This is a structured cabling system design drawing for Swartz Creek Community Schools' Swartz Creek Middle School, prepared by Convergent Technology Partners. The drawing details the specifications for Category 6A UTP cable installations throughout Unit C of the middle school, including wall and ceiling UTP locations, telecom cabinets, and telecom bus-bars. The design was completed in January 2025 and includes detailed installation requirements for cable routing, terminations, and mounting specifications.

The technical specifications require all UTP cable to be ANSI/TIA Category 6A standard, with wall locations mounted in surface-mounted single-gang back boxes using white two-port faceplates. The installation includes specific requirements for service loops in ceiling locations, white 8P/8C (RJ45) jack terminations, and grounding for all cabinets. The drawing shows multiple classroom locations with designated wall and ceiling UTP placements, along with utility rooms, offices, and common areas requiring network connectivity infrastructure.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3'-0 1 16"

U N

IT

B

U N

IT

C

U N

IT

C

U N

IT

D

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 1 1

1 1

1 1

TGB

SYMBOL LEGEND

WALL UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION, QTY AS

NOTED

TELECOM CABINET

TELECOM BUS-BAR

REPLACE CABINETR

B

A

C D

E

FF

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL LOCATIONS IN

A SURFACE MOUNTED SINGLE-GANG BACK

BOX WITH A WHITE TWO PORT FACEPLATE.

2. THE UNUSED TOP PORT OF THE

FACEPLATE IS TO BE FILLED WITH A BLANK

KEYSTONE JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED

BELOW WHITEBOARD AT STANDARD

HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE WALL

AT STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED BY

CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH SERVICE

LOOP LONG ENOUGH TO REACH THE

FARTHEST LOCATION IN THE ASSOCIATED

ROOM. SECURELY FASTEN SERVICE LOOP

TO STRUCTURE.

7. TERMINATE ALL CATEGORY 6A CABLES ON

WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE

ESTIMATED, USE BEST PRACTICES FOR

INSTALLATION LOCATION.

9. FOR ESTIMATES ASSUME ALL CABINETS

NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/27/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

SWARTZ CREEK

MIDDLE SCHOOL

MS-T101C

KEYMAP

101C

NTS

M.S. UNIT C

Sheets and Views
MS-T101C