperheater. Material must conform to each specification in material list of 2.19.
5.25 Install each air register of the boiler listed in 1.3.1 in accordance with 2.3, 2.21, 2.22, 2.50 and 2.51.
5.25.1 Adjust all air door assembly and operating ring assembly. Wide Open position from stud to the edge of the door must be 2.500 inches with a tolerance of plus and minus 0.500 inches.
5.25.2 Remove existing and install each new gasket of each air register. Material must conform to each specification in material list of 2.22.
5.25.3 Remove existing and install each new gasket of the burner lead connection. Material must conform to MIL-G- 24716.
FOUO
SHIP: LCC-19 CHG/VER: 2/2
5.26 Install each valve listed in 1.3.1.42 through 1.3.1.44, using 2.20 and 2.47 for guidance.
5.26.1 Remove existing and install new each piping joint gasket. Gasket must conform to MIL-G-24716.
5.26.2 Cycle the valve from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) “VALVE CYCLING”
5.27 Install each stuffing box listed in 1.3.1.19 and 1.3.1.20, using 2.8, 2.15, 2.35, 2.41, 2.61 through 2.63 for guidance.
5.27.1 Remove existing and install each new gasket. Material must conform to each specification in material list of 2.63.
5.28 Install each variable spring hanger, sway brace, plain hanger and other hanger listed in 1.3.1.21 through
1.3.1.31 after completion of the UT inspection and repair work, using 2.24, 2.26, 2.30, 2.32, 2.37, 2.39, 2.41, 2.48,
2.53 through 2.60 guidance.
5.28.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.29 Install new castable refractory listed in 1.3.1 and 1.3.2 to each furnace side and front wall, using 2.80 and paragraph 221-2.14 of 2.3 for guidance.
5.30 Install each access plate of the boiler listed in 1.3.1 including smoke pipe in accordance with 2.3 through 2.17.
5.30.1 Remove existing and install each new gasket of access plate. Material must conform to each specification in Table 221-A-1 of 2.3.
5.30.2 Remove existing and install each new gasket of smoke pipe. Material must conform to HH-P-31.
5.30.3 Remove existing and install each new gasket of economizer inlet/outlet header blank flange. Material must conform to MIL-P-24503.
5.31 Accomplish the requirements of 009-11 of 2.1 for each piping and machinery equipment listed in 1.3.2 in accordance with 2.71 through 2.73 and Enclosure-01, using 2.74 for guidance.
5.31.1 Apply two(2) coats of epoxy resin (5066A) to the new lagging listed in 1.3.2.28 and 1.3.2.29 on the piping before painting.
5.31.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.32 Install new fiberfrax listed in 1.3.2 to each superheater tube penetration in accordance with 2.81 and Enclosure- 02, using 2.80 and paragraph 221-2.14 of 2.3 for guidance.
5.32.1 Installation of fiberfrax will commence 14 days prior to light off of the boiler.
5.32.2 Ensure fiberfrax associated installation process. Record date and time for installation.
5.33 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.34 Notes;
5.34.1 Planner: Code 234 M. EGUCHI, 243-0978
Planner: Code 234 H. ITO, 080-9350-4534 Planner: Code 231 M. MAEDA, 243-6101
FOUO
SHIP: LCC-19 CHG/VER: 2/2
Planner: Code 232 A. OZAWA, 243-2493 Planner: Code 234 M. HOSODA, 243-4572
5.34.2 Work Integration Manager (WIM) Code 333 T. YAGINUMA, 080-5419-0598
5.34.3 1B boiler 5 year inspection will be accomplished by Steam Generating Plant Inspector (SGPI), SRF-JRMC Code 281) and Ultrasonic Testing (UT) will be accomplished by SRF-JRMC Code 135.
5.34.4 Insulation and lagging required for rip-out section /area will be marked by SRF-JRMC Code 281.
5.34.5 Area of preparation including cut/removal air casing section for Ultrasonic Testing (UT) will be marked/specified by SRF-JRMC Code 135.
5.34.6 Installed protection covers of each soot blower head will be removed by Ship’s Force after all work are completed.
5.34.7 New insulation and lagging should be installed after completion of inspection /repair work by SRF-JRMC.
5.34.8 Provision of oily/chemical water barge will be coordinated by Project Team.
5.34.9 Calibration of variable spring hangers listed in 1.3.3.19, 1.3.3.21 and 1.3.3.23 will be covered by TGI No.
3819P22102C01 (SRF-JRMC TGI).
5.34.10 Opening, initial cleaning, and closing for Void (9-82-4-V) will be covered by TGI No. 3819P12359A01(FORM
OUT TGI).
5.34.11 New castable refractory must be installed after completion of inspection and repair work.
5.34.12 Ship’s Force will check and log boiler lay-up condition daily entry IAW attached NSTM CH-220 V2.
5.34.13 Ship’s Force will conduct final closing water flushing and closing inspection.
5.34.14 Ship’s Force will prepare and conduct final 100% hydrostatic test and place post hydro-test CARBO wet lay-up.
5.34.15 JCNs EM01-ZAG0, EM01-ZAG2, EM01-ZAG5, EM01-ZAG8, EM01-ZAH1, EM01-ZAH2, EM01-ZAH4, EM01-ZAH5, EM01-ZAH7, EM01-ZAH9, EM01-ZAI2, EM01-ZAI6 and EM01-ZAK4 are related to this TGI.
5.35 Government Furnished Material (GFM):
5.35.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.36 SRF-JRMC will provide the following service work: (TGI No. 3819P22102S02)
5.36.1 [C740] Crane and crane rigging service.
5.36.2 [X99E] Utility service, electrical.
5.36.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.36.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.36.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.36.6 [C133] QA inspection for (G) Symbol(s) and review coating application data.
FOUO
SHIP: LCC-19 CHG/VER: 2/2
5.36.7 [C135] Provide technical assistance for contractor work.
5.36.8 [C281] Provide technical assistance for contractor work
FOUO
J-1
SHIP: LCC-19 CHG/VER: 2/2
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1B BLR 5YR INSP PREP AY A 0 2
CU PHASE TITLE:
*F/O - ACCOMPLISH 1B BOILER 5 YEAR INSPECTION SUPPORT
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
1B BOILER IN MN STM 8-76-0-E IN#1B BLR WTR SAMP CLR IN HPD 8-76-0-E IN AUX STM 8-76-
0-E IN MN FEED PP 1B BOILER IN 1B BOILER BO 1B BLR SMOKE PIPE UT 1B BLR R/W
SW BB PPG PP 1B BLR R/W WD BB PPG PP 1B BLR S/C FR BB PPG PP 1B BLR S/C RR BB PPG PP
1B BLR S/W FR BB PPG PP 1B BLR S/W RR BB PPG PP 1B BLR W/D B/B PPG PP 1B BLR #1 FO
BNR LD PP 1B BLR #2 FO BNR LD PP 1B BLR #3 FO BNR LD PP 1B BLR SB PIPING PP 1B
BLR STM SMOTH PP PP 1B BLR STM ATMG PP PP 1B BLR DSUP SAMP CLR PP 1B BLR WD SAMPL
CLR PP 1B BLR CHEM INJ PPG PP 1B BLR XMTR SENSING PP 1B BLR HP DRN PPG PP MN
STM 8-76-0-E PP MN FEED PP 1B BOILER PP AUX STM 8-76-0-E PP MN STM PP 8-76-0-E HG
MN FEED 8-76-0-E HG AUX STM PP 8-76-0-E HG 1B BLR WD SAMPL CLR IN 1B BLR CHEM
INJ PPG IN 1B BLR DSUP SAMP CLR IN 1B BLR SB PIPING IN 1B BLR STM SMOTH PP IN 1B
BLR STM ATMG PP IN 1B SB-2 V- 1B SB-3 V- 1B SB-4 V- 1B SB-5
V- 1B SB-6 V- 1B SB-7 V- 1B SB-8 V- 1B SB-9 V- 1BB-E8
V- VOID 9-82-4-V VD
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P22102A01-Sketch-01.pdf) saved on 26-JUL-2024 0000.
2. ENCLOSURE-02 (3819P22102A01-Sketch-02.pdf) saved on 26-JUL-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P22102 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to provide support work for 1B boiler 5 year inspection.
Location of Work:
Fire Room (8-76-0-E) Oil Lab (5-83-1-Q) Blower Room (5-79-0-E) Uptake Space (5-76-0-Q) Void (9-82-4-V) Contractor Facility
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 BLRM HRs, RGRS HRs 22 KE PC
5.2 BLRM HRs, WELD HRs 22 KE PC
5.3 BLRM HRs 22 KE PC
5.4 BLRM HRs 22 KE PC
5.5 OMCH HRs 22 KE PC
5.6 BLRM HRs, RGRS HRs 22 KE PC
FOUO
J-2
SHIP: LCC-19 CHG/VER: 2/2
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.7 NSL HRs 22 KE PC
5.8 INSL HRs 22 KE PC
5.9 INSL HRs 22 KE PC
5.10 BLRM HRs 22 KE PC
5.11 PFTR HRs, PNTR HRs 22 KE PC
5.12 OMCH HRs, RGRS HRs 22 KE PC
5.13 PFTR HRs 22 KE PC
5.14 OMCH HRs, RGRS HRs, BLRM HRs 22 KE PC
5.15 RGRS HRs, INSL HRs 22 KE PC
5.16 PNTR HRs 22 KE PC
5.17 PNTR HRs, RGRS HRs, QA HRs 22 KE PC
5.18 PNTR HRs 22 KE PC
5.19 PNTR HRs, QA HRs 22 KE PC
5.20 PFTR HRs, BLRM HRs, WELD HRs, QA HRs 22 KE PC
5.21 OMCH HRs, RGRS HRs 22 KE PC
5.22 OMCH HRs, RGRS HRs, BLRM HRs, INSL HRs 22 KE PC
5.23 BLRM HRs 22 KE PC
5.24 BLRM HRs 22 KE PC
5.25 BLRM HRs, RGRS HRs 22 KE PC
5.26 OMCH HRs 22 KE PC
5.27 BLRM HRs, WELD HRs, QA HRs 22 KE PC
5.28 PFTR HRs, WELD HRs, QA HRs 22 KE PC
5.29 INSL HRs 22 KE PC
5.30 BLRM HRs, INSL HRs, RGRS HRs 22 KE PC
5.31 INSL HRs, WELD HRs, QA HRs 22 KE PC
5.32 INSL HRs 22 KE PC
5.33 PNTR HRs, QA HRs 22 KE PC
Lagging and Boiler Work CFM for asbestos sampler and analysis cost, plastic bag/sheet, enclosing/covering materials, hook, washer, tyvek suit, marine chemist fire watch cost, gas, welding rod, fastener, fire watch, Molykote P-37, HEPA filter, fire retardant ply wood, lumber, drum, and other consumable material (MISC).
22 MQ CS
Piping Work CFM for welding rod, electrode, gas, plastic sheet, covering material, tape, plastic bag, disposable coverall, saw blade, paint, thinner, fire watch cost, hanger liner and MISC such as other consumables.
22 MQ CS
Preservation Work CFM for all paints, thinner, lead sampling/ analysis cost, and MISC such as covering material and other consumable.
22 MQ CS
Process Funding Document 10 CT OM
Version-1: add CFM cost. C234 H. Harada, 12/25/2024, Y/Y/N. V-01
Version-2: modify reference no.20. C234 N. Izumi, 1/13/2025, Y/Y/N.
V-02
FOUO
J-3
SHIP: LCC-19 CHG/VER: 2/2
FOUO
M-1
SHIP: LCC-19 CHG/VER: 2/2
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1B BLR 5YR INSP PREP AY A 0 2
CU PHASE TITLE:
*F/O - ACCOMPLISH 1B BOILER 5 YEAR INSPECTION SUPPORT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
1 18L308 2 D-42101 -
3 S9221-AL-MMO-020
JOB ORDER: KEY OP:
3819P22102 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M SILICA PIPE COVER,, KEICAL
ACE SUPER SILICA, 1/2" X 1-
1/4"THK(30MM) X
2'LENGTH(610MM)..TOMBO,
35EA/BOX. **** EQUAL TO
INDUSTRIAL INSULATION
GROUP(DESIGNATED MFR BY
QPL-2781) MODEL# THERMO-
12 GOLD, BUT IT DOES NOT
HAVE 1/4"INCREMENTS
THICKNESS ****
ORIG:CODE 234 M.EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL4465715 NA 4 N 42117809 35/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 2/2
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
002 M SILICA PIPE COVER,, KEICAL
ACE SUPER SILICA, TOMBO,
SIZE: 3/4" X 1-1/4" THK (30MM)
X 2FT LENGTH (610MM),
30EA/BOX. *MUST BE
ORDERED IN MULTIPLES OF
30EA*
**** EQUAL TO INDUSTRIAL
INSULATION
GROUP(DESIGNATED MFR BY
QPL-2781) MODEL# THERMO-
1200 GOLD, BUT IT DOES NOT
HAVE 1/4"INCREMENTS
THICKNESS ****
ORIG:CODE 234 KM.
9Q 5640 LL4470572 NA 4 N 42117810 30/EA
003 M INSULATION SLEEVING,
SILICA PIPE COVER, 1/2"IPS X
1-1/2" THK X 3 FT LONG PER
EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 010420971 NA 4 N 42115032 40/EA
004 M INSULATION SLEEVING,
SILICA PIPE COVER, 3/4"IPS X
1-1/2"THK X 3 FT LONG PER
EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 010420970 NA 4 N 42115040 25/EA
005 M INSULATION SLEEVING,
SILICA PIPE COVER, 1"IPS X
1-1/2"THK X 3 FT LONG PER
EACH,
ORIG:CODE 234 KM. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 010420969 NA 4 N 42115121 8/EA
006 M SILICA PIPE COVER,, SILICA
PIPE COVER, NON ASBESTOS,
1-1/2"IPS X 2-1/2"THK X 3 FT
LONG PER EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL6995232 NA 4 N 42777502 27/EA
007 M INSULATION SLEEVING,
SILICA PIPE COVER, NON
ASBESTOS, 2"IPS X 3"THK X 3
FT LONG PER EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 002012615 NA 4 N 42115042 24/EA
008 M INSULATION SLEEVING,
SILICA PIPE COVER, NON
ASBESTOS, 4"IPS X 4-1/2" THK
X 3 FT LONG PER EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 001638039 NA 4 N 42115035 10/EA
FOUO
M-3
SHIP: LCC-19 CHG/VER: 2/2
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
009 M SILICA PIPE, SILICA PIPE
COVER, NON ASBESTOS,
5"IPS X 2"THK X 3 FT LONG
PER EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q FY25 LL6991568 NA 4 N 42777501 20/EA
010 M SILICA PIPE COVER,, SILICA
PIPE COVER, NON ASBESTOS,
5"IPS X 3"THK X 3 FT LONG
PER EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL6995270 NA 4 N 42777505 6/EA
011 M SILICA PIPE COVER,, SILICA
PIPE COVER, NON ASBESTOS,
12"IPS X 3"THK X 3 FT LONG
PER EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL6995308 NA 4 N 42777506 6/EA
012 M INSULATION SLEEVING,
SILICA PIPE COVER, 6"IPS X
5-1/2"THK X 3 FT LONG PER
EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 002012623 NA 4 N 42115036 15/EA
012 M INSULATION SLEEVING,
SILICA PIPE COVER, 6"IPS X
5-1/2"THK X 3 FT LONG PER
EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 002012623 NA 4 N 50065200 1/EA
013 M SILICA PIPE COVER,, 9" IPS X
6" THK X 3 FT LONG PER
EACH, NON ASBESTOS,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
REORDER FOR
DOC#42145055. 5640-00-166-
8334 CJ CANCEL.
AAC Y OBDOLETE ITEM
9Q 5640 LL9304780 NA 4 N 42777510 2/EA
013 M INSULATION SLEEVING,
SILICA PIPE COVER, 9"IPS X
6"THK X 3 FT LONG PER
EACH,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 001668334 NA 4 N 42145055 2/EA
014 M INSULATION SLEEVING,
SIL…
This is the start of the file's text. The full file is on GovTribe.