About this file
This is a Request for Proposal (RFP) issued by Swartz Creek Community Schools in Michigan for network cabling additions across multiple school facilities. The project involves installing Category 6A cabling infrastructure for classroom technology, including two cables per classroom (one terminated at the front of the room and one coiled in the ceiling), replacement of network cabinets that lack expansion room, installation of cabinet rails, and implementation of proper bonding and grounding solutions in IDFs and MDFs. The RFP was released on January 30, 2025, with a mandatory bidder's conference scheduled for February 6, 2025. Final questions are due February 13, 2025, with bid proposals due February 27, 2025. Contract award is scheduled for March 7, 2025, with project work to begin April 1, 2025 and complete by August 13, 2025.
The project requires a bid security of 5% of the maximum bid proposal amount, performance and labor/material payment bonds at 100% of the contract sum, and proof of insurance with minimum coverage of $1-2 million based on project value. Two voluntary alternates are included: replacement of multi-mode fiber between IDFs/MDFs with single mode fiber, and removal of old cabling from two computer labs at the high school. The project must qualify for E-Rate funding under FY2025 universal service support mechanism, requiring bidders to include their Service Provider Identification Number (SPIN). The scope covers six school facilities: Swartz Creek High School, Swartz Creek Middle School, and Dieck, Elms Road, Gaines, and Morrish Elementary Schools.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/30/2025
Request for Proposal
Network Cabling Additions
For
Swartz Creek Community Schools 8354 Cappy Lane, Swartz Creek, MI 48473
Prepared by
Convergent Technology Partners, LLC 6197 Miller Rd, Swartz Creek, MI 48473
810.720.3820 www.ctpartners.net http://www.ctpartners.net/
Back to top Page 2 of 78
TABLE OF CONTENTS
SECTION 00 30 00 – BIDDING REQUIREMENTS – INSTRUCTION TO BIDDERS
SECTION 00 30 10 - SCHEDULE OF EVENTS
SECTION 00 40 10 - BID PROPOSAL FORM
SUPPLEMENTAL A - COST ANALYSIS WORKSHEET
SUPPLEMENTAL B - UNIT PRICING
SUPPLEMENTAL C - MANDATORY ALTERNATES
SUPPLEMENTAL E - FAMILIAL DISCLOSURE AFFIDAVIT
SUPPLEMENTAL F - IRAN ECONOMIC SANCTIONS ACT
SECTION 27 00 00 STRUCTURED CABLING SYSTEMS OVERVIEW
SECTION 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS
SECTION 27 05 26 BONDING & GROUNDING FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 28 COMMUNICATIONS PATHWAYS
SECTION 27 10 10 STRUCTURED CABLING SYSTEMS (SCS)
SECTION 27 13 00 COMMUNICATIONS OPTICAL FIBER BACKBONE
SECTION 27 15 00 COMMUNICATIONS ROOM FITTINGS
Back to top Page 3 of 78
SECTION 00 30 00 – BIDDING REQUIREMENTS – INSTRUCTION TO BIDDERS
PART 1 - GENERAL
1.1 INTRODUCTION
A. The Swartz Creek Community Schools is seeking bids and proposals for a new cabling infrastructure in for classroom technology.
B. Bid documents may be obtained on the State of Michigan’s web site at www.Michigan.gov/VSSlogin or https://www.swartzcreek.org/page/eraterfp.
1.2 Due per the Schedule of Events, the Owner will receive bid proposals for the project. The Owner will not consider or accept a bid proposal received after the due date for bid proposal submission. The Owner is not responsible for any postal or delivery delays. No email, facsimile or other electronic bid proposals will be accepted. All bid proposals received after the due date will be returned by making them available to the respective Bidder, unopened, for said Bidder to pick up at their sole cost and expense. Bid proposals shall be submitted to:
Travis Smith Executive Director of Technology Swartz Creek Community Schools
8354 Cappy Lane, Swartz Creek, MI 48473
1.3 PROPOSALS/QUOTES
A. Two (2) “hard” copies and two (2) electronic copies on a USB “flash” drive of each complete proposal are to be submitted in sealed packaging, clearly marked: “Network Infrastructure Additions Sealed Bid” for Swartz Creek Community Schools and shall be identified with the Bidder’s name and address and the date and time of the bid proposal opening. The Owner is not responsible for any postal or delivery delays. No email, facsimile or other electronic bid proposals will be accepted.
B. Proposals will be opened immediately following the due date of the proposals.
C. The hard copy with the original bid Bond shall be conspicuously labeled on the exterior of the proposal stating “ORIGINAL”. All other copies shall be labeled “COPY”.
1.4 PROPOSAL FORMAT
A. The Bid response shall be structured as follows:
1. Section 1 – Submittal Letter, Executive Summary and Bid Bond
2. Section 2 – Proposal Forms and Bill of Materials with Installed Pricing
3. Section 3 – Narratives, System Description, Information, and Brochures
4. Section 4 - Bidder Qualifications, References
5. Section 5 – Sample Bidder’s Maintenance Contract
B. The “hard copy” Bids shall be submitted on 8 1/2" by 11" paper, single sided, single spaced using 10 to 12-point print, in 3 ring binders, clearly labeled to show the Bidder's name.
C. The electronic Bid shall be in the same structure and individual sections as the “hard copy” Bids, bound in .pdf files per section above, submitted on an USB “flash”, “Thumb” or similar drive with the hard copies. The electronic copy shall provide an exact duplicate of the information provided in the hard copy vice versa.
1.5 SECURITY
A. Each bid proposal must be accompanied by bid security in the form of a certified check or bid bond in the amount not less than 5% of the bid proposal amount, made payable to Swartz http://www.michigan.gov/VSSlogin https://www.swartzcreek.org/page/eraterfp
Back to top Page 4 of 78
Creek Community Schools or naming Swartz Creek Community Schools as the obligee. Bid bonds shall be issued by a company licensed to do business in the State of Michigan
1.6 INSURANCE REQUIREMENTS
A. The Owner requires that all bidders submit proof of insurance with the following requirements:
1. Swartz Creek Community Schools must be listed as an additional insured on the
Contractors General Liability Coverage. Bidders must agree to this in their Bid.
2. Provide Swartz Creek Community Schools with a copy of the Proof of General Liability
Coverage from the Contractor with a minimum of $1,000,000 for projects with a value less than $1,000,000 and a minimum limit of $2,000,000 for projects with a value between $1,000,000 and $10,000,000. Bidders must agree to this in their proposal.
3. The Contractor must agree to hold the Owner harmless and to indemnify the Owner for losses from Contractor negligence as follows:
a. The waiver of subrogation clause in the AIA contract (A-201 or A-232) “General
Conditions, and/or any other contract regarding this project, must be deleted.
b. The parties agree that the Owner is not waiving any rights its insurers may have to subrogation. To the extent any term in the Agreement is contrary to this provision, such term is void and unenforceable.
1.7 FAMILIAL DISCLOSURE AFFIDAVIT
A. Each bid proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the Bidder and any member of the Board of Education or the Superintendent of Swartz Creek Community Schools.
The Board of Education will not accept a bid proposal that does not include this sworn and notarized disclosure statement.
1.8 AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS
A. Each bid proposal must be accompanied by the Iran Economic Sanctions Affidavit of
Compliance in compliance with Michigan Public Act No. 517 of 2012. The Board of Education will not accept a bid proposal that does not include this sworn and notarized disclosure statement.
1.9 RESERVATION OF RIGHTS
A. The Owner reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFP), to accept or reject, in whole or in part, any or all bid proposal with or without cause, to waive any irregularities or informalities in this RFP process or any bid proposal, and to award the contract to other than the low bidder, when in the opinion of the Owner, such action will best serve the Owner's interests.
1.10 WITHDRAWAL OF BID PROPOSALS/QUOTES
A. All bid proposals submitted shall not be withdrawn and shall be irrevocable for a minimum period of ninety (90) calendar days following the due date for receipt of bid proposals set forth above.
1.11 REQUESTS FOR CLARIFICATION
A. Bidders may request that the Owner clarify information contained in this RFP. All such requests must be made in writing via email to Douglas Ford, Convergent Technology Partners, at dford@ctpartners.net. Requests for Clarifications and inquiries may only be made via email.
The deadline for all Requests for Clarification is per the date and time indicated in the schedule of events. The aggregated answers to all Requests for Clarification will be provided in an addendum to the RFP which will be issued and posted on the Purchasing page of the State of Michigan’s web site at www.Michigan.gov/VSSlogin and the Error! Reference source not
Back to top Page 5 of 78 found. website no later than three (3) business days prior to the bid opening date for all potential proposers to view.
1.12 RESTRICTION ON COMMUNICATION
A. From the issue date of this RFP until a Contractor is selected and the contract is awarded a prospective Contractor shall not communicate about the subject of this RFP or a Contractor’s bid proposal with the Owner, its Board of Education, or any individual member, administrators, faculty, staff, students, or employees, except for additional requests for clarification in accordance with the paragraph above.
1.13 RELEASE OF CLAIMS
A. Each Bidder by submitting its Proposal releases the Owner from all claims arising out of, and related to, this RFP process and selection of a Contractor.
1.14 PROPOSAL COST
A. Respondents of this RFP are responsible for all costs incurred by them or others acting on their behalf in preparing or submitting a bid proposal, or otherwise responding to this RFP, or any negotiations incidental to its bid proposal or this RFP.
1.15 COLLUSIVE BIDDING
A. All Bidders certify that its bid proposal is made without any previous understanding, agreement or connection with any person, firm or corporation making a bid proposal for the same project and is in all respects fair, without outside control, collusion, fraud, or other illegal action.
1.16 DEFINITIONS
A. Bid Documents are defined as the Instructions to Bidders, Schedule of Events, this RFP, including all Supplemental forms, Attachments, Appendices, Specifications, Drawings and Addenda and the Contract.
B. Addenda are written or graphic instruments issued prior to the due date of bid proposals which modify or interpret the Bid Documents by additions, deletions, clarifications, or corrections. All Addenda issued to Bidders prior to the due date of bid proposals shall become part of the Bid Documents and all bid proposals are to include the Project/Work therein described. Each Bid Proposal submitted shall list all Addenda that have been received prior to the due date of bid proposals.
C. As used in these Instructions to Bidders, the term "Bid Proposal" means a bid proposal prepared and submitted in response to this RFP.
D. As used in these Instructions to Bidders, the term "PSC" refers to the Professional Service Contractor and means Convergent Technology Partners and its assigned representatives.
E. Throughout this RFP and Contract, the “Owner” or “Swartz Creek Community Schools” will be used to refer to Swartz Creek Community Schools and bidders submitting bid proposals will be referred to as "Bidders" or "Vendors” and a successful Bidder or Vendor will be referred to as a “Contractor” or “Integrator”.
1.17 BIDDER'S REPRESENTATION
A. Each Bidder, by submitting a Bid Proposal, represents that the Bidder has read and understands the Bid Documents and is familiar with the local conditions under which the project is to be performed. Bidders will be held to have physically reviewed and compared the Sites with Bid Documents and have satisfied themselves to all conditions affecting the execution of the Work/Project.
1.18 EXAMINATION OF BID DOCUMENTS
A. A Mandatory pre-bid walk through will be held per the Schedule of Events for the purpose of answering any questions from the Vendors and visiting the Site. The location of the Bidder’s conference is:
Back to top Page 6 of 78
8354 Cappy Lane, Swartz Creek, MI 48473
B. Before submitting a Bid Proposal, each Bidder shall examine the RFP documents carefully and shall read the Specifications and the Bid Documents. Each Bidder shall gather complete information prior to bidding as to existing conditions and limitations under which the Work/Project is to be performed and shall include in its Bid Proposal a sum to cover the cost of items necessary to perform the Work/Project as set forth in the Bid Documents.
C. No allowance or additional fees will be made to a Bidder because of lack of such examination or knowledge. The submission of a Bid Proposal will be considered as conclusive evidence that the Bidder has made such examination. An on-site-inspection of the Sites during the Bidder’s Conference will be for all Bidders.
D. Bidders may make written request to the PSC for interpretation or correction of any ambiguity, inconsistency or error in the Bid Documents that are discovered. These questions shall be submitted to the PSC per the Schedule of Events. Only a written interpretation or correction by Addendum shall be binding on Bidders. No explanations or interpretations requested or made orally will be considered binding. All questions will be responded to in writing and all addenda will be posted to the State of Michigan’s web site at www.Michigan.gov/VSSlogin and the Error! Reference source not found. website at https://www.swartzcreek.org/page/eraterfp.
1.19 SUBSTITUTIONS
A. Each Bid Proposal shall be based upon the materials and equipment described in the Bid
Documents. Please note material that are indicated no substitutions allowed.
B. Voluntary alternates as substitutions for materials and equipment will be considered and evaluated if the Base Bid includes specified materials and equipment. In addition to the Base Bid, the submission of voluntary alternates is acceptable. If a voluntary alternate is submitted for consideration, it shall be expressed on the Bid Form as an “add” or “deduct” amount from the Base Bid. If a voluntary alternate is submitted, the Bidder shall also submit sufficient information in the form of drawings, specifications, and a complete description of the proposed substitute, the cost savings, or advantages. Additionally, provide the name of the material or equipment for which it is substituted, drawings, cuts, performance and test data and any other data or information necessary for a complete evaluation, sufficient for analysis of the alternate. The Owner reserves the right to unilaterally accept or reject, in whole or in part, any voluntary alternates.
1.20 BIDDING PROCEDURES
A. All Bids Proposal must be submitted on the Bid Proposal Forms provided as part of the Bid
Documents and in accordance with the Advertisement to Bid and Instructions to Bidders.
Bidders must provide a complete list of proposed subcontractors (one per discipline) as indicated on the Bid Forms. Listing two or more subcontractors per discipline will be grounds for disqualification.
B. All Bidders must provide a proposal for the Base Bid that meets or exceeds the specifications set forth in this RFP. However, all Bidders may suggest voluntary alternates if it is felt that the alternate proposal better suits the intent of this RFP. Any alternate must be listed as such with separate pricing sheets. Any variance of the feature/functionality of the Base Bid must be identified in any alternates proposed.
C. Prior to the due date for bid proposals, any Addenda will be available for inspection wherever the Bid Documents are kept available for that purpose. No Addendum will be issued later than https://www.swartzcreek.org/page/eraterfp
Back to top Page 7 of 78 three (3) days prior to the due date for bid proposals. It is each Bidders responsibility to ascertain prior to submitting a Bid Proposal that he/she has received all Addenda issued and shall acknowledge their receipt in their Bid Proposal Form.
D. All Bids must be signed as follows:
1. Corporations: Signature of an officer of the firm who is authorized to bind the corporation.
2. Partnerships: Signature of one partner who is authorized to bind the firm and all its
Partners.
3. Bids submitted by Joint Ventures shall be signed by one of the Joint Ventures and shall be accompanied by a certified copy of the Power of Attorney authorizing the individual signing to bind all the Joint Ventures. If a certified copy of the Joint Venture's certificate submitted with the Bid Proposal indicates that all Joint Ventures have signed, no authorization is required.
4. Individuals signing on own behalf: No authorization is required.
5. Individual signing on behalf of another: Power of Attorney or comparable evidence of authority shall accompany Bid.
E. Bid proposals shall be prepared on unaltered Bid Forms, which are a part of this RFP. Bidders shall make no additional stipulations on the Bid Form nor qualify the Bid Proposal in any other manner. Unauthorized conditions, limitations, or provisions attached to the Bid Proposal will be cause for rejection of the Bid Proposal. If alterations by erasure or interlineations are made for any reason, explain over such erasure or interlineations with a signed statement from the Bidder. No additional charges, other than those listed on the Bid Proposal Form and Bid Supplemental Forms, shall be made. Prices quoted will include verification/coordination of order, all costs for shipping, delivery to all Sites, insurance, payment and performance bonds, unpacking, setup, installation, operation, testing, cleanup, training, and all other requirements contained in the bid documents.
F. Bids shall be submitted in a sealed envelope. Identified on the face of the envelope:
1. Project name
2. Name and address of Bidder
3. Notation “Network Infrastructure Additions Sealed Bid”
G. No responsibility shall attach to the PSC, the Owner, or the authorized representatives of either one, for the premature opening of any Bid Proposal which is not properly addressed, delivered and/or identified. In such event, that Bid Proposal will not be considered, and the Bidder will be automatically disqualified from consideration.
H. Negligence in preparation, improper preparation, errors in and/or omissions in the Bid Proposal shall not relieve the Bidder from fulfillment of all applicable obligations and requirements of contained in the Bid Documents.
I. The Owner or PSC in making copies available of the Bid Documents to Bidders do so only for the purpose of obtaining bid proposals on the project and do not confer a license or grant of use to a Bidder for any other purpose.
J. All Bidders must complete, sign, and return the attached “FAMILIAL DISCLOSURE” and “IRAN ECONOMIC SANCTIONS AFFIDAVITS” with their Bid Proposal.
K. Bidders must include a Bill of Material (BOM) per building, along with installed line-item pricing for all components proposed, including, but not limited to, maintenance and support with the total listed where indicated in the Bid Proposal Forms. Failure to provide the complete BOM with line-item pricing will result in disqualification of the Bid proposal. This does not preclude filling out the Unit Pricing Form Supplemental B.
Back to top Page 8 of 78
L. The Owner considers this RFP legally binding and will require that this Request for Proposal and the Bid Proposal be incorporated by reference into any subsequent Contract between the Contractor and the Owner. It should be understood by the Bidder that this means that the Owner expects the Bidder to satisfy all requirements and specifications contained in the RFP.
Any exceptions to the RFP must be explicitly noted in the Bid Proposal and accepted by the Owner. Lack of listing all exceptions will be considered acceptance of all specifications as presented in this RFP
1.21 UNIVERSAL SERVICE FUND (USF) CONDITIONS
A. The service provider’s USF Service Provider Identification Number (SPIN) must be included in the Bid
Proposal Form. Direct all questions regarding the USF requirements in this IFB to the Universal Service Administrative Company (USAC), Schools and Library Division (SLD) at (888) 203-8100.
B. The specified products and/or services are to be provided for FY2025 (July 1, 2025-June 30, 2026) and must qualify for universal service discounts under the FY2025 universal service support mechanism, E-Rate.
C. The USF eligible products and/or services identified on the USAC FY2025 Eligible Services List, and must be identified separately from any and all “ineligible” products and/or services in the Bid.
1.22 CONSIDERATION OF BIDS
A. The Bidder acknowledges the right of the Owner to accept or reject any or all Bid proposals, in whole or in part, with or without cause, to waive any irregularities or informalities in this RFP process or any Bid Proposal, and to award the contract to other than the low bidder. In addition, the Bidder recognizes the right of the Owner to reject a Bid Proposal:
1. If the Bidder fails to furnish any required Bid Security, or to submit the data and forms required by the Bid Documents; or
2. If the Bid Proposal is in any way incomplete or irregular; or
3. If the Bidder's performance was unsatisfactory under a prior contract for the construction, repair, modification, or demolition of a facility with the Owner, or a contractor in privacy of contract with the Owner, which was funded, directly or indirectly, by the Owner.
B. The Owner shall have the right to accept alternates in any order or combination and to determine the lowest qualified Bidder based on the sum of the base bid, revisions due to missing material and the alternates accepted.
C. Once the contract is awarded to the Contractor, the contract is contingent upon Board of Education approval and the Contractor providing the Owner with all documents required by the RFP prior to commencement of the Work/Project (i.e. Insurance Certificates, Labor and Material Payment Bond and Performance Bond, etc.). Further, the Owner reserves the unrestricted right to reduce the contract amount by reducing the scope of Work/project and/or components. Any such action will be taken before specific work on a building or on a project component has commenced. Contract amount shall be reduced or increased based on the unit pricing values.
D. Bidders to whom an award of a contract is under consideration shall submit to the Owner upon his/her request a properly executed Contractor's Qualification Statement, AIA Document A305 or other information format specified by the Owner.
1.23 BID SECURITY
A. The Bid Proposal shall be accompanied by a Bid Security of a certified check or cashier's check payable to the Owner or by a satisfactory Bid Bond Entity naming the Owner as the obligee and executed by the Bidder and a surety company authorized to do business in the State of
Back to top Page 9 of 78
Michigan, in an amount identified in the Instructions to Bidders. The check or amount of Bid Bond shall be forfeited to the Owner upon failure of the Contractor to enter into the Contract.
The Contractor's Bid security will be retained until the Contractor has signed the contract and has furnished the required Certificates of Insurance and other required Bonds and documents required by the RFP. Bonds signed by an Attorney-In-Fact must be accompanied by a certified and effectively dated copy of their Power of Attorney.
B. The Owner reserves the right to retain the Bid security of all Bidders until the Contractor enters into the contract or until ninety (90) days after bid opening, whichever is later. If the Contractor refuses to enter into the Contract, the Owner may retain their Bid Security as liquidated damages but not as a penalty.
1.24 PERFORMANCE, LABOR, AND MATERIAL PAYMENT BONDS
A. At or prior to delivery of the signed Contract, the Owner will require the Contractor to secure and post a Labor and Material Payment Bond and a Performance Bond including bonding for all subcontractors, each in the amount of 100% of the Contract Sum including bonding for all subcontractors. Surety shall be a company incorporated in the United States and must appear on the U.S. Treasury Departments approved surety list and be adaptable to the Owner. The Contractor shall obtain such bonds in a manner consistent with Michigan law.
1.25 TAXES
A. Installation services for the tangible personal property purchased by the Owner is not subject to sales taxation. Moreover, the Owner is exempt from taxation on all tangible personal property purchased by the Owner for its use and consumption; however, this exemption would not apply to any materials required under the Bid Documents that are deemed to be a component of a construction/improvement project to the Owner's Sites/Facilities. All prices submitted on the Bid Proposal Form shall be inclusive of all applicable taxes.
1.26 PERMITS AND FEES
A. All prices submitted on the Bid Proposal Form shall be inclusive of all applicable/required permits and fees.
1.27 MICHIGAN RIGHT-TO-KNOW LAW
A. All Contractors must conform to the provisions of the Michigan Right-To-Know Law, 1986 PA 80, which requires employers to:
1. Develop a communication program designed to safeguard the handling of hazardous chemicals through labeling of chemical containers, and development and availability of Material Safety Data Sheets.
2. Provide training for employees who work with these chemicals; and
3. Develop a written hazard communications program.
B. The law also provides for specific employee rights. These include:
1. The right to be notified (by employer or Contractor posting) of the location of Safety
Data Sheet (SDS)
2. The right to be notified (by employer or Contractor posting) of new or revised SDS no later than five working days after receipt
3. The right to request copies of SDS from their employers or Contractors.
C. Provisions of Michigan's Right-to-Know Law may be found in those sections of the Michigan Occupational Safety and Health Act (MIOSHA), which contain Right-to-Know provisions, and the Federal Hazard Community Standard, which is part of the MIOSHA Right-to-Know Law through adoption.
1.28 WITHDRAWAL OF BIDS
A. A Bidder may withdraw its Bid Proposal by written request from an authorized Bidder representative, at any time prior to the due date of bid proposals.
Back to top Page 10 of 78
B. No Bidder may withdraw a Bid Proposal for a period of ninety (90) calendar days, following the due date for receipt of bid proposals, and all bid proposals shall be subject to acceptance by the Owner during this ninety (90) day period.
1.29 EXECUTION OF CONTRACT
A. The Contractor to whom the contract is awarded shall, within ten (10) calendar days after
Notice of Award and receipt of the contract from the Owner, execute and deliver required copies to the Owner.
B. At or prior to delivery of the executed Contract, the Contractor to whom the contract is awarded shall deliver to the Owner those Certificates of Insurance required by the Bid Documents and such Labor and Materials Payment Bonds and Performance Bond as are required by Owner and any other documents required by this RFP.
C. The Owner shall approve the provided Bonds and Certificates of Insurance before the Contractor may proceed with the Work/Project. Failure or refusal to provide Bonds, Certificates of Insurance or any other documents required by this RFP in a form(s) satisfactory to the Owner shall subject the Contractor to loss of time from the allowable construction period equal to the time of delay in furnishing the required material.
1.30 POST BID INFORMATION
A. All additional information required for the proper evaluation of the bidder’s proposal shall be promptly provided upon request by the PSC or Owner.
1. This is not to be construed as additional time to provide documentation or information that is required to be included to be in the bid proposal.
1.31 TIME OF COMPLETION
A. The Bidder agrees to complete the Work within the timeframes listed in the Schedule of Events or as mutually agreed during the project kick-off meeting.
1.32 EQUAL OPPORTUNITY
A. The Contractor and all its subcontractors shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin.
PART 2 - EXECUTION
2.1 SITE REQUIREMENTS
A. The Owner Site is an instructional and administrative facility that provides up to year-round services to their students, staff, and the community. As such, activities in all buildings are critical to the provisioning of services to the students, staff and the community and shall not be interrupted by the Contractor's Work activities.
B. The computer and telephone systems associated with this Work will not be taken off-line or removed from service during normal working hours without coordination of the Owner’s IT department and the staff of affected buildings. Arrangements must be made by the Contractor to coordinate any such activities.
C. The Contractor will be required to work around all the conditions listed above, as well as working with the Owner’s staff to minimize disruptions to normal Owner activities.
D. Installation Guidelines
1. All Work performed on this Project will be installed in accordance with the current edition of the Michigan Electrical Code, the current edition of the BICSI Telecommunications Distribution Methods Manual, the current edition of the BICSI Cabling Installation Manual, the latest issue of the TIA Standards as published by Global Engineering Documents as TIA Commercial Building Telecommunications Standard, and all local codes and ordinances.
2.2 QUALITY ASSURANCE
A. Project Manager
Back to top Page 11 of 78
1. The Contractor will provide a full-time Project Manager who will act as a single point of contact for all activities regarding this Project. The Project Manager must be a management employee and will not be involved in personally performing craft installation work.
a. Requested changes to project management staff by the integrator will be made in written and must be approved by the Owner.
b. Any additional time taken by the Owner or PSC during the new project manager’s transition will be deducted by change order to the integrator’s total project amount.
2. The Owner and PSC may request a change of the Integrator’s project manager at any time during the project.
3. The Project Manager is required to attend necessary technology and construction meetings for coordination before Work is started and construction meetings once Work is in progress.
4. The Project Manager will be required to make on-site decisions regarding the scope of the Work and any changes required by the Work.
5. The Project Manager will be totally responsible for all aspects of the Work and shall have the authority to make immediate decisions regarding change orders, and implementation or Owner approved changes to the Work.
B. Compliance with Laws and Regulations
1. The Contractor performance of the Work shall comply with all applicable federal, state, and local laws, rules, and regulations and Owner policies, procedure, rules and regulations. The Contractor shall give required notices, shall procure necessary governmental licenses and inspections, and shall pay without burden to the Owner, all fees and charges in connection therewith unless specifically provided otherwise. In the event of violation, the Contractor shall pay all fines and penalties; including attorney's fees and other defense costs and expenses in connection therewith.
C. Federal Communications Commission
1. Equipment requiring FCC registration or approval shall have received such approval and shall be appropriately identified.
D. Codes, Standards, and Ordinances
1. All Work shall conform to the latest edition of the Michigan Electrical Code, the Building Code, and all local codes and ordinances, as applicable. Current versions of TIA-568 and TIA-569 shall be adhered to during all installation activities. Methodologies outlined in the latest edition of the BICSI Telecommunications Distribution Methods Manual shall also be used during all installation activities. Should conflicts exist with the foregoing, the authority having jurisdiction for enforcement will have responsibility for making interpretation. The Contractor is wholly responsible to meet or exceed all codes, standards, regulation, manufacturer installation standards and industry best practices.
2.3 SAFETY
A. The Contractor shall take the necessary precautions and bear the sole responsibility for the safety of the methods employed in performing the Work. The Contractor shall at all times comply with the regulations set forth by federal, state, and local laws, rules, and regulations concerning "OSHA" and all applicable state labor laws, regulations, and standards. The Contractor shall indemnify and hold harmless the Owner from and against all liabilities, suits, damages, costs, and expenses (including attorney's fees and court costs) that may be imposed on the Owner because of the Contractor, or its subcontractor, or supplier’s failure to comply with the regulations stated herein.
Back to top Page 12 of 78
2.4 INSPECTION, ACCEPTANCE, AND TITLE
A. Inspection and Acceptance will be upon successful installation unless otherwise provided. Title to/or risk of loss or damage to all items shall be the responsibility of the Contractor until acceptance by the Owner unless loss or damage results from negligence by the Owner. If the materials or services supplied to the Owner are found to be defective or do not conform to the specifications, the Owner reserves the right to cancel the Contract upon written notice to and return products at the Contractor's expense, based upon the terms of the Contract.
1. When the Owner is referred to in this section of the RFP relative to inspections, the Owner has designated the PSC as the party to perform such inspections on behalf of the Owner.
Notwithstanding the above, the Owner may also perform such inspections along with the
PSC.
B. The Owner shall at all times have access to the Work wherever it is in preparation or progress and shall provide proper facilities for such access and for inspection.
C. The Contractor shall not close-up any Work until the Owner or applicable AHJ has inspected the Work. Should the Contractor close-up the work prior to inspection, the Contractor shall uncover the Work for inspection at no cost to the Owner, and then recover the Work according to the specifications contained herein. The Contractor shall notify the Owner and applicable AHJ in writing when the Work is ready for inspection. The Owner and AHJ will inspect the Work as expeditiously as possible after receipt of notification from the Contractor.
2.5 STATUS REPORTS, MEETINGS AND CONSTRUCTION COORDINATION
A. It shall be the Contractor’s responsibility to provide the Owner / PSC with written weekly project status reports while actively engaged in craft work and a summary report at the beginning of periods of inactivity between phases or construction delays noting status at that time and expected date of return to work in addition to the requirements listed below. These reports are required and shall include, but not be limited to:
B. Project completion percentage.
C. All problems that were encountered.
D. Any foreseeable problems that may arise.
E. General status of the project F. The Owner / PSC reserves the right to hold additional status meetings on a regular basis with the Contractor’s Project Manager.
END OF SECTION
Back to top Page 13 of 78
SECTION 00 30 10 - SCHEDULE OF EVENTS
The following is a projected schedule of events for this project. The schedule may change depending upon the results of the responses and a final schedule will be established prior to contracting with the Contractor. Additionally, the final schedule shall be subject to change based on construction schedule and progress.
EVENT DATE
Bid Release 1/30/2025
Bidder’s Conference Date and time 2/6/2025 10:00 AM
Final Date and time for Questions 2/13/2025 5:00 PM
Bid Due Date/Time and Public Opening 2/27/2025 2:00 PM
Contract Award 3/7/2025
Project Start Date 4/1/2025
Project Completion 8/13/2025
End of Section
Back to top Page 14 of 78
SECTION 00 40 10 - BID PROPOSAL FORM
OWNER: Travis Smith
Executive Director of Technology Swartz Creek Community Schools 8354 Cappy Lane Swartz Creek, Michigan 48473
NAME OF BIDDER:
BASE BID:
Lump sum bid for all work specified and shown on the drawings as indicated for base bid in the amount of:
____________________________________________________ Dollars ($ )
The Bid Proposal amount shall be shown in both words and figures. In the case of discrepancy, the amount shown in words shall govern.
BASE BID: The undersigned, having examined the Bid Documents and examined the conditions affecting the Work/Project, hereby proposes and agrees to furnish all of the labor, materials, and equipment and perform all work necessary to complete the Work/Project as required by the Bid Documents for the stipulated sum identified above and detailed in Supplemental A (Cost Analysis Worksheet). The Bid Documents set forth the terms and conditions upon which the Bidder will provide a "turnkey" solution for the installation and operation of the project for use by the Owner and represents and warrants that the design, operation, and functionality of the project are in accordance with the Bid Documents. All prices provided by the Bidder on this Bid Proposal Form must include all cables, connectors, equipment etc. that are necessary to make the project fully operational for the intent and purpose stated in the Bid Documents
BID SECURITY: Enclosed herewith find (Certified Check)/ (Bid Bond) in an amount being five percent (5%) of the maximum Bid Proposal herein, made payable to Swartz Creek Community Schools or naming Swartz Creek Community Schools as obligee. The proceeds of which are to remain the property of Swartz Creek Community Schools, if the Bidder does not, within ten (10) days after notice of the acceptance of Bid Proposal, enter the Contract.
Back to top Page 15 of 78
EXCEPTIONS AND SUBCONTRACTORS
Any exceptions to the terms and conditions contained in the RFP or contract must be identified below:
(Identify each with specific RFP section/part/paragraph, attach a separate sheet if required) Referring to an annotated RFP is NOT acceptable. Additionally, any subcontractors must be listed below with all contact information.
ADDENDA
This RFP incorporates the following Addenda:
Addendum No. Dated ____________ Addendum No. Dated ______________
BID PROPOSAL FORM REQUIRED ATTACHMENTS:
The following Bid Form Proposal Supplements are attached hereto and are considered an integral part of this Bid Proposal Form:
SUPPLEMENTAL A – Cost Analysis Worksheet
SUPPLEMENTAL B – Unit Pricing
SUPPLEMENTAL C – Mandatory Alternates
SUPPLEMENTAL D – Voluntary Alternates
SUPPLEMENTAL E – Familial Disclosure Affidavit
SUPPLEMENTAL F – Iran Economic Sanctions Act Compliance Affidavit
The following additional information must also be included for the bid proposal to be considered compliant:
Bill of Material and installed pricing
Comprehensive Narrative of the proposed System/Solution
Diagrams or Schematics supporting the System/Solution Narrative
Other information as indicated herein.
Statement of Material and Labor Availability
Back to top Page 16 of 78
BIDDER NAME:
ADDRESS:
DATE:
TELEPHONE:
EMAIL ADDRESS: ______________________
If award is made to our firm based upon our Bid Proposal, we agree to enter into the form of Contract with the Owner in accordance with this Request for Proposal, the contract and our Bid Proposal.
My signature certifies that the Bid Proposal as submitted complies with all terms and conditions as set forth in this Request for Proposal, unless specifically enumerated as an exception as part of this Bid Proposal Form.
I hereby certify that I am authorized to sign as a Representative for the Firm:
(Authorized Signature) (Title)
Back to top Page 17 of 78
SUPPLEMENTAL A - COST ANALYSIS WORKSHEET
OWNER: Travis Smith Executive Director of Technology Swartz Creek Community Schools 8354 Cappy Lane Swartz Creek, Michigan 48473
BIDDER:
ADDRESS:
BID BREAKDOWN
SWARTZ CREEK HIGH SCHOOL COMPONENT Pricing
Cat 6A Classroom Cabling Material
Labor
Sub Total
Cabinets and Bonding Material
Labor
Sub Total
TOTAL
Alternates Pricing
Alternate 1 – Replace Fiber Material
Labor
Total Alternate 1
Alternate 2 – Demo Old Lab Cabling Material
Labor
Total Alternate 2
SWARTZ CREEK JUNIOR HIGH SCHOOL COMPONENT Pricing
Cat 6A Classroom Cabling Material
Labor
Sub Total
Cabinets and Bonding Material
Labor
Back to top Page 18 of 78
Alternate 1 – Replace Fiber Material
Total Alternate 1
DIECK ELEMENTARY SCHOOL COMPONENT Pricing
Labor
Sub Total
Cabinets and Bonding Material
Labor
ELMS ROAD ELEMENTARY COMPONENT Pricing
Labor
Sub Total
Cabinets and Bonding Material
Labor
Back to top Page 19 of 78
Alternates Pricing
Alternate 1 – Replace Fiber Material
GAINES ELEMENTARY COMPONENT Pricing
Labor
Sub Total
Cabinets and Bonding Material
Labor
MORRISH ELEMENTARY COMPONENT Pricing
Labor
Sub Total
Cabinets and Bonding Material
Labor
Performance and Material Bond
TOTAL BASE BID
Back to top Page 20 of 78
SUPPLEMENTAL B - UNIT PRICING
All bid proposals shall include a detailed Bill of Materials that notes each item, part number, and unit price. Note: not all items listed below are base bid requirements.
Provide a Bill of Materials, attached to and submitted with the Bid Proposal. Additionally, provide these unit costs, which shall be considered firm pricing during the contract period and not subject to change, and will be used to determine costs (Inclusive of both labor and material) for additions and deletions during the contract period. If any of these items are not applicable, please indicate as such by “NA”. The Owner reserves the right to adjust any or all quantities at any time.
In addition to the required Bill of Materials, include the following Unit Prices (also include cost of associated licenses).
Item Unit Price
UP1 Category 6A UTP, terminated and tested, up to 200’ in length
UP2 Category 6A UTP, terminated and tested, up to 295’ in length
UP3 48 port patch panel, installed, with all ports populated with 8p/8c connectors
UP4 24 port patch panel, installed, with all ports populated with 8p/8c connectors
Back to top Page 21 of 78
SUPPLEMENTAL C - MANDATORY ALTERNATES
Alternate 1: Replace multi-mode fiber between IDFs/MDFs with single mode (Total from above)
Add/Deduct _________________________________________ ($)________________
Alternate 2: Remove cabling and associated network items from old computer labs (Total from above).
Add/Deduct _________________________________________ ($)________________
Back to top Page 22 of 78
SUPPLEMENTAL E - FAMILIAL DISCLOSURE AFFIDAVIT
The undersigned, the owner or authorized officer of ________________________ (the “Bidder”), pursuant to the familial disclosure requirement provided in the Request for Proposal(s), hereby represents and warrants that, except as provided below, no familial relationships exist between the owner or any employee of the Bidder, and any member of the Board of Education of the School District or the Superintendent of the School District.
List any Familial Relationships:
BIDDER:
By:
Title:
STATE OF MICHIGAN
COUNTY OF ____________
This instrument was acknowledged before me on the _____ day of ____________, _____, by
, Notary Public
______________ County, Michigan
My Commission Expires: ___________
Acting in the County of: ___________
Back to top Page 23 of 78
SUPPLEMENTAL F - IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below named applicant (the “Applicant”), pursuant to the compliance certification requirement provided in the Request For Proposals for Network Cabling Additions (the “RFP”), hereby certifies, represents and warrants that the Applicant (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Applicant is awarded a contract as a result of the aforementioned RFP, the Applicant will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.
The Applicant further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the Owner’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.
APPLICANT:
Name of Applicant
By: ___________________________________
Title: _________________________________
Date: _________________________________
State of Michigan, County of ____________ )
This instrument was acknowledged before me on the _____ day of ____________, _____, by
____________________________________, Notary Public ______________ County, __________
My Commission Expires: ___________
Acting in the County of: ___________
Back to top Page 24 of 78
SECTION 27 00 00 STRUCTURED CABLING SYSTEMS OVERVIEW
PART 1 - GENERAL
1.1 OVERVIEW
A. This project is to expand and advance the current network infrastructure to accommodate newly anticipated technology services for the classrooms in Swartz Creek Community Schools.
B. Classroom Wiring: Cat 6A cabling will need to be run from appropriate MDF/IDF to each classroom. Two cables will be needed for each location.
1. One cable will be terminated in the front of each classroom with a keystone jack mounted in a faceplate with two ports. The unoccupied spot should be properly covered. Wiring, keystones and plates are to be white in color.
a. Classrooms walls are solid block so conduit/raceway will be needed. Conduit and raceway should be white in color.
b. Classrooms have dry erase boards mounted in the front of each classroom.
Conduit/raceway and cabling will need to be routed around and below these boards.
2. The second cable is to be left coiled up in the ceiling of each room for later use.
This cable is to be terminated with a keystone jack.
3. Cables will be terminated in the MDF/IDF racks using a keystone style patch panel provided by the contractor.
C. Network cabinets: A few of the cabinets will not have room for additional cabling.
These cabinets are to be replaced with larger cabinets to accommodate. There is also one cabinet in the STEM classroom in the High School that needs rails.
1. The wall cabinets will need to be mounted.
2. The contractor is responsible for moving current devices/cables from the old cabinet to new.
3. New cabinets should have at least 4u available for expansion after all the new and old equipment has been installed.
4. The contractor will be responsible for purchasing the appropriate rails for the
STEM classroom cabinet and properly mount all new/old equipment.
D. Bonding and Grounding: Many of the IDFs and MDFs lack proper bonding. The successful bidder will be required to supply best practice solutions to properly protect the district’s network technology. This will involve (in the least) installation of grounding bars and bonding between cable trays and cabinets.
E. The RFP requests for all the schools in the district. However, the Owner reserves the right to select few locations for the project.
F. Fiber Cables: As an Alternate the school district is looking for a quote to replace their multi-mode fiber between cabinets with single mode.
G. Demolition Old Labs – As an Alternate the school district is looking for a quote to remove old cabling/cabling poles/jacks/etc. from 2 old computer labs that are no longer being used in the High School. One room is one the 1st and one on the 2nd floor.
1.2 LOCATIONS
A. Swartz Creek High School – One Dragon Drive, Swartz Creek, MI 48473 B. Swartz Creek Middle School – 8230 Crapo Drive, Swartz Creek, MI 48473
Back to top Page 25 of 78
C. Dieck Elementary School – 2239 Van Vleet Road, Swartz Creek, MI 48473 D. Elms Road Elementary School – 3259 Elms Road, Swartz Creek, MI 48473 E. Gaines Elementary School – 300 East Lansing Street, Gaines, MI 48436 F. Morrish Elementary School – 5055 Maple Road, Swartz Creek, MI 48473 G. Syring Elementary School – 5300 Oakview Drive, Swartz Creek, MI 48473
1.3 RELATED DOCUMENTS
A. Drawings B. Section 27 00 00 STRUCTURED CABLING SYSTEM OVERVIEW
C. Section 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS
D. Section 27 05 26 BONDING AND GROUNDING
E. Section 27 10 10 STRUCTURED CABLING SYSTEMS (SCS)
F. Section 27 13 00 COMMUNICATONS BACKBONE
G. Section 27 15 00 COMMUNICATIONS FITTINGS
1.4 SUMMARY
A. Provide all labor, materials, and equipment to add network cabling for each classroom.
B. Provide all labor, materials and equipment to implement best practice solutions to bonding and grounding in IDFs and MDFs.
C. Provide all labor, materials and equipment to replace cabinets with no room for expansion with new larger cabinets including moving cabling and equipment to new cabinet.
D. Purchase and install railings for IDF cabinet inside STEM lab. Including mounting the equipment.
E. All labor and materials for Alternates if selected for use.
1.5 SUBMITTALS
A. Informational Submittals
1. Product Data
B. Manufacturer product data sheets C. Manufacturer product instructions, and installation and operating manuals D. Shop Drawings
1. Complete set of proposed drawings, identifying equipment locations, types of cabling, numbers of conductors, raceway locations, and termination points of each conductor.
2. Complete listing of proposed devices, indicating interconnection equipment locations and specifying terminal/connecter termination locations.
3. Operational narrative of each component/system.
1.6 CLOSEOUT SUBMITTALS
A. Warranty Documentation
1. Integrator’s Warranty
2. Manufacturer warranty statements for all system components and applicable equipment.
1.7 Record Documentation:
A. Maintenance Material Submissions:
1. Listing of spare parts required to maintain the system.
B. Closeout Submittals
Back to top Page 26 of 78
1. As-built drawings showing main cable routes, cable termination points, equipment and devices, access-controlled doors, cameras and labeling /identification of the same.
1.8 COORDINATION / DESIGN INTENT
A. The specifications and drawings shall be complimentary and of equal authority and priority.
B. Refer conflicts and differences within the Contract Documents to the PSC prior to submission bids to perform this Work. If any such differences or conflicts are not called to attention of the PSC prior to bid submission, the PSC shall decide which of the conflicting requirements shall govern and the Contractor shall perform the Work at no additional cost to the Owner or its representatives in accordance with said decision.
C. Should the drawings disagree in themselves or with other Contract Documents, the greater quantity of Work or materials shall be furnished and performed. Decision by the PSC shall be final.
1.9 PERMITS
A. The Contractor shall ensure compliance with and an understanding of all local codes and contract conditions and shall obtain all permits necessary pertaining to the Work.
B. The Contractor shall be…