HIGH SCHOOL HS-T101-HS-T101F.pdf
PDF 625 KB Posted
- Attached to
- 2025 E-Rate Network Cabling Additions
- Solicitation number
- RFP-SCC-250000001194-2
- Issued by
- Michigan
About this file
This is a technical drawing/specification document for structured cabling work at Swartz Creek High School, prepared by Convergent Technology Partners. The drawing details Unit F of the high school, which includes a gymnasium, lobby, and locker room facilities. The document specifies requirements for Category 6A UTP cable installation, including wall locations with surface-mounted single-gang back boxes, white two-port faceplates, and ceiling mounting specifications.
The technical specifications require all Category 6A cables to be terminated on white 8P/8C (RJ45) jacks, with wall locations to be centered below whiteboards at standard height or centered on walls without whiteboards. The contractor must conceal all below-ceiling cable in raceway, provide ceiling locations with adequate service loops, and ensure proper grounding for all cabinets. The drawing is dated January 24, 2025, with an earlier design date of December 17, 2024, and includes detailed installation notes and a symbol legend for various telecommunication components.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT F UNIT F
UNIT G
UNIT F
0' 5' 10' 20' 30' 40' 50'
NOT TO SCALE - BAR SCALE APPROXIMATE. FIELD VERIFY ALL DIMENSIONS
TGB
SYMBOL LEGEND
UTP LOCATION, QTY AS
NOTED
CEILING UTP LOCATION,
QTY AS NOTED
TELECOM CABINET
NEW TELECOM BUS-BAR
EXISTING BUS-BAR
OLD COMPUTER LAB
TGB
B C
A D
E F
G
GENERAL NOTES
1. ALL UTP CABLE SHALL BE ANSI/TIA
CATEGORY 6A. PLACE WALL LOCATIONS IN A
SURFACE MOUNTED SINGLE-GANG BACK BOX
WITH A WHITE TWO PORT FACEPLATE.
2. THE UNUSED TOP PORT OF THE FACEPLATE
IS TO BE FILLED WITH A BLANK KEYSTONE
JACK INSERT.
3. PLACE WALL LOCATIONS CENTERED BELOW
WHITEBOARD AT STANDARD HEIGHT.
4. LOCATIONS WITHOUT WHITEBOARDS,
CENTER THE INSTALLATION ON THE WALL AT
STANDARD HEIGHT.
5. ALL CABLE BELOW CEILING SHALL BE
CONCEALED IN RACEWAY PROVIDED BY
CONTRACTOR.
6. PROVIDE CEILING LOCATION WITH SERVICE
LOOP LONG ENOUGH TO REACH THE
FARTHEST LOCATION IN THE ASSOCIATED
ROOM. SECURELY FASTEN SERVICE LOOP TO
STRUCTURE.
7. TERMINATE ALL CATEGORY 6A CABLES ON
WHITE 8P/8C (RJ45) JACKS.
8. LOCATION OF BUS BLOCKS ARE ESTIMATED,
USE BEST PRACTICES FOR INSTALLATION
LOCATION.
9. FOR ESTIMATES ASSUME ALL CABINETS
NEED GROUNDING.
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
1/24/2025 DESIGN DLF
12/17/2024 DESIGN EGH
DATE ISSUE AUTHOR
SWARTZ CREEK
COMMUNITY SCHOOLS
STRUCTURED CABLING
SWARTZ CREEK HIGH
SCHOOL
HS-T101F
T101F
NTS
HIGH SCHOOL UNIT F KEYMAP
| Sheets and Views |
| HS-T101F |
File details come from the government source that posted it. Updated .