About this file

This is a technical drawing showing the structured cabling plan for Gaines Elementary School in the Swartz Creek Community Schools district, designed by Convergent Technology Partners. The drawing details specifications for Category 6A UTP cable installations throughout the school building, including wall and ceiling mounting locations, telecom cabinets, and bus-bar placements.

The plan includes specific technical requirements such as using ANSI/TIA Category 6A cable, white two-port faceplates with single-gang back boxes for wall locations, and white 8P/8C (RJ45) jacks for all cable terminations. Installation specifications require wall locations to be centered below whiteboards at standard height, ceiling locations to include service loops secured to structure, and all below-ceiling cable to be concealed in contractor-provided raceway. The drawing is dated January 23, 2025 with an initial design date of December 17, 2024 and includes a detailed floor plan showing the placement of UTP locations, telecom cabinets, and related infrastructure throughout the school building.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1

1 1

1 1

1 1

1 1

1 1

1 11 11 11 1

1 1

1 1

TG

B

TGB

SYMBOL LEGEND

UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION,

QTY AS NOTED

TELECOM CABINET

TELECOM BUS-BAR

REPLACE CABINETR

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL

LOCATIONS IN A SURFACE MOUNTED

SINGLE-GANG BACK BOX WITH A

WHITE TWO PORT FACEPLATE.

2. THE UNUSED TOP PORT OF THE

FACEPLATE IS TO BE FILLED WITH A

BLANK KEYSTONE JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED

BELOW WHITEBOARD AT STANDARD

HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE

WALL AT STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED

BY CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH

SERVICE LOOP LONG ENOUGH TO

REACH THE FARTHEST LOCATION IN

THE ASSOCIATED ROOM. SECURELY

FASTEN SERVICE LOOP TO

STRUCTURE.

7. TERMINATE ALL CATEGORY 6A

CABLES ON WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE

ESTIMATED, USE BEST PRACTICES

FOR INSTALLATION LOCATION.

9. FOR ESTIMATES ASSUME ALL

CABINETS NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/23/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

GAINES ELEMENTARY

SCHOOL

GE-T101

T101

NTS

GAINES FLOOR PLAN

Sheets and Views
GE-T101