This is a technical drawing/specification sheet for structured cabling work at Swartz Creek High School, prepared by Convergent Technology Partners. The document shows detailed floor plans for Unit 2A and 2B of the high school's second floor, with specifications for Category 6A UTP cable installation. The design was completed in December 2024/January 2025 and includes placement requirements for wall locations, ceiling drops, telecom cabinets, and bus-bars.
The technical specifications require all UTP cable to be ANSI/TIA Category 6A standard, with wall locations to be installed in surface-mounted single-gang back boxes with white two-port faceplates. The document includes specific installation requirements such as centering wall locations below whiteboards at standard height, concealing cables below ceiling in contractor-provided raceway, and providing ceiling locations with adequate service loops. All Category 6A cables must terminate on white 8P/8C (RJ45) jacks, and all cabinets require grounding. The floor plan shows multiple classrooms, including former computer lab spaces, with detailed placement of UTP locations and telecom infrastructure.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT 2B
UNIT 2A
0' 5' 10' 20' 30' 40' 50'
NOT TO SCALE - BAR SCALE APPROXIMATE. FIELD VERIFY ALL DIMENSIONS
1 1
1 1
UNIT 2B
UNIT 2A
0' 5' 10' 20' 30' 40' 50'
NOT TO SCALE - BAR SCALE APPROXIMATE. FIELD VERIFY ALL DIMENSIONS
TGB
SYMBOL LEGEND
UTP LOCATION, QTY AS
NOTED
CEILING UTP LOCATION,
QTY AS NOTED
TELECOM CABINET
NEW TELECOM BUS-BAR
EXISTING BUS-BAR
OLD COMPUTER LAB
TGB
A2 B2
GENERAL NOTES
1. ALL UTP CABLE SHALL BE ANSI/TIA
CATEGORY 6A. PLACE WALL LOCATIONS IN A
SURFACE MOUNTED SINGLE-GANG BACK BOX
WITH A WHITE TWO PORT FACEPLATE.
2. THE UNUSED TOP PORT OF THE FACEPLATE
IS TO BE FILLED WITH A BLANK KEYSTONE
JACK INSERT.
3. PLACE WALL LOCATIONS CENTERED BELOW
WHITEBOARD AT STANDARD HEIGHT.
4. LOCATIONS WITHOUT WHITEBOARDS,
CENTER THE INSTALLATION ON THE WALL AT
STANDARD HEIGHT.
5. ALL CABLE BELOW CEILING SHALL BE
CONCEALED IN RACEWAY PROVIDED BY
CONTRACTOR.
6. PROVIDE CEILING LOCATION WITH SERVICE
LOOP LONG ENOUGH TO REACH THE
FARTHEST LOCATION IN THE ASSOCIATED
ROOM. SECURELY FASTEN SERVICE LOOP TO
STRUCTURE.
7. TERMINATE ALL CATEGORY 6A CABLES ON
WHITE 8P/8C (RJ45) JACKS.
8. LOCATION OF BUS BLOCKS ARE ESTIMATED,
USE BEST PRACTICES FOR INSTALLATION
LOCATION.
9. FOR ESTIMATES ASSUME ALL CABINETS
NEED GROUNDING.
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
1/24/2025 DESIGN DLF
12/17/2024 DESIGN EGH
DATE ISSUE AUTHOR
SWARTZ CREEK
COMMUNITY SCHOOLS
STRUCTURED CABLING
SWARTZ CREEK HIGH
SCHOOL
HS-T102
T1012
NTS
H.S. 2ND FLOOR UNIT A
T1012
NTS
H.S. 2ND FLOOR UNIT B
KEYMAP
| Sheets and Views |
| HS-T102 |