TGI_3819P13411A01_c1v1.pdf
PDF 4 MB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a Task Group Instruction (TGI) for repair and preservation of structural members on the USS Blue Ridge (LCC-19), specifically focusing on work in compartment 4-109-7-Q. The instruction covers detailed repair requirements for various structural components, including shell plating, web frames, longitudinals, and transverse frames across multiple ship locations such as the Diesel Exhaust Piping Space, Gear Locker, and various deck areas.
The work involves ultrasonic thickness measurements, removing and fabricating new structural members, and performing weld repairs on deficient welds and mechanical gouges. The project is scheduled to start on 1/12/2026 and complete by 6/12/2027, with special requirements including working in a fire zone boundary and using non-flammable closures. The instruction notes potential asbestos and lead hazards, and requires adherence to specific welding and inspection standards. The repair work spans approximately 1,090 square feet of structural plating and involves multiple specific structural elements across different ship frames and decks.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: STRL MBR 4-109-7-Q AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - REPAIR AND PRESERVE STRUCTURAL MEMBER IN 4-109-7-Q
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YUUICHI YOSHIHARA 231B. 315-243-9984 21-JUN-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 21-JUN-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Correction of Rev. of Ref. No. 7 is required.
CHANGE INSTRUCTIONS:
CH1: Correct Rev. of Ref. No. 7. (08/22/2024)
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: STRL MBR 4-109-7-Q AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 1/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-6 J1-2 M1-3 Sketch (1-14)
1. SCOPE/PURPOSE
1.1 Title: Structural Member in 4-109-7-Q; repair and preserve
1.2 Location of Work:
1.2.1 Diesel Exhaust Piping Space (4-109-7-Q)
1.2.2 Gear Locker (3-109-11-A)
1.2.3 Freeboard Weather, Frames between 111 and 113, Starboard
1.2.4 SD Storeroom (4-98-9-Q)
1.2.5 Void (5-98-1-V)
1.2.6 Crew Living Space (5-109-0-L)
1.2.7 Crew Washroom, Water Closet, Shower, and Decontamination Station (5-104-1-L)
1.3 Identification:
1.3.1 Quantity (1,090 SF), Structural Plating in 4-109-7-Q
Reading Point: 12 Inches x 12 Inches Grid Pattern Remarks: See 2.5 through 2.7 for base material
The area excepts structural shapes
1.3.2 Quantity (One Lot), Structural Member in 4-109-7-Q
Remarks: See 2.8 for detail
1.3.2.1 Quantity (One EA), Shell Plate, Sponson Shell, Frames between 111 and 113
Material: HTS, MIL-S-22698 GR-DH36, 12.75 LBs Plate
1.3.2.2 Quantity (One EA), Web Frame 111 1/2 on Shell Plate listed in 1.3.2.1
Material: OS, MIL-S-22698 GR-A, 10 Inches x 4 Inches x 15 LBs I-T
1.3.3 Quantity (One Lot), Structural Member in 4-109-7-Q
1.3.3.1 Quantity (One Lot), Transverse Frame 112 1/2 on Shell Plating and Sponson Shell Plating
Remarks: See 2.5 and 2.6 for base material, and Sheet 3 Figure-1a and Figure-1a-1 of Sketch Enclosure-01 for location detail
FOUO
SHIP: LCC-19 CHG/VER: 1/1
1.3.3.2 Quantity (One Lot), Web Frame 112 on Shell Plating and Sponson Shell Plating
Remarks: See 2.5 and 2.6 for base material, and Sheet 4 Figure-1b, and Sheet 5 Figure-1b-1 and Figure-1b- 2 of Sketch Enclosure-01 for location detail
1.3.3.3 Quantity (One Lot), Transverse Frame 111 1/2 on Shell Plating and Sponson Shell Plating
Remarks: See 2.5 and 2.6 for base material, and Sheet 4 Figure-1c and Sheet 6 Figure-1c-1 of Sketch Enclosure-01 for location detail
1.3.3.4 Quantity (One Lot), Transverse Frame 110 1/3 on Shell Plating and Sponson Shell Plating
Remarks: See 2.5 and 2.6 for base material, and Sheet 6 Figure-1d-1 and Sheet 7 Figure-1d-2 of Sketch Enclosure-01 for location detail
1.3.3.5 Quantity (One Lot), Transverse Frame 109 2/3 on Shell Plating and Sponson Shell Plating
Remarks: See 2.5 and 2.6 for base material, and Sheet 7 Figure-1e of Sketch Enclosure-01 for location detail
1.3.3.6 Quantity (One Lot), Vertical Stiffener on Shell Plating and Transverse Bulkhead Plating Frame 109
Remarks: See 2.5 and 2.6 for base material, and Sheet 8 Figure-1f-1 and Figure-1f-2 of Sketch Enclosure-01 for location detail
1.3.3.7 Quantity (One Lot), Lateral Support on Longitudinal No. 22, Frame 111
Remarks: See 2.5 and 2.9 for base material, and Sheet 9 Figure-1g-1 and Figure-1g-2 of Sketch Enclosure- 01 for location detail
1.3.3.8 Quantity (One Lot), Toe Bracket on Longitudinal No. 23, Frames between 109 and 110, Inboard Side
Remarks: See 2.5 and 2.9 for base material, and Sheet 10 Figure-1h of Sketch Enclosure-01 for location detail
1.3.3.9 Quantity (One Lot), Toe Bracket on Longitudinal No. 24, Frames between 109 and 110, Inboard Side
Remarks: See 2.5 and 2.9 for base material, and Sheet 10 Figure-1i of Sketch Enclosure-01 for location detail
1.3.3.10 Quantity (One Lot), Longitudinal No. 21 on Third Deck Plating, Frames between 110 and 111
Base Material: OS, MIL-S-22698 GR-A, 12 Inches x 4 Inches x 22 LBs I-T Remarks: See Sheet 11 Figure-2a of Sketch Enclosure-01 for location detail
1.3.3.11 Quantity (One Lot), Longitudinal No. 21 on Third Deck Plating, Frames between 109 and 110
Base Material: OS, MIL-S-22698 GR-A, 12 Inches x 4 Inches x 22 LBs I-T Remarks: See Sheet 11 Figure-2b of Sketch Enclosure-01 for location detail
1.3.3.12 Quantity (One Lot), Longitudinal No. 22 on Third Deck Plating, Frames between 109 and 110
Base Material: OS, MIL-S-22698 GR-A, 12 Inches x 4 Inches x 22 LBs I-T Remarks: See Sheet 12 Figure-2c and Figure-2d of Sketch Enclosure-01 for location detail
1.3.3.13 Quantity (One Lot), Longitudinal No. 25 on Third Deck Plating, Frames between 111 and 112
FOUO
SHIP: LCC-19 CHG/VER: 1/1
Base Material: OS, MIL-S-22698 GR-A, 12 Inches x 4 Inches x 22 LBs I-T Remarks: See Sheet 13 Figure-2e of Sketch Enclosure-01 for location detail
1.3.3.14 Quantity (One Lot), Web Frame 112 on Third Deck Plating, Longitudinals between No. 24 and No. 25
Base Material: OS, MIL-S-22698 GR-A, 17.85 LBs Plate Remarks: See Sheet 13 Figure-2f of Sketch Enclosure-01 for location detail
1.3.3.15 Quantity (One Lot), Third Deck Plating, between Frames 110 and 111, and Longitudinals No. 23 and No. 24
Base Material: OS, MIL-S-22698 GR-A, 15.3 LBs Plate Remarks: See Sheet 14 Figure-3 and Figure-3-1 of Sketch Enclosure-01 for location detail
1.3.4 Quantity (1,850 SF), Entire Interior Surface of Diesel Exhaust Piping Space (4-109-7-Q)
Remarks: The area includes exhaust piping space side of access cover plate(s)
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Hazard
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 6/12/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM T9074-
AS-GIB-
010/271
Requirements for Nondestructive Testing Methods
1 N
4 TM S9086-
DA-STM-
010/CH-100
Hull Structures 4 N
5 DWG 100-
2491008
SPONSON & STGR AFT FR 76-1/2 G Y AL
L
6 DWG 100-
2491005
SHELL PLTG & STGR FRAME 102
1/4 STERN CL TO 4 TH DECK
F Y AL
L
7 DWG 100-
2491006
SHELL PLTG & STGR FR 102¼-
STERN - ABV 4TH DK
L Y AL
L
8 PDD 100-
ELM-240306
RPR PLAN OF DEFORMED
SPONSON SHELL & WEB FR 111
1/2 IN DSL EXH PP SP (4-109-7-Q)
- Y AL
L
9 DWG 114-
2491176
STRUCTURAL DETAILS AE Y 11,
10 DWG 113-
2491129
FDN MISC – 3RD DK F Y 20
3. APPENDICES:
FOUO
SHIP: LCC-19 CHG/VER: 1/1
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish ultrasonic thickness measurement (UTM) on each structural plating listed in 1.3.1 in accordance with Paragraph 6.7 of 2.3, and 2.4, using 2.5 through 2.7 for guidance.
5.1.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.1 to the SUPERVISOR.
5.2 Remove existing, fabricate, and install new each structural member listed in 1.3.2 in accordance with 2.8.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.2 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each shell plate listed in 1.3.2.1. Allowable leakage: None.
5.3 Accomplish weld repair of deficient welds, mechanical gouges, and mechanical hole on each existing structural member listed in 1.3.3 in accordance with 2.5 and 2.9, using 2.6 and 2.10 for guidance. See 5.9.7.
5.3.1 Gouge out the deficient welds.
5.3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3.3 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each third deck plating listed in 1.3.3.15. Allowable leakage: None.
5.4 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 18, for each area listed in 1.3.4.
5.5 Confirm that all personnel have exited the space prior to closure of the space listed in 1.2.1. Designate one person to account for all personnel who may have entered the space.
5.6 Accomplish the requirements of 009-32 on 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 231B Y. Yoshihara, 243-9984
Planner: Code 231B N. Kurokawa, 243-0108 Planner: Code 234 M. Eguchi, 243-0978 Engineer: Code 250 N. Takanishi, 243-4331
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
FOUO
SHIP: LCC-19 CHG/VER: 1/1
5.7.4 Opening, initial cleaning, and closing of each space listed in 1.2.5 will be covered by TGI No. 3819P12372A01
(KTR TGI).
5.7.5 Preservation work for new and disturbed exterior surfaces of freeboard will be covered by ICN 3819P11001
(KTR TGI).
5.7.6 This TGI is in response to CCIMS report No. CCIMS-G1N6-LCC19-071-23 from TGI No. 3819M11006I04.
5.7.7 This TGI clears DFS LCC-19-1034-2023 in its entirety.
5.7.8 JCNs EA05-L089 and ES01-NNYW are related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 SRF-JRMC will provide GFM listed in Appendix ”M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P13411S02).
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utilities service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s).
5.9.7 [C250] On-site engineering support for weld repair.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 1/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRL MBR 4-109-7-Q AY A 0 1
CU PHASE TITLE:
F/O - REPAIR AND PRESERVE STRUCTURAL MEMBER IN 4-109-7-Q
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CMPT 3-109-11-A MS CMPT 4-109-7-Q MS
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P13411A01-Sketch.pdf) saved on 15-JUN-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P13411 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to repair and preserve structural member in 4-109-7-Q.
Location of Work:
Diesel Exhaust Piping Space (4-109-7-Q) Gear Locker (3-109-11-A) Freeboard Weather, Frames between 111 and 113, Starboard SD Storeroom (4-98-9-Q) Void (5-98-1-V) Crew Living Space (5-109-0-L) Crew Washroom, Water Closet, Shower, and Decontamination Station (5-104-1-L)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 SFTR HRs, RGRS HRs 22 KE PC
5.2 SFTR HRs, WELD HRs, SMTL HRs, INSL HRs, CARP
HRs, PNTR HRs, LBR HRs, RGRS HRs, QA HRs
22 KE PC
5.3 SFTR HRs, WELD HRs, BLRM HRs, INSL HRs, PNTR HRs, RGRS HRs, QA HRs
22 KE PC
5.4 INSL HRs, PNTR HRs, RGRS HRs, QA HRs 22 KE PC
5.5 SFTR HRs 22 KE PC
5.6 PNTR HRs, QA HRs 22 KE PC
Structure Work CFM: $ for fire watch cost, confined space watch cost, tank watch cost, asbestos sampler/analysis cost for compartment insulation, lead sampling/analysis cost, pin/adhesive for compartment insulation, marine chemist cost, air compressor rental cost and fuel oil cost for air hose test, fastener, gasket, ---continue to below---
22 MQ CS
FOUO
J-2
SHIP: LCC-19 CHG/VER: 1/1
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
---continued to from above--- and misc such as electrode, gases, temporary closure/covering material, tybek suit, tape, and other consumable.
22 MQ CS
Boiler and Lagging Work CFM: $ for asbestos sample and analyze cost, paints, plastic bag/sheet, tyvck suit and MISC.
22 MQ CS
Preservation Work CFM: $ for all paints, thinner, grits including disposal cost, confined space watch cost, tank watch cost, UTM inspection cost, sampler/analysis lead, air compressor, dryer, fuel oil, air conditioning, and MISC such as covering material and other consumable.
22 MQ CS
Process Funding Document 10 CT OM
Version-1: correct Revision of Ref. No. 7. C231B R. Takagi, 08/22/2024. Y/Y/N
V-01
FOUO
M-1
SHIP: LCC-19 CHG/VER: 1/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRL MBR 4-109-7-Q AY A 0 1
CU PHASE TITLE:
F/O - REPAIR AND PRESERVE STRUCTURAL MEMBER IN 4-109-7-Q
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P13411 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLATE,ME, ORIG: C231B,
Y.YOSHIHARA, 243-9984
ORDER FOR KTR
SIZE: 4 FT X 5 FT
9B 9515 001533368 NA 4 N 41635246 20/SF
002 M TEE-BAR, I-T SHAPE, , TEE-
BAR, I-T SHAPE, SPEC: MIL-S-
22698 GRADE A, NOMINAL
SIZE: 10” X 4” X 15 LBS, WEB
THK: 1/4” (0.230”), FLG THK:
1/4” (0.270”), MATL: STEEL OS,
*REMARKS: CUT FROM 10”
(9.99”) DEPTH X 4" (4.00")
FLANGE X 15 LBS W-SHAPE
TO T-SHAPE, TWO SIDES OF
ONE FLANGE REMOVED
10 FT CONTINUOUS LENGTH X
1 EA
9B 9520 LL9308333 NA 4 N 41907510 10/FT
003 M INSULATI, ORIG: C231B,
Y.YOSHIHARA, 243-9984
ORDER FOR KTR
9Q 5640 008096312 NA 4 N 41635248 10/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 1/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
004 M CAP,SNAP, ORIG: C231B,
Y.YOSHIHARA, 243-9984
ORDER FOR KTR
9B 5325 007377648 NA 4 N 41635249 70/EA
005 M TAPE,TEX, ORIG: C231B,
Y.YOSHIHARA, 243-9984
ORDER FOR KTR
9B 8315 002671632 NA 4 N 41635250 1/RO
006 M TAPE,TEX, ORIG: C231B,
Y.YOSHIHARA, 243-9984
ORDER FOR KTR
9B 8315 002671633 NA 4 N 41635252 1/RO
007 M ADHESIVE, ORIG: C231B,
Y.YOSHIHARA, 243-9984
ORDER FOR KTR
9B 8040 002738708 NA 4 Y 41635244 1/GL
400 M SILICA PIPE COVER, SILICA
PIPE COVER, 18"IPS X 2"THK X
36" LG, THERMO-1200, SILICA
PIPE COVER, NON-ASBESTOS,
MIL-DTL-2781
ORDER FOR KTR
C234 M. EGUCHI, 243-0978
9Q 5640 LL9305170 NA 4 N 41957480 4/EA
401 M INSULATION BLOCK,TH, SIZE:
12" X 36" X 2-1/2" THK, 7 EACH
PER BOX
ORDERED FOR KTR
ORIG: C234 M. EGUCHI 243-
9Q 5640 002671591 NA 4 N 41645303 4/BX
402 M SILICA PIPE COVER,, SILICA
PIPE COVER, 14" IPS X 2" THK
X 3 FT LONG, NON-ASBESTOS,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL9301047 NA 4 N 41957479 4/EA
402 M SILICA PIPE COVER,, SILICA
PIPE COVER, 14" IPS X 2" THK
X 3 FT LONG, NON-ASBESTOS,
ORIG:CODE 234 M. EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL9301047 NA 4 N 42327471 4/EA
403 M CEMENT,INSULATION,H,
CEMENT, 45 LB/ BG,
ORIG:CODE 234 M.EGUCHI,
243-0978
ORDERED FOR X57
9Q 5640 002264540 NA 4 Y 41645307 3/BG
404 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORIG:CODE 234 M.EGUCHI,
243-0978
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 41645314 3/GL
405 M INSULATION BLOCK,TH,
ORDERED FOR KTR
C234 K.FURUKAWA, 243-0978
6” X 36” X 3” THK (12 PER ONE
BOX)
9Q 5640 002671592 NA 4 N 41645299 4/BX
406 M CLOTH,PL, ORIG: C234, M.
EGUCHI, 243-9982
ORDERED FOR KTR
9B 8305 001487364 NA 4 N 41645422 1/RO
FOUO
M-3
SHIP: LCC-19 CHG/VER: 1/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
407 M INSULATI, INSULATION,
FIBROUS GLASS, THERMAL,
BLANKET WITHOUT BINDER,
UNFACED, SIZE: 5FT W X 45FT
L X 1"THK, MIL-DTL-32585,
TYPE I, FORM 3, FACING A,
NSN: 5640-00-173-6591 (NSN
MISTAKENLY INDICATES
FACING D, BUT CORRECT
ITEM IN THIS NSN IS
UNFACED.)
ORIG:CODE 234 M.EGUCHI,
243-0978
ORDERED FOR KTR
9Q 5640 LL9607458 NA 4 N 41657404 2/RO
408 M GASKET MATERIAL,SHE, C234
M. EGUCHI, 243-0978
ORDERED FOR KTR
GASKET 1/16 3125SS
9B 5330 015287526 NA 4 N 41645294 2/SH
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 STRL MBR 4-109-7-Q AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P13411 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 STRL MBR 4-109-7-Q AY A 0
LOCATION MAP OF WELD REPAIR IN 4-109-7-Q
SKETCH
ENCLOSURE-013819P13411A01 SHEET 1 OF 14
ENCLOSURE-013819P13411A01 SHEET 2 OF 14
ENCLOSURE-013819P13411A01 SHEET 3 OF 14
ENCLOSURE-013819P13411A01 SHEET 4 OF 14
ENCLOSURE-013819P13411A01 SHEET 5 OF 14
ENCLOSURE-013819P13411A01 SHEET 6 OF 14
ENCLOSURE-013819P13411A01 SHEET 7 OF 14
ENCLOSURE-013819P13411A01 SHEET 8 OF 14
ENCLOSURE-013819P13411A01 SHEET 9 OF 14
ENCLOSURE-013819P13411A01 SHEET 10 OF 14
ENCLOSURE-013819P13411A01 SHEET 11 OF 14
ENCLOSURE-013819P13411A01 SHEET 12 OF 14
ENCLOSURE-013819P13411A01 SHEET 13 OF 14
ENCLOSURE-013819P13411A01 SHEET 14 OF 14