Attachment II Price Proposal Form N6264925RA024.xlsx
XLSX spreadsheet 581 KB Posted
- Solicitation number
- N6264925RA024
About this file
This file is a Price Proposal Form for a naval ship repair and maintenance contract for the USS BLUE RIDGE (LCC-19) located in Yokosuka, Japan. The solicitation (N6264925RA024) covers 82 specific Task Group Instructions (TGIs) involving comprehensive maintenance tasks such as cleaning, inspecting, repairing, and preserving various shipboard tanks, systems, and structural components, including fuel oil service tanks, water tanks, lube oil systems, watertight hatches, deck coverings, and boiler systems.
The contract period of performance is from 12 January 2026 through 13 December 2027, with the work to be performed at Commander, Fleet Activities Yokosuka Naval Base. Offerors must submit proposals by 16 June 2025 at 10:00 AM Japan Standard Time, with preliminary access requests required by 9 June 2025. The solicitation is specifically intended for sources authorized to operate in Japan and will be executed through the Department of the Navy Naval Supply Systems Command, with file access restricted to a secure DoD SAFE repository.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264925RA024 | CLIN 0001(82 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP NAME: | USS BLUE RIDGE (LCC-19) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| AVAILABILITY: | 5C1 DSRA | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 82 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 15.21% |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 3819P12301A01 | Clean and Repair Fuel Oil Service Tank No. 1A (5-122-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 3819P12302A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel Service (7-82-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 3819P12303A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel Service (7-82-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 3819P12306A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel Overflow or Ballast (9-121-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 3819P12307A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-121-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 3819P12308A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-127-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 3819P12309A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-127-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 3819P12313A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel Overflow or Ballast (9-30-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 3819P12314A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-30-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 3819P12315A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-30-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 3819P12319A01 | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-86-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 3819P12322A01 | Clean, Inspect, Repair, and Preserve Reserve Feed Water Tank (9-79-1-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 3819P12324A01 | Clean, Inspect, Repair, and Preserve Potable Water Tank (9-76-1-W) and (9-76-2-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 3819P12325A01 | Clean, Inspect, Repair, and Preserve Potable Water Tank (9-76-3-W) and (9-76-4-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 3819P12326A01 | Clean, Inspect, Repair, and Preserve Potable Water Tank (9-83-1-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 3819P12327A01 | Clean and Repair Lube Oil Storage Tank (7-39-7-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 3819P12328A01 | Clean and Repair Lube Oil Settling Tank 1A (7-97-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 3819P12329A01 | Clean and Repair Lube Oil Settling Tank 1B (7-97-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 3819P12330A01 | Clean and Repair Lube Oil Storage Tank 1A (7-97-6-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 3819P12331A01 | Clean and Repair Lube Oil Storage Tank 1B (7-97-8-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 3819P12332A01 | Clean and Repair Lube Oil Storage Tank 1C (7-97-10-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 3819P12333A01 | Clean and Repair Lube Oil Storage Tank (7-117-3-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 23 | 3819P12334A01 | Clean, Assess, and Repair Lube Oil Sump Tank (8-94-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 3819P12334T01 | Tightness & Operational Test for Main Reduction Gear - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 3819P12343A01 | Repair and Preserve Structural Member and Overboard Discharge Piping in Fresh Water Ballast (9-86-5-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 3819P12345A01 | Clean, Inspect, Repair, and Preserve Used Lube Oil Sump (6-122-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 27 | 3819P12346A01 | Clean, Inspect, Repair, and Preserve Oily Waste Tank (6-124-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 3819P12347A01 | Clean, Inspect, Repair, and Preserve Fuel Oil Drain Tank (6-126-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 3819P12348A01 | Clean, Inspect, Repair, and Preserve Contaminated Distillate Fuel (7-80-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 30 | 3819P12349A01 | Clean, Inspect, Repair, and Preserve Oily Water Bilge Sump (9-84-2-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 31 | 3819P12350A01 | Clean, Inspect, Repair, and Preserve Oily Water Bilge Sump 9-87-1-W | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | 3819P12351A01 | Clean, Inspect, Repair, and Preserve Oily Waste Holding Tank (9-90-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 33 | 3819P12352A01 | Clean, Inspect, Repair, and Preserve Waste Oil Tank (9-94-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 34 | 3819P12353A01 | Clean, Inspect, Repair, and Preserve Grey Water Tank (6-125-1-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 35 | 3819P12358A01 | Clean, Inspect, Repair, and Preserve Void (9-81-1-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 36 | 3819P12359A01 | Clean, Inspect, Repair, and Preserve Void (9-82-4-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 37 | 3819P12360A01 | Clean, Inspect, Repair, and Preserve Cofferdam (9-86-3-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 38 | 3819P12361A01 | Clean, Inspect, Repair, and Preserve Cofferdam (9-86-4-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 39 | 3819P12389A01 | Repair Vertical Ladder and Incomplete Weld on Bracket in 9-83-2-W | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 40 | 3819P13327A01 | Overhaul and Replace Watertight Hatch 3-101-1 and Lifeline/Guardline Assembly | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 41 | 3819P13327T01 | Static Load Test for Liferail Stanchion - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 42 | 3819P13339A01 | Overhaul and Replace Watertight Hatch 3-101-2 and Lifeline/Guardline Assembly | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 43 | 3819P13339T01 | Static Load Test for Liferail Stanchion - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 44 | 3819P13411A01 | Repair and Preserve Structural Member in 4-109-7-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 45 | 3819P13422A01 | Replace Deck Covering in 4-133-3-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 46 | 3819P13505A01 | Repair and Preserve Transverse Bulkhead Plate Frame 133 and Ship Service Diesel Generator (SSDG) Combustion Air Plenum | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 47 | 3819P13507A01 | Replace Deck Covering System in 5-133-1-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 48 | 3819P14113A01 | Accomplish Repair and Preservation of Deck Plating in 6-76-2-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 49 | 3819P14114A01 | Repair Gouge on Bulkhead Plating Frame 86 in 6-86-1-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 50 | 3819P14115A01 | Repair and Preserve Bulkhead Plate Frame 98 in 6-86-2-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 51 | 3819P14116A01 | Repair Gouge on Transverse Bulkhead Plating Frame 109 in 6-106-1-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 52 | 3819P14117A01 | Preserve Shell Plating in 6-109-1-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 53 | 3819P14121A01 | Replace Deck Covering in 6-109-1-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 54 | 3819P14122A01 | Replace Electrical Grade Sheet Deck Covering System in 6-30-2-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 55 | 3819P14204A01 | Repair Structural Member in 7-30-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 56 | 3819P14205A01 | Inspect, Repair, and Preserve Structural Member in 7-109-1-E and 7-106-1-K | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 57 | 3819P14207A01 | Repair Structural Member in 8-76-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 58 | 3819P14207T01 | Tightness & Operational Test for Potable Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 59 | 3819P14208A01 | Repair Structural Member in 8-86-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 60 | 3819P14208T01 | Tightness & Operational Test with Vib-cut for CHT PUMP #4 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 61 | 3819P14208T02 | Tightness & Operational Test for Sewage System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 62 | 3819P16719A02 | Replace Watertight Hatch 5-110-1 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 63 | 3819P22101A01 | Accomplish 1A Boiler 5 Year Inspection Support | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 64 | 3819P22101T01 | Tightness & Operational test for 1A Boiler - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 65 | 3819P22101T02 | Tightness & Operational Test for Aux Steam System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 66 | 3819P22101T06 | Tightness & Operational Test for Fuel Oil Services, Piping & MISC (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 67 | 3819P22101T08 | Tightness and Operational Test for Boiler Blow System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 68 | 3819P22101T09 | Tightness & Operational Test for 1A Boiler, Air Casing - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 69 | 3819P22102A01 | Accomplish 1B Boiler 5 Year Inspection Support | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 70 | 3819P22102T01 | Tightness & Operational Test for 1B Boiler - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 71 | 3819P22102T02 | Tightness & Operational Test for Aux Steam System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 72 | 3819P22102T06 | Tightness & Operational Test for Fuel Oil Services System, Piping & MISC (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 73 | 3819P22102T08 | Tightness and Operational Test for Boiler Blow System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 74 | 3819P22102T09 | Tightness & Operational Test for 1B Boiler, Air Casing - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 75 | 3819P22103A01 | Accomplish Asbestos Contain Material (ACM) Removal and New Lagging Pad Installation of 1A and 1B Boiler | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 76 | 3819P23103A03 | Accomplish Installation, Modification, and Removal of Temporary Cleanliness Enclosure in 8-86-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 77 | 3819P25502A01 | Accomplish Onboard Radiographic Test (RT) Inspection of Piping Welded Joint | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 78 | 3819P25604A01 | Install Indicator and Collar for Main Circ Pump Suction Valve MSW-E1 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 79 | 3819P26201A01 | Clean Lube Oil Sump Tank Level Indicator | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 80 | 3819P26202A01 | Accomplish Main Engine Lube Oil System Flushing | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 81 | 3819P26202T01 | Tightness & Operational Test for Main Lube Oil System #1 - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 82 | 3819P51403A01 | Accomplish No. 3 Air Conditioning (A/C) Plant Condenser Mechanical Cleaning | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 83 | |||||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 |
1_3819P12301A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 1_3819P12301A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Fuel Oil Service Tank No. 1A (5-122-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_3819P12302A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 2_3819P12302A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel Service (7-82-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_3819P12303A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 3_3819P12303A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel Service (7-82-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_3819P12306A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 4_3819P12306A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel Overflow or Ballast (9-121-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_3819P12307A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 5_3819P12307A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-121-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_3819P12308A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 6_3819P12308A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-127-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_3819P12309A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 7_3819P12309A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-127-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_3819P12313A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 8_3819P12313A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel Overflow or Ballast (9-30-0-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_3819P12314A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 9_3819P12314A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-30-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_3819P12315A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 10_3819P12315A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-30-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_3819P12319A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 11_3819P12319A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Distillate Fuel or Ballast (9-86-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_3819P12322A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 12_3819P12322A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Reserve Feed Water Tank (9-79-1-W) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_3819P12324A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 13_3819P12324A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Potable Water Tank (9-76-1-W) and (9-76-2-W) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_3819P12325A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 14_3819P12325A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Potable Water Tank (9-76-3-W) and (9-76-4-W) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_3819P12326A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 15_3819P12326A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Potable Water Tank (9-83-1-W) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_3819P12327A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 16_3819P12327A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Storage Tank (7-39-7-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_3819P12328A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 17_3819P12328A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Settling Tank 1A (7-97-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_3819P12329A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 18_3819P12329A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Settling Tank 1B (7-97-4-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_3819P12330A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 19_3819P12330A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Storage Tank 1A (7-97-6-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_3819P12331A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 20_3819P12331A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Storage Tank 1B (7-97-8-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_3819P12332A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 21_3819P12332A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Storage Tank 1C (7-97-10-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_3819P12333A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 22_3819P12333A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean and Repair Lube Oil Storage Tank (7-117-3-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_3819P12334A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 23_3819P12334A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, and Repair Lube Oil Sump Tank (8-94-0-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_3819P12334T01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 24_3819P12334T01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Main Reduction Gear - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
25_3819P12343A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 25_3819P12343A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Repair and Preserve Structural Member and Overboard Discharge Piping in Fresh Water Ballast (9-86-5-W) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
26_3819P12345A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 26_3819P12345A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Used Lube Oil Sump (6-122-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
27_3819P12346A01
| SHIP NAME/AVAILABILITY: | USS BLUE RIDGE (LCC-19) - 5C1 DSRA | TGI SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA024 | ||||||||||
| SRF-JRMC TGI #: | 27_3819P12346A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Inspect, Repair, and Preserve Oily Waste Tank (6-124-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .