The document is a Task Group Instruction (TGI) for cleaning, inspecting, repairing, and preserving the Oily Waste Holding Tank (9-90-0-F) on the USS BLUE RIDGE (LCC-19), located in the Engine Room. The tank has a capacity of 15,748 gallons and requires comprehensive maintenance, including commercial blast cleaning, visual inspection for structural integrity, and repair of deteriorated components such as welds, plates, and stiffeners. The work involves Level III general cleaning, installation of manhole covers, and application of new coating to the entire 3,070 square foot interior surface.
The TGI specifies a detailed procedure for the maintenance, with the contractor work scheduled to start on 1/12/2026 and complete by 5/15/2027. Special requirements include maintaining cleanliness standards, working around a fire zone boundary, and fabricating a non-flammable closure. The instruction involves multiple craft hours, including labor, painting, structural repair, welding, electrical work, and quality assurance. The work will be conducted at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan, with SRF-JRMC providing supporting services such as crane rigging, utility services, safety inspections, and technical support.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: OILY TK 9-90-0-F AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (9-90-0-F)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SEIICHI NAKANO 231B. 315-243-4519 19-MAR-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 19-MAR-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III, This Work Affects a Fire Zone Boundary. Fabrication and/or Staging of a Non-Flammable Closure is Required. SURFMEPP
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: OILY TK 9-90-0-F AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J1-2 M-1
1. SCOPE/PURPOSE
1.1 Title: Oily Waste Holding Tank (9-90-0-F); clean, inspect, repair, and preserve
1.2 Location of Work:
1.2.1 Oily Waste Holding Tank (9-90-0-F)
1.2.2 Engine Room (8-86-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Oily Waste Holding Tank
Tank No.: 9-90-0-F Capacity: 15,748 Gallons
1.3.2 Quantity (One EA), Manhole Cover Plate(s) for 9-90-0-F
Manhole No(s).: 8-90-1 Size: 15 Inches x 23 Inches Material: Steel
1.3.3 Quantity (One EA), Bolting Ring for Manhole Cover Plate(s) for 9-90-0-F
Manhole No(s).: 8-90-1 Material: Steel
1.3.4 Quantity (3,070 SF), Entire Interior Surface of Oily Waste Holding Tank (9-90-0-F)
Remarks: The area includes tank side of manhole cover plate(s) and bolting ring
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-LCC19-025-25 for the area listed in 1.3.4
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. REFERENCES:
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
4 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
5 DWG 100-
2491003
SHELL PLTG & STGR FRAME 51
1/2 -102 1/4 CL TO 4 TH DECK
G Y AL
L
6 DWG 101-
2491012
CVK & Shell Long AFT FR 51 1/2 L Y AL
7 DWG 101-
2491013
Floors FR 8-98 S Y SE E N
OT
E
8 DWG 101-
4345996
Structural Mod's Oily Waste Tank - Y AL
9 DWG 102-
2491031
Inner Bottom PLTG FR 51 1/2 - 98 K Y AL
10 DWG 123-
4354700
Oily Waste Tank Fr 90 - 98 - Y AL
11 TM T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
3 N
12 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish the requirements of 009-107 of 2.1.
5.1.1.2 Ensure General Cleaning must be Level III.
5.1.2 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.
5.2 Commercial blast clean each tank listed 1.3.1. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of 2.4.
5.3 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, each crack, and area of damage or distortion, including each sounding tube, tank vent, overflow, piping, each structural member, and manhole cover, using 2.5 through 2.10 for guidance.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.3.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.3 to the SUPERVISOR.
5.4 Repair each tank listed in 1.3.1, based on the report 5.3.1 and CCIMS assessment report as designated by the SUPERVISOR, using 2.5 through 2.10 for guidance. See 5.9.5 through 5.9.7.
5.4.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.
5.4.2 Chip and grind each surface flush in way of each repair.
5.4.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.
5.4.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.4.3.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.4.3.3 Fill each local pit and groove with weld material prior to application of each principal build up layer.
5.4.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.
5.4.4 Remove existing, fabricate and install new a total of 10 square feet of deteriorated plate.
5.4.5 Remove existing, fabricate and install new a total of 4 linear feet of defective stiffener.
5.4.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.
5.4.6.1 Accomplish nondestructive testing in accordance with Line 11.
5.4.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.
5.5 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.2.
5.6 Accomplish the requirements of 009-32 of 2.1 for machinery space side surface of each bolting ring listed in 1.3.3.
5.7 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for each area listed in 1.3.4.
5.7.1 Submit new coating data applied to the SUPERVISOR in accordance with 2.11 and 2.12.
5.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.9 Notes:
5.9.1 Planner: Code 231B S. Nakano, 243-4519
5.9.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.9.3 2.12 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.9.4 This TGI meets the intent of DDG CSWT File Nos. 123-111, 123-133, and 123-142.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.9.5 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12351I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.
5.9.6 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.9.7 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.9.8 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.9.9 WPC will copy the following pages in reference.
REF. 2.7: Pages 24, 24A, 25, and 35.
5.9.10 JCNs EB14-ZA51, EB14-ZA54, and EB14-ZA59 are related to this TGI.
5.10 Government Furnished Material (GFM): None.
5.11 SRF-JRMC will provide the following service work: (TGI No. 3819P12351S02)
5.11.1 [C740] Crane and crane rigging service.
5.11.2 [X99E] Utility service, electrical.
5.11.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.11.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.11.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.11.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
5.11.7 [C135] QA inspection for (G) symbol(s).
5.11.8 [C250] Technical support.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
OILY TK 9-90-0-F AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (9-90-0-F)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
WO 9-90-0-F TK MANHOLE 8-90-1 HA
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P12351 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish cleaning, inspection, repair, and preservation for oily waste holding tank (9-90-0-F).
Location of Work:
Oily Waste Holding Tank (9-90-0-F) Engine Room (8-86-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 LBR HRs 22 KE PC
5.2 PNTR HRs, QA HRs 22 KE PC
5.3 PNTR HRs, SFTR HRs 22 KE PC
5.4 SFTR HRs, WELD HRs, CARP HRs, QA HRs 22 KE PC
5.5 PNTR HRs, QA HRs 22 KE PC
5.6 PNTR HRs, QA HRs 22 KE PC
5.7 PNTR HRs, ELEC HRs, QA HRs 22 KE PC
5.8 PNTR HRs, QA HRs 22 KE PC
Dewatering/Cleaning Work CFM for marine chemist, tank watch cost, gaskets, fasteners, and MISC such as other consumable.
22 MQ CS
Structure Work CFM for MT inspection cost, fire watch and tank watch cost, lead sampling/analysis cost, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure and covering material, and other consumable.
22 MQ CS
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Preservation Work CFM for all paints, thinner, grits, disposal cost, compressor and fuel oil, dryer for compressor, air conditioner, tank watch cost, tank watch cost, and misc such as covering material and other consumable.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
OILY TK 9-90-0-F AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (9-90-0-F)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P12351 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 OILY TK 9-90-0-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P12351 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 OILY TK 9-90-0-F AY A 0
File details come from the government source that posted it. Updated .