This Task Group Instruction (TGI) details a deck covering replacement project for the USS Blue Ridge (LCC-19) in the Ships Service Diesel Generator Vestibule (4-133-3-L). The project involves removing 36 square feet of existing chemical-resistant flooring and installing a new chemical-resistant flooring system with MIL-PRF-32584, Type IV specifications, featuring a 720 Medium blue color coat with white flake. Additionally, 52 square feet of deck plating, including vertical structural surfaces, will be prepared.
The project is scheduled for contractor work from January 12, 2026, to June 12, 2027, with the SRF-JRMC providing supporting services including crane and rigging, utility services (electrical, air, water, steam), and safety and quality assurance inspections. The work involves potential asbestos and lead hazards, and requires careful preparation of deck surfaces using primer conforming to MIL-PRF-23236, Type V, VI, or VII. The project is part of a larger naval maintenance effort for the USS Blue Ridge at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
22-AUG-2024 1112
20.14.15.0.8993 (August 2024) ICN: 3819P13422 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-133-3-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 4-133-3-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
EA028888
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KUROKAWA, NAOKI 231B 3152430108 06-JUL-2024
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 06-JUL-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EA02-8888
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 4-133-3-L 4 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
134A0022
1. SCOPE/PURPOSE:
1.1 Title: Deck Covering in 4-133-3-L; replace
1.2 Location of Work:
1.2.1 Ships Service Diesel Generator Vestibule (4-133-3-L)
1.3 Identification:
1.3.1 Quantity (36 SF), Chemical-Resistant Floorings System [Existing]
1.3.2 Quantity (36 SF), Chemical-Resistant Floorings System
Specification: MIL-PRF-32584, Type IV Color: 720 Medium blue color coat with white flake
1.3.3 Quantity (52 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-
TGI Short Form
22-AUG-2024 1112
20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P13422 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-133-3-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 4-133-3-L
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
resistant floorings system level
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Hazard
1.6 Contractor Work start date: 1/12/2026
1.7 Contractor Work completion date: 6/12/2027
2. PROCEDURE:
2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.
2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.2 Notes:
2.2.1 Planner: Code 231B N. Kurokawa, 243-0108
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN EA02-8888 is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 3819P13422S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
22-AUG-2024 1112
20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P13422 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-133-3-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 4-133-3-L
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 PNTR HRs, QA HRs 22/KE PC N
Deck Covering Work CFM: $ for all deck covering, paints, thinners, asbestos and lead sampling/analysis cost, and MISC such as covering material and other consumable.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P13422 KEY OP: A01
File details come from the government source that posted it. Updated .