This document is a Task Group Instruction (TGI) for a radiographic test of welded joints on the USS Blue Ridge (LCC-19), specifically for the 1C Main Feed Pump Discharge piping system. The TGI details a technical inspection of two welded joints (PJ-1A and PJ-3A) located in the Fire Room, with work to be performed between January 12, 2026 and May 15, 2027. The radiographic testing (RT) will be conducted using specific procedures, including quality level checks, exposure techniques, and film evaluation criteria.

The document includes multiple technical forms and appendices providing granular details about the inspection, such as mapping plans, material lists, and quality assurance documentation. Key personnel involved include Shinichi Ito (Planner, Code 234), S. Hasegawa (Engineer, Code 260), and T. Yaginuma (Work Integration Manager, Code 333). SRF-JRMC will provide supporting services including crane rigging, utilities, safety inspections, and radiation safety officer (RSO) support. The overall purpose is to accomplish the radiographic test for supporting Task Group Instruction No. 3819P25502R01.

View the file

Other files

File Type Posted
EXHIBIT - Contract Data Requirements List (CDRL)_R2.pdf PDF
TGI_3819P25502_A01_c0v0_FY26.pdf PDF
TGI_3819P22102_A01_c0v0_FY26.pdf PDF
TGI_3819P22101_A01_c0v0_FY26.pdf PDF
TGI_3819P14207_A01_c1v2_FY26.pdf PDF
TGI_3819P14205A01_c2v2_FY26.pdf PDF
TGI_3819P14116A01_c0v0_FY26.pdf PDF
TGI_3819P14114A01_c0v0_FY26.pdf PDF
TGI_3819P14113A01_c0v0_FY26.pdf PDF
TGI_3819P13505A01_c0v0_FY26.pdf PDF
TGI_3819P13411A01_c1v1_FY26.pdf PDF
TGI_3819P13339A01_c0v0_FY26.pdf PDF
TGI_3819P12352A01_c1v0_FY26.pdf PDF
TGI_3819P12350A01_c0v0_FY26.pdf PDF
TGI_3819P12347_A01_c0v0_FY26.pdf PDF
TGI_3819P12346_A01_c0v0_FY26.pdf PDF
TGI_3819P12343A01_c1v1_FY26.pdf PDF
TGI_3819P12329A01_c1v1_FY26.pdf PDF
TGI_3819P12326_A01_c1v0_FY26.pdf PDF
TGI_3819P12325_A01_c0v01_FY26.pdf PDF
TGI_3819P12308A01_c0v0_FY26.pdf PDF
TGI_3819P12307A01_c0v0_FY26.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P23103_A03_c0v0.pdf PDF
TGI_3819P22102_T01_c0v0.pdf PDF
TGI_3819P14208T01_c0v0.pdf PDF
TGI_3819P14208A01_c1v1.pdf PDF
TGI_3819P14122A01_c0v0.pdf PDF
TGI_3819P14121A01_c0v0.pdf PDF
TGI_3819P13422A01_c0v0.pdf PDF
TGI_3819P13411A01_c1v1.pdf PDF
TGI_3819P12351A01_c0v0.pdf PDF
TGI_3819P12350A01_c0v0.pdf PDF
TGI_3819P12347_A01_c0v0.pdf PDF
TGI_3819P12345_A01_c1v3.pdf PDF
TGI_3819P12332A01_c1v1.pdf PDF
TGI_3819P12327_A01_c1v1.pdf PDF
TGI_3819P12324_A01_c2v1.pdf PDF
TGI_3819P12313A01_c0v0.pdf PDF
2.01 N6264925RA024.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
TGI_3819P26201A01_c0v0.pdf PDF
TGI_3819P25604A01_c1v1.pdf PDF
TGI_3819P22102_T08_c0v0.pdf PDF
TGI_3819P22102_T06_c0v0.pdf PDF
TGI_3819P22102_T02_c0v0.pdf PDF
TGI_3819P22101_T08_c0v0.pdf PDF
TGI_3819P22101A01_c2v2.pdf PDF
TGI_3819P14207_T01_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: 1C MFP DISCH PPG AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE:

*F/O - ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI No. 3819P25502R01

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

SHINICHI ITO 234. 315-243-4297 28-JUN-2024

APPROVED BY: CODE PHONE DATE

HIDEKUNI SHINMEI 234. 315-243-2371 28-JUN-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: 1C MFP DISCH PPG AY A 0

FOUO

SHIP: LCC-19 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-3 QA J20A

(1-2)

J-1 M-1 Map (1)

1. SCOPE/PURPOSE

1.1 Title: Onboard Radiographic Test (RT) Inspection of Piping Welded Joint; accomplish

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (2 EA), Welded Joint, Piping

System: 1C Main Feed Pump Discharge Size: 5 Inch IPS Material: Carbon Steel Joint Design: Butt Weld, P-3 Joint ID: PJ-1A and PJ-3A of TGI No. 3819P25502R01 Piping Class: P-1 Remarks: See Mapping Plan Enclosure-01 for detail

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

1/12/2026

5/15/2027

FOUO

SHIP: LCC-19 CHG/VER: 0/0

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirement of 009-112 of 2.1.

5.2 Accomplish the requirement of 009-12 of 2.1, including Table One, Column A, Line 11 for radiographic inspection (RT) of each welded joint listed in 1.3.1, using Enclosure-01 for guidance.

5.2.1 Accomplish the requirement of 009-09 of 2.1.

5.2.2 Obtain each copy of QA Form 20 Enclosure-02-1 and Enclosure-02-2 of TGI No. 3819P25502R01 for verification of joint ID PJ-1A and PJ-3A. See 5.3.4.

5.2.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form J20A Enclosure-02-1 and Enclosure-02-2.

5.3 Notes:

5.3.1 Planner: Code 234 S. Ito, 243-4297

Engineer: Code 260 S. Hasegawa, 243-8722

5.3.2 Work Integration Manager (WIM) Code 333 T. Yaginuma, 080-5419-0598

5.3.3 Welding of the joints has been accomplished by SRF-JRMC in accordance with TGI No.

3819P25502R01 for joint ID PJ-1A and PJ-3A.

5.3.4 SRF-JRMC WIM will provide a copy of QA Form 20 when requested by Contractor.

5.3.5 JCNs EM02-L166 and EM02-L167 are related to this TGI.

5.4 Government Furnished Material (GFM): None.

5.5 SRF-JRMC will provide the following service work: (TGI No. 3819P25502S03)

5.5.1 [C740] Crane and crane rigging service.

5.5.2 [X99E] Utilities service.

5.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

5.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.5.6 [C135] QA inspection for (G)Symbol inspection.

5.5.7 [C106R] RSO and ARSO service for RT.

FOUO

J-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

1C MFP DISCH PPG AY A 0 0

CU PHASE TITLE:

*F/O - ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI No. 3819P25502R01

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

MN FEED PP 1C MFP PP 1C MFP DISCH CHK V- #8 1C FDWTR MFP DSCH V-

ATTACHMENT LIST:

1. ENCLOSURE-01 (3819P25502A01-Map.pdf) saved on 25-JUN-2024 0000.

2. ENCLOSURE-02 (3819P25502A01-QAJ20A.docx) saved on 25-JUN-2024 0000.

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

3819P25502 A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to accomplish the RT inspection of 1C main feed pump discharge piping welded joints for supporting of TGI No. 3819P25502R01.

Location of Work:

Fire Room (8-76-0-E)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 22 KE PC

5.2 QA HRs 22 KE PC

CFM (radiographic test of 2 welded joints on 1C main feed pump discharge piping)

22 MQ CS

Process Funding Document. 10 CT OM

FOUO

M-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

1C MFP DISCH PPG AY A 0 0

CU PHASE TITLE:

*F/O - ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI No. 3819P25502R01

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

3819P25502 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 1C MFP DISCH PPG AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

3819P25502 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 1C MFP DISCH PPG AY A 0

Shinji.Hasegawa.ja Text Box 3819P25502A01

3819P25502A01 ENCLOSURE-02-1 TOTAL 2

REPORT OF RT OPERATIONS AND EVALUATION PAGE _1 OF 2

QA FORM J20A (FRONT)

2. SHIP AND HULL NO.:

USS Blue Ridge (LCC-19)

3. JOB ORDER/KEY OP.:

3819P25502A01

4. CU PHASE TITLE:

F/O – ACCOMPLISH THE REDIOGRAPHIC TEST FOR TGI

No. 3819P25502R01

5. RT PERFORMED BY: 6. SPECIMEN MATERIAL:

[] CSTL [] CRES [] CUNI [] AL [] OTHER:

7. TM: 8. TS: 9. JOINT ID

PJ-1A

10. WELD TYPE:

[] Butt [] W/backing [] Backing removed [] Con insert [] Other:

11. REPAIR NO.

[] Orig. [] R-

12. INSPECTION PROCEDURE(S):

13. ACCEPTANCE STANDARD

[] MIL-STD 2035 [] MIL-STD 1689 [] Other: [] Class 1 [] Class 2 [] Class 3

14. PENETRAMETER:

SIZE: GROUP: []02 []1 []4 []Other:

15. PENETRAMETER PLACEMENT

[] Source side [] Film Side [] On/off [] Separate block

16. PENETRAMETER TYPE:

[] MIL-Type [] ASTM-Type

17. QUALITY LEVEL

[] 2-2T [] 2-4T []Other:

18. RT COVERAGE REQUIRED:

[] 60 DEG [] 360 DEG [] 100% [] Other:

19. EXPOSURE TECHNIQUE:

[] SWE/SWV [] DWE/SWV [] DWE/DWV [] O [] S

20. FILM TYPE: [] Fuji IX-80 [] Fuji IX-100 [] Other:

21. FILM LOAD

[] Single [] Double [] Other:

22. INTENSIFYING SCREENS:

[] Pb Oxide [] Pb Foil

23. FRONT FILTER Tm:

[] N/A

24. BACK FILTER Tm:

25. RADIATION SOURCE:

[] X-ray [] Ir-192 [] Se-75 [] Co 60

26. VOLTAGE / CURIES: 27. FSS / SOURCE DIM.: 28. SFD:

Min: Act:

29. BEAM ANGLE:

30. SHIM MATERIAL: []N/A

GROUP: []02 []1 []4 []Other:

31. SHIM THICKNESS: []N/A 32. FILM ID: []N/A 33. MASKING

[] Used [] Not Used

34. RADIOGRAPHIC SHOOTING SKETCH

Depict the following: (1) Direction of radiation (2) Placement of penetrameter (3) Location of location marker (4) Location of shims (if used)

(5) Location of Pb "B" (6) Location & thickness of back filter (7) Location of film (8) Blocking/masking technique used (if applicable)

STANDARD

SET-UPS

[ ] TECH 1

SWE/SWV

[ ] TECH 2

DWE/SWV

[ ] TECH 3

DWE/DWV (O)

[ ] TECH 4

DWE/DWV (S)

NOTE: REFERENCE TO A STANDARD SETUP IS ACCEPTABLE

35. REMARKS:

36. RADIOGRAPHER DATE (DATE OF EXPOSURE): 37. REPORT NUMBER:

3819P25502A01 ENCLOSURE-02-1 TOTAL 2

REPORT OF RT OPERATIONS AND EVALUATION PAGE 2 OF 2

QA FORM J20A (BACK)

38. RADIOGRAPHIC INTERPRETATION OF JOINT NO.: 39. REMARKS AND INDICATION

DETAILS:

(a) LOCATION MARKERS (INCREMENTS)

(b) PENETRAMETER PLACEMENT

(c) REQ. T-HOLE VISIBLE

(d) DENSITY (PENE AND AOI)

(e) BACKSCATTER CONTROL (LEAD “B’)

(1) CRACK

(2) SLAG/OXIDE

(3) POROSITY

(4) LACK OF PENETRATION

(5) LACK OF FUSION

(6) MELT THROUGH

(7) BURN THROUGH

(8) ROOT OXIDATION

(9) CRATER PIT

(10) TUNGSTEN INCLUSION

(11) ROOT SURFACE CONCAVITY

(12) ROOT SURFACE CONVEXITY

(13) UNDERCUT

(14) ROOT CENTER LINE CREASE

(15) INCOMPLETE INSERT MELT

(16) QUESTIONABLE DISCONTINUITY

(17) FILM ARTIFACTS

(18) BASE METAL INDICATIONS

(19) INADVERTENT RADIOGRAPHY

(20)

(21)

(22)

40. INTERPRETATION KEY:

(1) Blocks left blank – condition is NOT present on the film

(2) Blocks marked O – condition is present on the film and is acceptable.

(3) Blocks marked X – condition is present on the film and rejectable.

(4) Blocks marked with prepared notes (①,②, etc.) – condition present and see applicable note(s).

41. PREPARED NOTES

① Visually verified as an acceptable surface condition.

② Engineering evaluation required/requested via CFR.

③ Artifacts (Crimp or pressure marks, processing marks, finger prints, streaks, etc.) present on film and do not interfere with interpretation.

④ Film superimposed for interpretation, evaluation.

⑤

⑥

42. REMARKS

43. CONDITION FOUND REPORTS (CFR) NUMBER(s) SUBMITTED: []N/A

44. FINAL DISPOSITION

[ ] ACCEPT [ ] REJECT

45. RT INSPECTOR DATE 46. REPORT NUMBER:

THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY HIS/HER SIGNATURE THAT THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED REQUIREMENTS.

3819P25502A01 ENCLOSURE-02-2 TOTAL 2

REPORT OF RT OPERATIONS AND EVALUATION PAGE 1 OF 2

QA FORM J20A (FRONT)

2. SHIP AND HULL NO.:

USS Blue Ridge (LCC-19)

3. JOB ORDER/KEY OP.:

3819P25502A01

4. CU PHASE TITLE:

F/O – ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI

No. 3819P25502R01

5. RT PERFORMED BY: 6. SPECIMEN MATERIAL:

[] CSTL [] CRES [] CUNI [] AL [] OTHER:

7. TM: 8. TS: 9. JOINT ID

PJ-3A

10. WELD TYPE:

[] Butt [] W/backing [] Backing removed [] Con insert [] Other:

11. REPAIR NO.

[] Orig. [] R-

12. INSPECTION PROCEDURE(S):

13. ACCEPTANCE STANDARD

[] MIL-STD 2035 [] MIL-STD 1689 [] Other: [] Class 1 [] Class 2 [] Class 3

14. PENETRAMETER:

SIZE: GROUP: []02 []1 []4 []Other:

15. PENETRAMETER PLACEMENT

[] Source side [] Film Side [] On/off [] Separate block

16. PENETRAMETER TYPE:

[] MIL-Type [] ASTM-Type

17. QUALITY LEVEL

[] 2-2T [] 2-4T []Other:

18. RT COVERAGE REQUIRED:

[] 60 DEG [] 360 DEG [] 100% [] Other:

19. EXPOSURE TECHNIQUE:

[] SWE/SWV [] DWE/SWV [] DWE/DWV [] O [] S

20. FILM TYPE: [] Fuji IX-80 [] Fuji IX-100 [] Other:

21. FILM LOAD

[] Single [] Double [] Other:

22. INTENSIFYING SCREENS:

[] Pb Oxide [] Pb Foil

23. FRONT FILTER Tm:

[] N/A

24. BACK FILTER Tm:

25. RADIATION SOURCE:

[] X-ray [] Ir-192 [] Se-75 [] Co 60

26. VOLTAGE / CURIES: 27. FSS / SOURCE DIM.: 28. SFD:

Min: Act:

29. BEAM ANGLE:

30. SHIM MATERIAL: []N/A

GROUP: []02 []1 []4 []Other:

31. SHIM THICKNESS: []N/A 32. FILM ID: []N/A 33. MASKING

[] Used [] Not Used

34. RADIOGRAPHIC SHOOTING SKETCH

Depict the following: (1) Direction of radiation (2) Placement of penetrameter (3) Location of location marker (4) Location of shims (if used)

(5) Location of Pb "B" (6) Location & thickness of back filter (7) Location of film (8) Blocking/masking technique used (if applicable)

STANDARD

SET-UPS

[ ] TECH 1

SWE/SWV

[ ] TECH 2

DWE/SWV

[ ] TECH 3

DWE/DWV (O)

[ ] TECH 4

DWE/DWV (S)

NOTE: REFERENCE TO A STANDARD SETUP IS ACCEPTABLE

35. REMARKS:

36. RADIOGRAPHER DATE (DATE OF EXPOSURE): 37. REPORT NUMBER:

3819P25502A01 ENCLOSURE-02-2 TOTAL 2

REPORT OF RT OPERATIONS AND EVALUATION PAGE 2 OF 2

QA FORM J20A (BACK)

38. RADIOGRAPHIC INTERPRETATION OF JOINT NO.: 39. REMARKS AND INDICATION

DETAILS:

(a) LOCATION MARKERS (INCREMENTS)

(b) PENETRAMETER PLACEMENT

(c) REQ. T-HOLE VISIBLE

(d) DENSITY (PENE AND AOI)

(e) BACKSCATTER CONTROL (LEAD “B’)

(1) CRACK

(2) SLAG/OXIDE

(3) POROSITY

(4) LACK OF PENETRATION

(5) LACK OF FUSION

(6) MELT THROUGH

(7) BURN THROUGH

(8) ROOT OXIDATION

(9) CRATER PIT

(10) TUNGSTEN INCLUSION

(11) ROOT SURFACE CONCAVITY

(12) ROOT SURFACE CONVEXITY

(13) UNDERCUT

(14) ROOT CENTER LINE CREASE

(15) INCOMPLETE INSERT MELT

(16) QUESTIONABLE DISCONTINUITY

(17) FILM ARTIFACTS

(18) BASE METAL INDICATIONS

(19) INADVERTENT RADIOGRAPHY

(20)

(21)

(22)

40. INTERPRETATION KEY:

(1) Blocks left blank – condition is NOT present on the film

(2) Blocks marked O – condition is present on the film and is acceptable.

(3) Blocks marked X – condition is present on the film and rejectable.

(4) Blocks marked with prepared notes (①,②, etc.) – condition present and see applicable note(s).

41. PREPARED NOTES

① Visually verified as an acceptable surface condition.

② Engineering evaluation required/requested via CFR.

③ Artifacts (Crimp or pressure marks, processing marks, finger prints, streaks, etc.) present on film and do not interfere with interpretation.

④ Film superimposed for interpretation, evaluation.

⑤

⑥

42. REMARKS

43. CONDITION FOUND REPORTS (CFR) NUMBER(s) SUBMITTED: []N/A

44. FINAL DISPOSITION

[ ] ACCEPT [ ] REJECT

45. RT INSPECTOR DATE 46. REPORT NUMBER:

THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY HIS/HER SIGNATURE THAT THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED REQUIREMENTS.

File details come from the government source that posted it. Updated .