TGI_3819P25502_A01_c0v0.pdf
PDF 1014 KB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a Task Group Instruction (TGI) for a radiographic test of welded joints on the USS Blue Ridge (LCC-19), specifically for the 1C Main Feed Pump Discharge piping system. The TGI details a technical inspection of two welded joints (PJ-1A and PJ-3A) located in the Fire Room, with work to be performed between January 12, 2026 and May 15, 2027. The radiographic testing (RT) will be conducted using specific procedures, including quality level checks, exposure techniques, and film evaluation criteria.
The document includes multiple technical forms and appendices providing granular details about the inspection, such as mapping plans, material lists, and quality assurance documentation. Key personnel involved include Shinichi Ito (Planner, Code 234), S. Hasegawa (Engineer, Code 260), and T. Yaginuma (Work Integration Manager, Code 333). SRF-JRMC will provide supporting services including crane rigging, utilities, safety inspections, and radiation safety officer (RSO) support. The overall purpose is to accomplish the radiographic test for supporting Task Group Instruction No. 3819P25502R01.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 1C MFP DISCH PPG AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*F/O - ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI No. 3819P25502R01
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SHINICHI ITO 234. 315-243-4297 28-JUN-2024
APPROVED BY: CODE PHONE DATE
HIDEKUNI SHINMEI 234. 315-243-2371 28-JUN-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 1C MFP DISCH PPG AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-3 QA J20A
(1-2)
J-1 M-1 Map (1)
1. SCOPE/PURPOSE
1.1 Title: Onboard Radiographic Test (RT) Inspection of Piping Welded Joint; accomplish
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (2 EA), Welded Joint, Piping
System: 1C Main Feed Pump Discharge Size: 5 Inch IPS Material: Carbon Steel Joint Design: Butt Weld, P-3 Joint ID: PJ-1A and PJ-3A of TGI No. 3819P25502R01 Piping Class: P-1 Remarks: See Mapping Plan Enclosure-01 for detail
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
1/12/2026
5/15/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/0
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirement of 009-112 of 2.1.
5.2 Accomplish the requirement of 009-12 of 2.1, including Table One, Column A, Line 11 for radiographic inspection (RT) of each welded joint listed in 1.3.1, using Enclosure-01 for guidance.
5.2.1 Accomplish the requirement of 009-09 of 2.1.
5.2.2 Obtain each copy of QA Form 20 Enclosure-02-1 and Enclosure-02-2 of TGI No. 3819P25502R01 for verification of joint ID PJ-1A and PJ-3A. See 5.3.4.
5.2.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form J20A Enclosure-02-1 and Enclosure-02-2.
5.3 Notes:
5.3.1 Planner: Code 234 S. Ito, 243-4297
Engineer: Code 260 S. Hasegawa, 243-8722
5.3.2 Work Integration Manager (WIM) Code 333 T. Yaginuma, 080-5419-0598
5.3.3 Welding of the joints has been accomplished by SRF-JRMC in accordance with TGI No.
3819P25502R01 for joint ID PJ-1A and PJ-3A.
5.3.4 SRF-JRMC WIM will provide a copy of QA Form 20 when requested by Contractor.
5.3.5 JCNs EM02-L166 and EM02-L167 are related to this TGI.
5.4 Government Furnished Material (GFM): None.
5.5 SRF-JRMC will provide the following service work: (TGI No. 3819P25502S03)
5.5.1 [C740] Crane and crane rigging service.
5.5.2 [X99E] Utilities service.
5.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.5.6 [C135] QA inspection for (G)Symbol inspection.
5.5.7 [C106R] RSO and ARSO service for RT.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1C MFP DISCH PPG AY A 0 0
CU PHASE TITLE:
*F/O - ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI No. 3819P25502R01
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
MN FEED PP 1C MFP PP 1C MFP DISCH CHK V- #8 1C FDWTR MFP DSCH V-
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P25502A01-Map.pdf) saved on 25-JUN-2024 0000.
2. ENCLOSURE-02 (3819P25502A01-QAJ20A.docx) saved on 25-JUN-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P25502 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish the RT inspection of 1C main feed pump discharge piping welded joints for supporting of TGI No. 3819P25502R01.
Location of Work:
Fire Room (8-76-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 22 KE PC
5.2 QA HRs 22 KE PC
CFM (radiographic test of 2 welded joints on 1C main feed pump discharge piping)
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
1C MFP DISCH PPG AY A 0 0
CU PHASE TITLE:
*F/O - ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI No. 3819P25502R01
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P25502 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 1C MFP DISCH PPG AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P25502 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 1C MFP DISCH PPG AY A 0
Shinji.Hasegawa.ja Text Box 3819P25502A01
3819P25502A01 ENCLOSURE-02-1 TOTAL 2
REPORT OF RT OPERATIONS AND EVALUATION PAGE _1 OF 2
QA FORM J20A (FRONT)
2. SHIP AND HULL NO.:
USS Blue Ridge (LCC-19)
3. JOB ORDER/KEY OP.:
3819P25502A01
4. CU PHASE TITLE:
F/O – ACCOMPLISH THE REDIOGRAPHIC TEST FOR TGI
No. 3819P25502R01
5. RT PERFORMED BY: 6. SPECIMEN MATERIAL:
[] CSTL [] CRES [] CUNI [] AL [] OTHER:
7. TM: 8. TS: 9. JOINT ID
PJ-1A
10. WELD TYPE:
[] Butt [] W/backing [] Backing removed [] Con insert [] Other:
11. REPAIR NO.
[] Orig. [] R-
12. INSPECTION PROCEDURE(S):
13. ACCEPTANCE STANDARD
[] MIL-STD 2035 [] MIL-STD 1689 [] Other: [] Class 1 [] Class 2 [] Class 3
14. PENETRAMETER:
SIZE: GROUP: []02 []1 []4 []Other:
15. PENETRAMETER PLACEMENT
[] Source side [] Film Side [] On/off [] Separate block
16. PENETRAMETER TYPE:
[] MIL-Type [] ASTM-Type
17. QUALITY LEVEL
[] 2-2T [] 2-4T []Other:
18. RT COVERAGE REQUIRED:
[] 60 DEG [] 360 DEG [] 100% [] Other:
19. EXPOSURE TECHNIQUE:
[] SWE/SWV [] DWE/SWV [] DWE/DWV [] O [] S
20. FILM TYPE: [] Fuji IX-80 [] Fuji IX-100 [] Other:
21. FILM LOAD
[] Single [] Double [] Other:
22. INTENSIFYING SCREENS:
[] Pb Oxide [] Pb Foil
23. FRONT FILTER Tm:
[] N/A
24. BACK FILTER Tm:
25. RADIATION SOURCE:
[] X-ray [] Ir-192 [] Se-75 [] Co 60
26. VOLTAGE / CURIES: 27. FSS / SOURCE DIM.: 28. SFD:
Min: Act:
29. BEAM ANGLE:
30. SHIM MATERIAL: []N/A
GROUP: []02 []1 []4 []Other:
31. SHIM THICKNESS: []N/A 32. FILM ID: []N/A 33. MASKING
[] Used [] Not Used
34. RADIOGRAPHIC SHOOTING SKETCH
Depict the following: (1) Direction of radiation (2) Placement of penetrameter (3) Location of location marker (4) Location of shims (if used)
(5) Location of Pb "B" (6) Location & thickness of back filter (7) Location of film (8) Blocking/masking technique used (if applicable)
STANDARD
SET-UPS
[ ] TECH 1
SWE/SWV
[ ] TECH 2
DWE/SWV
[ ] TECH 3
DWE/DWV (O)
[ ] TECH 4
DWE/DWV (S)
NOTE: REFERENCE TO A STANDARD SETUP IS ACCEPTABLE
35. REMARKS:
36. RADIOGRAPHER DATE (DATE OF EXPOSURE): 37. REPORT NUMBER:
3819P25502A01 ENCLOSURE-02-1 TOTAL 2
REPORT OF RT OPERATIONS AND EVALUATION PAGE 2 OF 2
QA FORM J20A (BACK)
38. RADIOGRAPHIC INTERPRETATION OF JOINT NO.: 39. REMARKS AND INDICATION
DETAILS:
(a) LOCATION MARKERS (INCREMENTS)
(b) PENETRAMETER PLACEMENT
(c) REQ. T-HOLE VISIBLE
(d) DENSITY (PENE AND AOI)
(e) BACKSCATTER CONTROL (LEAD “B’)
(1) CRACK
(2) SLAG/OXIDE
(3) POROSITY
(4) LACK OF PENETRATION
(5) LACK OF FUSION
(6) MELT THROUGH
(7) BURN THROUGH
(8) ROOT OXIDATION
(9) CRATER PIT
(10) TUNGSTEN INCLUSION
(11) ROOT SURFACE CONCAVITY
(12) ROOT SURFACE CONVEXITY
(13) UNDERCUT
(14) ROOT CENTER LINE CREASE
(15) INCOMPLETE INSERT MELT
(16) QUESTIONABLE DISCONTINUITY
(17) FILM ARTIFACTS
(18) BASE METAL INDICATIONS
(19) INADVERTENT RADIOGRAPHY
(20)
(21)
(22)
40. INTERPRETATION KEY:
(1) Blocks left blank – condition is NOT present on the film
(2) Blocks marked O – condition is present on the film and is acceptable.
(3) Blocks marked X – condition is present on the film and rejectable.
(4) Blocks marked with prepared notes (①,②, etc.) – condition present and see applicable note(s).
41. PREPARED NOTES
① Visually verified as an acceptable surface condition.
② Engineering evaluation required/requested via CFR.
③ Artifacts (Crimp or pressure marks, processing marks, finger prints, streaks, etc.) present on film and do not interfere with interpretation.
④ Film superimposed for interpretation, evaluation.
⑤
⑥
42. REMARKS
43. CONDITION FOUND REPORTS (CFR) NUMBER(s) SUBMITTED: []N/A
44. FINAL DISPOSITION
[ ] ACCEPT [ ] REJECT
45. RT INSPECTOR DATE 46. REPORT NUMBER:
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY HIS/HER SIGNATURE THAT THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED REQUIREMENTS.
3819P25502A01 ENCLOSURE-02-2 TOTAL 2
REPORT OF RT OPERATIONS AND EVALUATION PAGE 1 OF 2
QA FORM J20A (FRONT)
2. SHIP AND HULL NO.:
USS Blue Ridge (LCC-19)
3. JOB ORDER/KEY OP.:
3819P25502A01
4. CU PHASE TITLE:
F/O – ACCOMPLISH THE RADIOGRAPHIC TEST FOR TGI
No. 3819P25502R01
5. RT PERFORMED BY: 6. SPECIMEN MATERIAL:
[] CSTL [] CRES [] CUNI [] AL [] OTHER:
7. TM: 8. TS: 9. JOINT ID
PJ-3A
10. WELD TYPE:
[] Butt [] W/backing [] Backing removed [] Con insert [] Other:
11. REPAIR NO.
[] Orig. [] R-
12. INSPECTION PROCEDURE(S):
13. ACCEPTANCE STANDARD
[] MIL-STD 2035 [] MIL-STD 1689 [] Other: [] Class 1 [] Class 2 [] Class 3
14. PENETRAMETER:
SIZE: GROUP: []02 []1 []4 []Other:
15. PENETRAMETER PLACEMENT
[] Source side [] Film Side [] On/off [] Separate block
16. PENETRAMETER TYPE:
[] MIL-Type [] ASTM-Type
17. QUALITY LEVEL
[] 2-2T [] 2-4T []Other:
18. RT COVERAGE REQUIRED:
[] 60 DEG [] 360 DEG [] 100% [] Other:
19. EXPOSURE TECHNIQUE:
[] SWE/SWV [] DWE/SWV [] DWE/DWV [] O [] S
20. FILM TYPE: [] Fuji IX-80 [] Fuji IX-100 [] Other:
21. FILM LOAD
[] Single [] Double [] Other:
22. INTENSIFYING SCREENS:
[] Pb Oxide [] Pb Foil
23. FRONT FILTER Tm:
[] N/A
24. BACK FILTER Tm:
25. RADIATION SOURCE:
[] X-ray [] Ir-192 [] Se-75 [] Co 60
26. VOLTAGE / CURIES: 27. FSS / SOURCE DIM.: 28. SFD:
Min: Act:
29. BEAM ANGLE:
30. SHIM MATERIAL: []N/A
GROUP: []02 []1 []4 []Other:
31. SHIM THICKNESS: []N/A 32. FILM ID: []N/A 33. MASKING
[] Used [] Not Used
34. RADIOGRAPHIC SHOOTING SKETCH
Depict the following: (1) Direction of radiation (2) Placement of penetrameter (3) Location of location marker (4) Location of shims (if used)
(5) Location of Pb "B" (6) Location & thickness of back filter (7) Location of film (8) Blocking/masking technique used (if applicable)
STANDARD
SET-UPS
[ ] TECH 1
SWE/SWV
[ ] TECH 2
DWE/SWV
[ ] TECH 3
DWE/DWV (O)
[ ] TECH 4
DWE/DWV (S)
NOTE: REFERENCE TO A STANDARD SETUP IS ACCEPTABLE
35. REMARKS:
36. RADIOGRAPHER DATE (DATE OF EXPOSURE): 37. REPORT NUMBER:
3819P25502A01 ENCLOSURE-02-2 TOTAL 2
REPORT OF RT OPERATIONS AND EVALUATION PAGE 2 OF 2
QA FORM J20A (BACK)
38. RADIOGRAPHIC INTERPRETATION OF JOINT NO.: 39. REMARKS AND INDICATION
DETAILS:
(a) LOCATION MARKERS (INCREMENTS)
(b) PENETRAMETER PLACEMENT
(c) REQ. T-HOLE VISIBLE
(d) DENSITY (PENE AND AOI)
(e) BACKSCATTER CONTROL (LEAD “B’)
(1) CRACK
(2) SLAG/OXIDE
(3) POROSITY
(4) LACK OF PENETRATION
(5) LACK OF FUSION
(6) MELT THROUGH
(7) BURN THROUGH
(8) ROOT OXIDATION
(9) CRATER PIT
(10) TUNGSTEN INCLUSION
(11) ROOT SURFACE CONCAVITY
(12) ROOT SURFACE CONVEXITY
(13) UNDERCUT
(14) ROOT CENTER LINE CREASE
(15) INCOMPLETE INSERT MELT
(16) QUESTIONABLE DISCONTINUITY
(17) FILM ARTIFACTS
(18) BASE METAL INDICATIONS
(19) INADVERTENT RADIOGRAPHY
(20)
(21)
(22)
40. INTERPRETATION KEY:
(1) Blocks left blank – condition is NOT present on the film
(2) Blocks marked O – condition is present on the film and is acceptable.
(3) Blocks marked X – condition is present on the film and rejectable.
(4) Blocks marked with prepared notes (①,②, etc.) – condition present and see applicable note(s).
41. PREPARED NOTES
① Visually verified as an acceptable surface condition.
② Engineering evaluation required/requested via CFR.
③ Artifacts (Crimp or pressure marks, processing marks, finger prints, streaks, etc.) present on film and do not interfere with interpretation.
④ Film superimposed for interpretation, evaluation.
⑤
⑥
42. REMARKS
43. CONDITION FOUND REPORTS (CFR) NUMBER(s) SUBMITTED: []N/A
44. FINAL DISPOSITION
[ ] ACCEPT [ ] REJECT
45. RT INSPECTOR DATE 46. REPORT NUMBER:
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY HIS/HER SIGNATURE THAT THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED REQUIREMENTS.
File details come from the government source that posted it. Updated .