DIECK DE-T101-DE-T101.pdf

PDF 224 KB Posted

Attached to
2025 E-Rate Network Cabling Additions
Solicitation number
RFP-SCC-250000001194-2
Issued by
Michigan

About this file

This is a structured cabling floor plan and technical specifications document for Dieck Elementary School in the Swartz Creek Community Schools system, prepared by Convergent Technology Partners. The document details the installation requirements for Category 6A UTP cabling throughout the school building, including specifications for wall locations with surface-mounted single-gang back boxes, white two-port faceplates, and ceiling mount locations. The design dates shown are December 17, 2024, and January 23, 2025.

The floor plan shows the layout of UTP locations, telecom cabinets, and bus bars throughout the school building. Key technical requirements include using ANSI/TIA Category 6A cable, white 8P/8C (RJ45) jacks for termination, concealed raceway installation below ceiling, and service loops for ceiling locations. The document specifies that all cabinets require grounding, and bus block locations are to be determined using best practices during installation. Installation heights are standardized, with wall locations to be centered below whiteboards or centered on walls without whiteboards at standard height.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 1 1 1 1 1 1

1 11 1

1 1

1 1 1 1

TGB

SYMBOL LEGEND

UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION,

QTY AS NOTED

TELECOM CABINET

TELECOM BUS-BAR

REPLACE CABINETR

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL LOCATIONS

IN A SURFACE MOUNTED SINGLE-GANG

BACK BOX WITH A WHITE TWO PORT

FACEPLATE.

2. THE UNUSED TOP PORT OF THE

FACEPLATE IS TO BE FILLED WITH A

BLANK KEYSTONE JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED

BELOW WHITEBOARD AT STANDARD

HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE

WALL AT STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED BY

CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH

SERVICE LOOP LONG ENOUGH TO

REACH THE FARTHEST LOCATION IN THE

ASSOCIATED ROOM. SECURELY FASTEN

SERVICE LOOP TO STRUCTURE.

7. TERMINATE ALL CATEGORY 6A CABLES

ON WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE

ESTIMATED, USE BEST PRACTICES FOR

INSTALLATION LOCATION.

9. FOR ESTIMATES ASSUME ALL CABINETS

NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/23/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

DIECK ELEMENTARY

SCHOOL

DE-T101

T101

NTS

DIECK FLOOR PLAN

Sheets and Views
DE-T101

File details come from the government source that posted it. Updated .