This Task Group Instruction (TGI) details the installation, modification, and removal of a temporary cleanliness enclosure in the Engine Room (8-86-0-E) of the USS Blue Ridge at Naval Base Yokosuka, Japan. The work is scheduled from January 12, 2026, to May 15, 2027, and involves fabricating, installing, modifying, and removing scaffolding and enclosure structures in accordance with specified references, including NAVSEA Standard Items and scaffolding regulations.
The TGI outlines specific procedural requirements for the contractor, including precise installation and modification guidelines. SRF-JRMC will provide supporting services such as crane and rigger services, utility services (electrical, air, water, steam), safety inspections, gas-free inspections, and quality assurance inspections. The work will be performed by RGRS and CARP hours, with tasks tracked through various shop/TSD codes and will require processing of funding documents and covering materials.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
30-AUG-2024 1550
20.14.15.0.8998 (August 2024) ICN: 3819P23103 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-86-0-E MS A 5 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: F/O - ACCOMP INSTL, MOD, AND REM OF TEMP CLEANLINESS ENCL IN 8-86-0-E
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
EM01ZAN6 * EM01ZAN5
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KUROKAWA, NAOKI 231B 3152430108 10-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 10-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAN5 * EM01-ZAN6
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 8-86-0-E 8 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
231A1103
1. SCOPE/PURPOSE:
1.1 Title: Installation, Modification, and Removal of Temporary Cleanliness Enclosure in 8-86-0-E; accomplish
1.2 Location of Work:
1.2.1 Engine Room (8-86-0-E)
1.3 Identification:
1.3.1 Quantity (One Lot), Temporary Cleanliness Enclosure, including Scaffolding Assembly in 8-86-0-E
Remarks: See Sketch Enclosure-01 for location detail Modification of Enclosure, including Scaffolding Assembly up to One Time/Day
1.4 Security Classification: None.
TGI Short Form
30-AUG-2024 1550
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P23103 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-86-0-E MS A 5 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: F/O - ACCOMP INSTL, MOD, AND REM OF TEMP CLEANLINESS ENCL IN 8-86-0-E
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition: None.
1.6 Contractor Work start date: 1/12/2026
1.7 Contractor Work completion date: 5/15/2027
2. PROCEDURE:
2.1 Fabricate and install each temporary cleanliness enclosure listed in 1.3.1 in accordance with Ref. No. 3, using Enclosure-01 for guidance.
2.2 Modify each temporary cleanliness enclosure listed in 1.3.1 in accordance with Ref. No. 3, when requested by Project Team.
2.3 Remove each temporary cleanliness enclosure listed in 1.3.1 in accordance with Ref. No. 3, when requested by Project Team.
2.4 Notes:
2.4.1 Planner: Code 231B N. Kurokawa, 243-0108
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 Exact installation, modification, and removal date, area, and detail of temporary cleanliness enclosure listed 1.3.1 will be notified by the Project Team.
2.4.4 JCNs EM01-ZAN5 and EM01-ZAN6 are related to this TGI.
2.5 Government Furnished Material (GFM): None.
2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P23103S02)
2.6.1 [C740] Crane and crane rigger service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbol(s).
30-AUG-2024 1550
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P23103 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 8-86-0-E MS A 5 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: F/O - ACCOMP INSTL, MOD, AND REM OF TEMP CLEANLINESS ENCL IN 8-86-0-E
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 RGRS HRs, CARP HRs 22/KE PC N
2.2 RGRS HRs, CARP HRs 22/KE PC N
2.3 RGRS HRs, CARP HRs 22/KE PC N
CFM for covering material and MISC such as and other consumable.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P23103A03-Sketch.pdf 10-AUG-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P23103 KEY OP: A03
Sheet 1 of 1
SKETCH
ENCLOSURE-013819P23103A03
PLAN VIEW
8-86-0-E
Naoki.Kurokawa.ja Line
Naoki.Kurokawa.ja_1 Line