TGI_3819P12334T01_c0v0.pdf
PDF 24 KB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 19-AUG-2024, focusing on a Propulsion Reduction Gear, Shaft No. 1 Tightness & Operational Test. The TGI details specific work tasks for three groups: Contractor (22/KE), Quality Assurance (33/G1), and Support/Facilities (EM01), all of whom are required to accomplish and document the tightness and operational test in accordance with reference document TP 24111-3-300KTR. The instruction includes reference documents, task descriptions, and provides a framework for executing the specific maintenance and testing procedure for the ship's propulsion system.
The TGI is part of a larger naval maintenance effort for the USS Blue Ridge (LCC-19), with key personnel including Yoshiyuki Sato (Prepared By), John Blewitt (Approved By), and Takehide Yaginuma (Zone Manager). The document is marked FOUO (For Official Use Only) and contains detailed administrative and technical information to guide the execution of the specific maintenance task on the ship's propulsion reduction gear.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
19-AUG-2024 1422
20.14.12.0.8874 (April 2024) ICN: 3819P12334 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 24111-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 24111
CU PHASE TITLE: PROPULSION REDUCTION GEAR, SHAFT NO.1 (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01ZAL4 * EM01ZAL5 * ER01ZAO6 * ES01NP9Z
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SATO, YOSHIYUKI 246.2 3152434596 01-MAY-2024
APPROVED BY: CODE: PHONE: DATE:
BLEWITT, JOHN 246.2 3152438280 15-MAY-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAL4 * EM01-ZAL5 * ER01-ZAO6 * ES01-NP9Z
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A1534
Tightness & Operational Test for Main Reduction Gear - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
19-AUG-2024 1422
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P12334 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 24111-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 24111
CU PHASE TITLE: PROPULSION REDUCTION GEAR, SHAFT NO.1 (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 24111-3-300KTR PROPULSION REDUCTION
GEAR, SHAFT NO.1 (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 24111-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 24111-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 24111-3-300KTR.
/ EM01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P12334 KEY OP: T01