About this file

This is a structured cabling system design drawing for Swartz Creek Community Schools' Swartz Creek Middle School, created by Convergent Technology Partners with design dates of 12/17/2024 and 1/27/2025. The drawing shows telecommunications infrastructure plans including wall UTP locations, ceiling UTP locations, telecom cabinets, telecom bus-bars, and fire/place cabinets. The design specifies that all UTP cable must be ANSI/TIA Category 6A, with wall locations requiring surface-mounted single-gang back boxes with white two-port faceplates.

The technical specifications include detailed installation requirements such as concealing cables below ceiling in contractor-provided raceways, providing ceiling locations with service loops long enough to reach the farthest room location, terminating all Category 6A cables on white 8P/8C (RJ45) jacks, and grounding requirements for all cabinets. The drawing includes a floor plan of Unit E of the middle school showing the placement of telecommunications infrastructure components and a symbol legend defining the various elements of the design.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1

TGB

SYMBOL LEGEND

WALL UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION, QTY AS

NOTED

TELECOM CABINET

TELECOM BUS-BAR

REPLACE CABINETR

B

A

C D

E

FF

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL LOCATIONS IN

A SURFACE MOUNTED SINGLE-GANG BACK

BOX WITH A WHITE TWO PORT FACEPLATE.

2. THE UNUSED TOP PORT OF THE

FACEPLATE IS TO BE FILLED WITH A BLANK

KEYSTONE JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED

BELOW WHITEBOARD AT STANDARD

HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE WALL

AT STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED BY

CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH SERVICE

LOOP LONG ENOUGH TO REACH THE

FARTHEST LOCATION IN THE ASSOCIATED

ROOM. SECURELY FASTEN SERVICE LOOP

TO STRUCTURE.

7. TERMINATE ALL CATEGORY 6A CABLES ON

WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE

ESTIMATED, USE BEST PRACTICES FOR

INSTALLATION LOCATION.

9. FOR ESTIMATES ASSUME ALL CABINETS

NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/27/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

SWARTZ CREEK

MIDDLE SCHOOL

MS-T101E

KEYMAP

101E

NTS

M.S. UNIT E

Sheets and Views
MS-T101E

File details come from the government source that posted it. Updated .