TGI_3819P12350A01_c0v0.pdf

PDF 94 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 3 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA024
Issued by

About this file

This document is a Task Group Instruction (TGI) for cleaning, inspecting, repairing, and preserving the Oily Water Bilge Sump (Tank 9-87-1-W) on the USS BLUE RIDGE (LCC-19). The work is located in the Engine Room and involves a comprehensive maintenance process including visual inspection of existing preservation coating, marking corroded or damaged areas, general cleaning at Level III, manhole cover installation, and structural repairs. Specific repair requirements include welding one linear foot of deteriorated welds, base metal weld buildup of 60 square inches, removal and replacement of 10 square feet of deteriorated plate, and 4 linear feet of defective stiffener.

The work is scheduled to begin on 1/12/2026 and complete by 5/15/2027, with the contractor responsible for detailed documentation, nondestructive testing, and adherence to specified technical standards. Special requirements include SURFMEPP cleanliness standards and fabrication of a non-flammable closure due to work affecting a fire zone boundary. The task involves multiple shop disciplines including labor, welding, carpentry, painting, and quality assurance, with support services from SRF-JRMC including crane rigging, utility services, and technical inspections.

View the file

Other files

File Type Posted
TGI_3819P51403A01_c0v0_FY26.pdf PDF
TGI_3819P26202_A01_c0v0_FY26.pdf PDF
TGI_3819P25604A01_c1v1_FY26.pdf PDF
TGI_3819P22103A01_c0v0_FY26.pdf PDF
TGI_3819P14121A01_c0v0_FY26.pdf PDF
TGI_3819P13507A01_c0v0_FY26.pdf PDF
TGI_3819P12351A01_c0v0_FY26.pdf PDF
TGI_3819P12333A01_c0v0_FY26.pdf PDF
TGI_3819P12331A01_c1v1_FY26.pdf PDF
TGI_3819P12315A01_c0v0_FY26.pdf PDF
TGI_3819P12314A01_0c0v0_FY26.pdf PDF
TGI_3819P12309A01_c1v0_FY26.pdf PDF
TGI_3819P12303A01_c1v0_FY26.pdf PDF
TGI_3819P12302A01_c2v2_FY26.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment II Price Proposal Form N6264925RA024.xlsx XLSX spreadsheet
TGI_3819P25502_A01_c0v0.pdf PDF
TGI_3819P22101_T09_c0v0.pdf PDF
TGI_3819P14208T02_c0v0.pdf PDF
TGI_3819P14204A01_c0v0.pdf PDF
TGI_3819P13507A01_c0v0.pdf PDF
TGI_3819P13505A01_c0v0.pdf PDF
TGI_3819P12389A01_c0v0.pdf PDF
TGI_3819P12360A01_c0v0.pdf PDF
TGI_3819P12359_A01_c0v0.pdf PDF
TGI_3819P12358_A01_c0v0.pdf PDF
TGI_3819P12353_A01_c1v0.pdf PDF
TGI_3819P12343A01_c1v1.pdf PDF
TGI_3819P12334T01_c0v0.pdf PDF
TGI_3819P12333A01_c0v0.pdf PDF
TGI_3819P12329A01_c1v1.pdf PDF
TGI_3819P12322_A01_c2v1.pdf PDF
TGI_3819P12319A01_c0v0.pdf PDF
TGI_3819P12308A01_c0v0.pdf PDF
TGI_3819P12303A01_c1v0.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P23103_A03_c0v0.pdf PDF
TGI_3819P22102_T01_c0v0.pdf PDF
TGI_3819P14208T01_c0v0.pdf PDF
TGI_3819P14208A01_c1v1.pdf PDF
TGI_3819P14122A01_c0v0.pdf PDF
TGI_3819P14121A01_c0v0.pdf PDF
TGI_3819P13422A01_c0v0.pdf PDF
TGI_3819P13411A01_c1v1.pdf PDF
TGI_3819P12351A01_c0v0.pdf PDF
TGI_3819P12347_A01_c0v0.pdf PDF
TGI_3819P12345_A01_c1v3.pdf PDF
TGI_3819P12332A01_c1v1.pdf PDF
TGI_3819P12327_A01_c1v1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: TANK 9-87-1-W AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PSV OILY WATER BILGE SUMP (9-87-1-W)

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

TOORU SUZUKI 231B. 315-243-7793 17-JAN-2024

APPROVED BY: CODE PHONE DATE

RYOUTA TAKAGI 231B. 315-243-4502 17-JAN-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

SURFMEPP

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: TANK 9-87-1-W AY A 0

FOUO

SHIP: LCC-19 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J-1 M-1

1. SCOPE/PURPOSE

1.1 Title: Oily Water Bilge Sump 9-87-1-W; clean, inspect, repair, and preserve

1.2 Location of Work:

1.2.1 Engine Room (8-86-0-E)

1.2.2 Oily Water Bilge Sump (9-87-1-W)

1.3 Identification:

1.3.1 Quantity (One EA), Oily Water Bilge Sump

Tank No.:9-87-1-W Capacity: 150 Gallons

1.3.2 Quantity (One EA), Manhole Cover Plate for 9-87-1-W

Manhole No(s). : 8-87-1 Size: 15 Inches x 23 Inches Material: Steel

1.3.3 Quantity (One EA), Bolting Ring of Manhole for 9-87-1-W Manhole No(s). : 8-87-1 Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

4 DWG 101-

2491012

CVK & Shell Long AFT FR 51 1/2 L Y AL L

5 DWG 101-

2491013

Floors FR 8-98 S Y 24, 5/15/2027

1/12/2026

FOUO

SHIP: LCC-19 CHG/VER: 0/0

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.

5.1.1 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating.

5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.

5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR.

5.1.2 Accomplish the requirements of 009-107 of 2.1.

5.1.2.1 Ensure General Cleaning must be Level III.

5.1.3 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.

5.2 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.4 and 2.5 for guidance See 5.7.4 through 5.7.6.

5.2.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair may include deck, bulkhead, shell plating, and overhead.

5.2.2 Chip and grind each surface flush in way of each repair.

5.2.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.

5.2.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.

5.2.3.2 Surface must be ground to sound metal prior to base metal weld buildup.

5.2.3.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.

5.2.3.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.

5.2.4 Remove existing, fabricate and install new a total of 10 square feet of deteriorated plate.

5.2.5 Remove existing, fabricate, and install new a total of 4 linear feet of defective stiffener.

5.2.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.

5.2.6.1 Accomplish nondestructive testing in accordance with Line 11.

FOUO

SHIP: LCC-19 CHG/VER: 0/0

5.2.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.

5.3 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.2.

5.4 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.

5.5 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for a total of 4 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.

5.5.1 The preservation area must not exceed 4 square feet per one area.

5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.7 Notes:

5.7.1 Planner: Code 231B T. Suzuki, 243-7793

5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.7.3 This TGI meets the intent of DDG CSWT File Nos. 123-133, 123-142, and 123-143.

5.7.4 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12350I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.

5.7.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.7.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.7.7 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.7.8 JCNs EB14-ZA53, EB14-ZA56, and EB14-ZA57 are related to this TGI.

5.8 Government Furnished Material (GFM): None.

5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P12350S02)

5.9.1 [C740] Crane and crane rigging service.

5.9.2 [X99E] Utility service, electrical.

5.9.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.

FOUO

SHIP: LCC-19 CHG/VER: 0/0

5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.9.6 [C133] QA inspection for (G) symbol(s).

5.9.7 [C135] QA inspection for (G) symbol(s).

5.9.8 [C250] Technical support.

FOUO

J-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

TANK 9-87-1-W AY A 0 0

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PSV OILY WATER BILGE SUMP (9-87-1-W)

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

MANHOLE 8-87-1 HA WO 9-87-1-W TK

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

3819P12350 A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to clean, inspect, repair, and preserve oily water bilge sump (9-87-1-W).

Location of Work:

Engine Room (8-86-0-E) Oily Water Bilge Sump (9-87-1-W)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 LBR HRs, SFTR HRs, PNTR HRs 22 KE PC

5.2 SFTR HRs, WELD HRs, CARP HRs, PNTR HRs, QA HRs 22 KE PC

5.3 PNTR HRs, QA Rs 22 KE PC

5.4 PNTR HRs, QA HRs 22 KE PC

5.5 PNTR HRs, QA HRs 22 KE PC

5.6 PNTR HRs, QA HRs 22 KE PC

Dewatering and Cleaning Work CFM marine chemist, gaskets, fasteners, tank watch cost, and MISC.

22 MQ CS

Structural Work CFM for fire watch and tank watch cost, MT inspection cost, lead sampling/analysis cost, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure, covering material, and other consumable.

22 MQ CS

Preservation Work CFM for all paints, thinner, grits, disposal cost, tank watch cost, and MISC such as covering material and other consumable.

22 MQ CS

Process Funding Document. 10 CT OM

FOUO

M-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

TANK 9-87-1-W AY A 0 0

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PSV OILY WATER BILGE SUMP (9-87-1-W)

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

3819P12350 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 TANK 9-87-1-W AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

3819P12350 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 TANK 9-87-1-W AY A 0

File details come from the government source that posted it. Updated .