About this file
This is a structured cabling system design drawing for Swartz Creek Community Schools' Swartz Creek Middle School, prepared by Convergent Technology Partners. The drawing details the specifications for Category 6A UTP cable installations throughout Unit C of the middle school, including wall and ceiling UTP locations, telecom cabinets, and telecom bus-bars. The design was completed in January 2025 and includes detailed installation requirements for cable routing, terminations, and mounting specifications.
The technical specifications require all UTP cable to be ANSI/TIA Category 6A standard, with wall locations mounted in surface-mounted single-gang back boxes using white two-port faceplates. The installation includes specific requirements for service loops in ceiling locations, white 8P/8C (RJ45) jack terminations, and grounding for all cabinets. The drawing shows multiple classroom locations with designated wall and ceiling UTP placements, along with utility rooms, offices, and common areas requiring network connectivity infrastructure.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3'-0 1 16"
U N
IT
B
U N
IT
C
U N
IT
C
U N
IT
D
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1 1
1 1
1 1
TGB
SYMBOL LEGEND
WALL UTP LOCATION, QTY AS
NOTED
CEILING UTP LOCATION, QTY AS
NOTED
TELECOM CABINET
TELECOM BUS-BAR
REPLACE CABINETR
B
A
C D
E
FF
GENERAL NOTES
1. ALL UTP CABLE SHALL BE ANSI/TIA
CATEGORY 6A. PLACE WALL LOCATIONS IN
A SURFACE MOUNTED SINGLE-GANG BACK
BOX WITH A WHITE TWO PORT FACEPLATE.
2. THE UNUSED TOP PORT OF THE
FACEPLATE IS TO BE FILLED WITH A BLANK
KEYSTONE JACK INSERT.
3. PLACE WALL LOCATIONS CENTERED
BELOW WHITEBOARD AT STANDARD
HEIGHT.
4. LOCATIONS WITHOUT WHITEBOARDS,
CENTER THE INSTALLATION ON THE WALL
AT STANDARD HEIGHT.
5. ALL CABLE BELOW CEILING SHALL BE
CONCEALED IN RACEWAY PROVIDED BY
CONTRACTOR.
6. PROVIDE CEILING LOCATION WITH SERVICE
LOOP LONG ENOUGH TO REACH THE
FARTHEST LOCATION IN THE ASSOCIATED
ROOM. SECURELY FASTEN SERVICE LOOP
TO STRUCTURE.
7. TERMINATE ALL CATEGORY 6A CABLES ON
WHITE 8P/8C (RJ45) JACKS.
8. LOCATION OF BUS BLOCKS ARE
ESTIMATED, USE BEST PRACTICES FOR
INSTALLATION LOCATION.
9. FOR ESTIMATES ASSUME ALL CABINETS
NEED GROUNDING.
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
1/27/2025 DESIGN DLF
12/17/2024 DESIGN EGH
DATE ISSUE AUTHOR
SWARTZ CREEK
COMMUNITY SCHOOLS
STRUCTURED CABLING
SWARTZ CREEK
MIDDLE SCHOOL
MS-T101C
KEYMAP
101C
NTS
M.S. UNIT C
| Sheets and Views |
| MS-T101C |
File details come from the government source that posted it. Updated .