About this file

This is an architectural/engineering drawing for structured cabling at Swartz Creek High School's Unit E, created by Convergent Technology Partners, showing the layout and specifications for Category 6A cable installation. The drawing details the placement of UTP locations, ceiling UTP locations, telecom cabinets, and bus bars throughout Unit E of the high school, which includes a cafeteria, kitchen, main office area, and staff lounge. The design was completed in January 2025 with initial design work done in December 2024.

The technical specifications require all UTP cable to be ANSI/TIA Category 6A, installed in surface-mounted single-gang back boxes with white two-port faceplates, with unused top ports filled with blank keystone jack inserts. Wall locations must be centered below whiteboards at standard height, and all cabling below ceiling must be concealed in contractor-provided raceway. The plan requires ceiling locations to have service loops capable of reaching the farthest point in associated rooms, with all Category 6A cables terminating on white 8P/8C (RJ45) jacks. The project assumes all cabinets need grounding, and bus block locations are to be determined using best practices for installation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT E

0' 5' 10' 20' 30' 40' 50'

NOT TO SCALE - BAR SCALE APPROXIMATE. FIELD VERIFY ALL DIMENSIONS

TGB

TGB

SYMBOL LEGEND

UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION,

QTY AS NOTED

TELECOM CABINET

NEW TELECOM BUS-BAR

EXISTING BUS-BAR

OLD COMPUTER LAB

TGB

B C

A D

E F

G

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL LOCATIONS IN A

SURFACE MOUNTED SINGLE-GANG BACK BOX

WITH A WHITE TWO PORT FACEPLATE.

2. THE UNUSED TOP PORT OF THE FACEPLATE

IS TO BE FILLED WITH A BLANK KEYSTONE

JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED BELOW

WHITEBOARD AT STANDARD HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE WALL AT

STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED BY

CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH SERVICE

LOOP LONG ENOUGH TO REACH THE

FARTHEST LOCATION IN THE ASSOCIATED

ROOM. SECURELY FASTEN SERVICE LOOP TO

STRUCTURE.

7. TERMINATE ALL CATEGORY 6A CABLES ON

WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE ESTIMATED,

USE BEST PRACTICES FOR INSTALLATION

LOCATION.

9. FOR ESTIMATES ASSUME ALL CABINETS

NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/24/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

SWARTZ CREEK HIGH

SCHOOL

HS-T101E

T101E

NTS

HIGH SCHOOL UNIT E

KEYMAP

Sheets and Views
HS-T101E

File details come from the government source that posted it. Updated .