SPEC Vol 2 GSA LBJ DoED.pdf

PDF 10 MB Posted

Attached to
Solicitation Notice - LBJ Consolidation & Switchgear Federal contract opportunity
Solicitation number
47PM0121R0013
Issued by
General Services Administration Public Buildings Service

About this file

This document provides details of a solicitation notice for construction services related to the LBJ Consolidation Construction & Switchgear project. The General Services Administration Public Buildings Service is seeking a firm fixed price contract to provide repair, alteration, and construction services including interior alterations and open workspace construction as well as significant renovations to the major switchgear and electrical systems servicing the LBJ building in Washington D.C. The work includes renovating approximately 198,369 square feet of existing office space to reconstruct as open office space and meeting space to accommodate approximately 600 additional employees for the Department of Education. The solicitation closing date is June 4, 2021 at 4:00 PM EDT. Interested firms must register in the System for Award Management and attend the pre-proposal conference on May 5, 2021. The North American Industry Classification System code for this work is 236220 and the small business size standard is $39.5 million in average annual receipts over the past three years.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation Notice - LBJ Consolidation & Switchgear, newest first.
File Type Posted
Bid Spreadsheet_Rev_6.7.21.xlsx XLSX spreadsheet
AS-50-06 - Sign Types Detail Sheet.pdf PDF
Solicitation 47PM0121R0013 revised 20210604.pdf PDF
AS-50-03 - Sign Types Detail Sheet.pdf PDF
RFIs (Round 2) and Response 6.4.21.pdf PDF
GSA-DoED_Addendum-02_MEP_5.24.21.pdf PDF
Bid Spreadsheet_Rev 1_5.24.21.xlsx XLSX spreadsheet
012400 Options_5.24.21 Revision.pdf PDF
26 32 13 - ENGINE GENERATOR(S) AND ACCESSORIES.pdf PDF
PBS Past Performance Form.docx DOCX document
Solicitation 47PM0121R0013 revised 20210525.pdf PDF
SF30 47PM0121R0013_0002.pdf PDF
RFI and Response_5.24.21.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 3.pdf PDF
LBJ 1959 Full Set Vol 1.pdf PDF
SF30 47PM0121R0013_0001.pdf PDF
PreProposal Minutes Attendee List.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 1 SMALL.pdf PDF
GSA LBJ DoED IFB SPEC Vol 1rev.pdf PDF
LBJ 1959 Full Set Vol 2.pdf PDF
LBJ 1995 Architectural Set.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 2.pdf PDF
SOW LBJ Consolidation Construction Services.pdf PDF
Instructions LBJ Virtual Site Walk READ ME.pdf PDF
Drawings - ARCH Vol 1.pdf PDF
Drawing - Signage.pdf PDF
Drawing - TELE.pdf PDF
1914_GSA-DoED_Switchgear - Electrical_210423.pdf PDF
Layout for staging - switchgear.pdf PDF
2019.07.12_LBJ_BPP 100% Submission.pdf PDF
SF1442 47PM0121R0013.pdf PDF
Agreement (draft) RFP 47PM0121R0013.pdf PDF
Bid Spreadsheet.xlsx XLSX spreadsheet
Drawings - ARCH Vol 2.pdf PDF
Drawing - FP.pdf PDF
LBJ_5thFl_bathrooms-Staging.pdf PDF
SFLLL.pdf PDF
Solicitation 47PM0121R0013.pdf PDF
Reps and Certs 47PM0121R0013.pdf PDF
Drawing - PLUM.pdf PDF
SPEC Vol 1 GSA LBJ DoED.pdf PDF
LBJ_2ndFl_bathrooms-Staging.pdf PDF
GSA527.pdf PDF
Drawing - HVAC.pdf PDF
Drawing - FA.pdf PDF
Drawing - ELEC.pdf PDF
Drawing - AV.pdf PDF
1914_GSA-DoED_L2 L5 - Combined_210423.pdf PDF
Contractor Site Office.pdf PDF
Narrative Modernization Issue for Bid LBJ 2021April23.pdf PDF
Show all 50

Solicitation Notice - LBJ Consolidation & Switchgear has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERTY OF UNITED STATES GOVERNMENT -

FOR OFFICIAL USE ONLY

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

TABLE OF CONTENTS 000010 - 1

04/23/2021

LBJ FEDERAL BUILDING CONSOLIDATION

The following listed documents comprise the project manual for the project listed above. Where numerical sequence of sections is interrupted, such interruptions are intentional.

The complete Project Manual for this project consists of the listed Volume(s), which must not be separated for any reason. The Architect and Owner disclaim any responsibility for any assumptions made by a contractor or subcontractor who does not receive a complete Project Manual, including all sections listed in the Table of Contents.

Design Issue TABLE OF CONTENTS Firm Date

VOLUME 1

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary KSP 04/23/2021 011400 Work Restrictions KSP 04/23/2021 012100 Allowances KSP 04/23/2021 012300 Alternates KSP 04/23/2021 012400 Options KSP 04/23/2021 012500 Substitution Procedures KSP 04/23/2021 Substitution Request Form 012700 Unit Prices KSP 04/23/2021 012900 Payment Procedures KSP 04/23/2021 013000 Electronic Project Management KSP 04/23/2021 013100 Project Management and Coordination KSP 04/23/2021 013110 Critical Path Method Scheduling KSP 04/23/2021 013200 Construction Progress Documentation KSP 04/23/2021 013220 Photographic Documentation KSP 04/23/2021 013300 Submittal Procedures KSP 04/23/2021 013510 Historic Building Treatment Procedures KSP 04/23/2021 013600 Construction-Operations Building Information Exchange KSP 04/23/2021 014000 Quality Assurance and Control Requirements KSP 04/23/2021 014100 Structural Testing Laboratory Services KSP 04/23/2021 014200 References KSP 04/23/2021 014339 Mockups KSP 04/23/2021 015000 Temporary Facilities and Controls KSP 04/23/2021 015930 Security Regulations KSP 04/23/2021 015950 Safety and Health KSP 04/23/2021 016000 Product Requirements KSP 04/23/2021 017000 Execution Requirements KSP 04/23/2021 017310 Cutting and Patching KSP 04/23/2021 017320 Selective Demolition KSP 04/23/2021 017350 Fire Prevention Precautions for Hot Work KSP 04/23/2021 017419 Construction and Demolition Waste Management A10 04/23/2021 and Disposal

TABLE OF CONTENTS 000010 - 2

04/23/2021

017700 Closeout Procedures KSP 04/23/2021 017810 Project Record Documents KSP 04/23/2021 017822 Operation and Maintenance Documentation KSP 04/23/2021 018113 Sustainable Design Requirements A10 04/23/2021 018119 Construction Indoor Air Quality Requirements A10 04/23/2021 018200 Demonstration and Training KSP 04/23/2021 018601 General Acoustical Requirements Threshold 04/23/2021

DIVISION 02 - EXISTING CONDITIONS

024296 Historic Removal and Dismantling KSP 04/23/2021

DIVISION 03 - CONCRETE

035416 Hydraulic Cement Underlayment KSP 04/23/2021

DIVISION 04 – MASONRY

042200 Concrete Unit Masonry KSP 04/23/2021

DIVISION 05 - METALS

055000 Metal Fabrications KSP 04/23/2021 057500 Decorative Formed Metal KSP 04/23/2021

DIVISION 06 - WOOD, PLASTICS AND COMPOSITES

061053 Miscellaneous Rough Carpentry KSP 04/23/2021 064023 Interior Architectural Woodwork KSP 04/23/2021 064113 Wood-Veneer-Faced Architectural Cabinets KSP 04/23/2021 064216 Flush Wood Paneling KSP 04/23/2021

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

072100 Thermal Insulation KSP 04/23/2021 078413 Penetration Firestopping KSP 04/23/2021 078443 Joint Firestopping KSP 04/23/2021 079200 Joint Sealants KSP 04/23/2021 079219 Acoustical Joint Sealants Threshold 04/23/2021

DIVISION 08 – OPENINGS

081113 Hollow Metal Doors and Frames KSP 04/23/2021 081416 Flush Wood Doors KSP 04/23/2021

081700 Integrated Door Opening Assemblies KSP 04/23/2021 083113 Access Doors and Frames KSP 04/23/2021 084113 Aluminum-Framed Entrances and Storefronts KSP 04/23/2021

084126.23 Interior All-Glass Entrances KSP 04/23/2021

087100 Door Hardware LaForce 04/23/2021 088000 Glazing KSP 04/23/2021 088113 Decorative Glass Glazing KSP 04/23/2021

TABLE OF CONTENTS 000010 - 3

04/23/2021

088300 Mirrors KSP 04/23/2021

DIVISION 09 – FINISHES

090161 Stone Cleaning and Restoration KSP 04/23/2021 092216 Non-Structural Metal Framing KSP 04/23/2021 092900 Gypsum Board KSP 04/23/2021 093013 Ceramic Tiling KSP 04/23/2021 093023 Glass Mosaic Tiling KSP 04/23/2021 095113 Acoustical Panel Ceilings KSP 04/23/2021 096340 Stone Flooring KSP 04/23/2021 096400 Wood Flooring KSP 04/23/2021 096513 Resilient Base and Accessories KSP 04/23/2021 096543 Linoleum Flooring KSP 04/23/2021 096813 Tile Carpeting KSP 04/23/2021 096816 Sheet Carpeting KSP 04/23/2021 097200 Wall Coverings KSP 04/23/2021 097513 Stone Wall Facing KSP 04/23/2021 097723 Fabric-Wrapped Panels KSP 04/23/2021 099123 Interior Painting KSP 04/23/2021

DIVISION 10 – SPECIALTIES

101423.16 Room-Identification Panel Signage KSP 04/23/2021

102113.14 Stainless-Steel Toilet Compartments KSP 04/23/2021

102113.16 Plastic-Laminate-Clad Toilet Compartments KSP 04/23/2021 102219 Demountable Partitions KSP 04/23/2021 102600 Wall and Door Protection KSP 04/23/2021 102800 Toilet Accessories KSP 04/23/2021 104413 Fire Protection Cabinets KSP 04/23/2021 104416 Fire Extinguishers KSP 04/23/2021 104513 Photoluminescent Egress Path Markings KSP 04/23/2021

DIVISION 11 - EQUIPMENT

113013 Residential Appliances KSP 04/23/2021

DIVISION 12 - FURNISHINGS

122413 Roller Window Shades KSP 04/23/2021 133640 Stone Countertops KSP 04/23/2021

123661.16 Solid Surfacing Countertops KSP 04/23/2021

VOLUME 2

DIVISION 21 - FIRE SUPPRESSION

210001 Design Documents Separation of Work between the Trades WSP 04/23/2021 210002 Fire Protection General Conditions WSP 04/23/2021 210003 Scope of Work WSP 04/23/2021

TABLE OF CONTENTS 000010 - 4

04/23/2021

210517 Sleeves and Seals for Fire Suppression Piping WSP 04/23/2021 210518 Escutcheons for Fire Suppression Piping WSP 04/23/2021 210519 Meters and Gauges for Fire Suppression Systems WSP 04/23/2021 210520 Piping and Fitting Materials WSP 04/23/2021 210523 Fire Suppression Valves WSP 04/23/2021 210529 Hangers, Supports, Anchors and Guides for Fire Suppression Systems WSP 04/23/2021 210553 Identification of Fire Suppression Piping and Equipment WSP 04/23/2021 211313 Wet Pipe Sprinkler Systems WSP 04/23/2021

DIVISION 22 – PLUMBING

220001 Design Documents Separation of Work between the Trades WSP 04/23/2021 220002 Plumbing General Conditions WSP 04/23/2021 220003 Scope of Work WSP 04/23/2021 220004 Unit Prices WSP 04/23/2021 220517 Sleeves and Sleeve Seals for Plumbing Piping WSP 04/23/2021 220518 Escutcheons for Plumbing Piping WSP 04/23/2021 220519 Meters and Gauges for Plumbing Piping WSP 04/23/2021 220523 Valves WSP 04/23/2021 220529 Hangers, Supports, Anchors, Guides and Seismic Restraint WSP 04/23/2021 220530 Disinfecting of Water Supply System WSP 04/23/2021 220553 Identification of Plumbing Piping and Equipment WSP 04/23/2021 220580 Access Doors in General Construction WSP 04/23/2021 220590 Testing WSP 04/23/2021 220719 Insulation WSP 04/23/2021 221116 Domestic Water Piping and Fitting Materials WSP 04/23/2021 221119 Domestic Water Specialties WSP 04/23/2021 221316 Sanitary Waste and Vent Piping and Fitting Materials WSP 04/23/2021 221319 Sanitary Waste Piping Specialties WSP 04/23/2021 223300 Electric Domestic Water Heaters WSP 04/23/2021

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING

230002 Heating, Ventilation and Air Conditioning General Conditions WSP 04/23/2021 230005 Access Doors in General Construction WSP 04/23/2021 230513 Electric Motors WSP 04/23/2021 230516 Expansion Compensators WSP 04/23/2021 230523 Valves WSP 04/23/2021 230529 Hangers, Anchors and Supports WSP 04/23/2021 230540 Acoustics WSP 04/23/2021 230548 Vibration Isolation WSP 04/23/2021 230553 Systems Identification WSP 04/23/2021 230593 Testing, Adjusting and Balancing WSP 04/23/2021 230700 Insulation WSP 04/23/2021 230810 Basic Commissioning of HVAC Systems WSP 04/23/2021 230900 Instruments WSP 04/23/2021 230923 Building Management System WSP 04/23/2021 231113 Sheet Metal, Ductwork and Accessories WSP 04/23/2021 232500 Pipe Cleaning and Chemical Water Treatment WSP 04/23/2021

TABLE OF CONTENTS 000010 - 5

04/23/2021

232600 Water Specialties WSP 04/23/2021 233313 Dampers WSP 04/23/2021 233600 Air Terminal Units WSP 04/23/2021 233610 Air Outlets and Inlets WSP 04/23/2021 235210 Piping and Accessories WSP 04/23/2021 238123 Computer Room Air Conditioning Units WSP 04/23/2021 238500 Variable Frequency Controllers WSP 04/23/2021 238600 Electric Motor Controllers WSP 04/23/2021

DIVISION 26 – ELECTRICAL

260001 Electrical General Conditions WSP 04/23/2021 260005 Access Doors in General Construction WSP 04/23/2021 260265 Testing, Adjusting and Balancing WSP 04/23/2021 260270 Temporary Lighting and Power WSP 04/23/2021 260280 Equipment Connections and Coordination WSP 04/23/2021 260290 Ceiling Floor and Wall Electrical Penetration Fire Seals WSP 04/23/2021 260512 5 KV Cable WSP 04/23/2021 260513 15 KV Cable WSP 04/23/2021 260519 600 Volt Wire and Cable WSP 04/23/2021 260526 Grounding System WSP 04/23/2021 260533 Raceways and Boxes WSP 04/23/2021 260548 Vibration Isolation and Seismic Restraints WSP 04/23/2021 260553 Identification for Electrical Systems WSP 04/23/2021 260573 Overcurrent Protective Device Coordination Study WSP 04/23/2021 260800 Commissioning of Electrical Systems WSP 04/23/2021 260913 Power Monitoring System WSP 04/23/2021 260914 Battery Monitoring System WSP 04/23/2021 261120 480-277V Multi Section Substations WSP 04/23/2021 261315 125 Volt DC Battery System WSP 04/23/2021 261316 Metal Enclosed Interrupter Switches WSP 04/23/2021 262310 50 kV Double-Ended Distribution Switchgear – BB Non-ARC WSP 04/23/2021 262416 Panelboards WSP 04/23/2021 262726 Wiring Devices WSP 04/23/2021 262813 Fuses (600V and Less) WSP 04/23/2021 262814 Fuses Over 600V WSP 04/23/2021 262816 Disconnect Switches WSP 04/23/2021 262919 Switchboards WSP 04/23/2021 263213 Engine Generator and Accessories WSP 04/23/2021 263623 480-277 Volt Automatic Transfer Switches WSP 04/23/2021 264002 Analog/Addressable Voice Evacuation Fire Alarm Systems WSP 04/23/2021 264313 Surge Protection Device WSP 04/23/2021 265000 Luminaires and Accessories WSP 04/23/2021 265006 Lighting Control Devices WSP 04/23/2021

DIVISION 27 – COMMUNICATIONS

270526 Grounding and Bonding for Communications Systems WSP 04/23/2021 270528 Pathways for Communications Systems WSP 04/23/2021 271100 Communications Equipment Room Fittings WSP 04/23/2021

TABLE OF CONTENTS 000010 - 6

04/23/2021

271500 Communications Horizontal Cabling WSP 04/23/2021 274116 Integrated Audio-Video Systems and Equipment Threshold 04/23/2021 275119 Sound Masking Systems Threshold 04/23/2021

APPENDIX A

Audio Video Systems Threshold 04/23/2021

END OF TABLE OF CONTENTS

DESIGN DOCUMENTS SEPARATION OF

WORK BETWEEN THE TRADES

210001 - 1 04/23/2021

SECTION 210001

DESIGN DOCUMENTS

SEPARATION OF WORK BETWEEN THE TRADES

PART 1 - GENERAL

1.1 DESCRIPTION

A. The specifications delineate various items of related work under separate trade headings in accordance with the Design Documents as listed below.

B. Indications that the electrical and mechanical trades are to perform an item of work means that they are to perform the work for their own accommodation only, except as specifically noted otherwise.

C. Key to Abbreviations:

"OTHER" = Provided for Owner by Construction Manager or General Contractor

"PLBG" = Plumbing

"FP" = Fire Protection

"HVAC" = Heating, Ventilating and Air Conditioning

"ELECT" = Electrical

"F" = Furnished

"I" = Installed

"P" = Provided (Furnished and Installed)

"C" = Final Connection

D. The following is a list of work and the trade or trades that perform the work:

DESIGN DOCUMENTS SEPARATION OF

WORK BETWEEN THE TRADES

210001 - 2 04/23/2021

Other Plbg FP HVAC Elect Notes

Temporary Heat P

Temporary Water P

Temporary Light and Power P

Temporary Fire Standpipe P

Temporary Toilets P

Excavation and Backfill for M&E Inside Bldg for M&E Outside Bldg

P

Dewatering Site and Excavation P

Subsoil Drainage Inside Building Outside Building

C

Footing Drains P C

Drywells P

Manhole & Covers P P P P

Concrete Equipment Bases and Pads:

Inside Building Outside Building

Masonry Pits P

Pit Frames and Covers I F

Fuel Oil Tank Cradle P

Trenches in Floor Slabs P

Anchors and Vibration Mounts in Inertia Blocks

I F F F F

Concrete Encasement of Underground Runs

P P P P

Fastening and Supports P P P P

Cutting, Chasing and Patching P P P P

Framed Slots and Openings I F F F F

Sleeves through Slabs, Decks and Walls P P P P

Waterproof Sealing of Openings P P P P

Fireproof Sealing of Excess Openings P P P P

Drilling and Cutting of all Holes P P P P

DESIGN DOCUMENTS SEPARATION OF

WORK BETWEEN THE TRADES

210001 - 3 04/23/2021

Other Plbg FP HVAC Elect Notes

Hoisting and Rigging P P P P

Floor Drain Flashing P

Base Flashing for all Roof Penetrations P

Cap Flashing for all Roof Piping Penetrations

P P P P

Roof Curb Base Flashing P

Roof Curb Cap Flashing P

Prime Painting M&E Work P P P P

Field Touch-Up Painting P P P P

Rustproofing Field Cut Iron Work P P P P

Color Coding M&E Work P P P P

Precast Receptors P

Shower Stall Pan Flashing P

Toilet Room Accessories P

Soap Dispensers P

Domestic Water Make-Up P

Fire Hose & Cabinets P

Fire Extinguishers P

Fire Extinguisher Cabinets P

Finished Access Doors and Frames I F F F F

Ladders & Catwalks P

Motors for Mechanical Equipment P P P

Loose Motor Controls for Mechanical Equipment

F F F I

Motor Control Centers P

Disconnect Switches P

Wiring for Equipment Motors and Starters

P

Premounted and Prewired Starters and Disconnects

P P P C

Electric Radiators and Convectors P

DESIGN DOCUMENTS SEPARATION OF

WORK BETWEEN THE TRADES

210001 - 4 04/23/2021

Other Plbg FP HVAC Elect Notes

Electric Duct Heaters P C

Heat Tracing Cable F F F I

Electric Water Heater P C

Plaster Frames for Ceiling Mounted Fixtures, Ceiling Diffusers, etc.

I F F

Cellular Decking P

Trench Headers P

Preset Activation Kits P

Power Circuit to Starter Disconnect Switch and Motor

P

Line Voltage Control Device (Aquastat) etc.

P P C

Control Device Not in Power Circuit to Motor

P P

Temperature Control Device and Electric Actuator

P P

Sprinkler and Standpipe Alarm System:

Devices Panels

Halon, Deluge and Pre-Action Sprinkler, Smoke and Thermal Detection

P

Space Smoke Detector P

Duct Smoke Detector I F&C

Smoke Control/Fire Alarm Panel P

Boiler and Refrigeration Room Shut-off and Break Glass

P C

Kitchen Hood Fire Suppression System P C

Lighting Fixtures P

Exterior Wall Louvers P

Radiator Enclosures P

Ornamental Grilles P

DESIGN DOCUMENTS SEPARATION OF

WORK BETWEEN THE TRADES

210001 - 5 04/23/2021

Other Plbg FP HVAC Elect Notes

Air Boots for Air/Light Fixtures and Perimeter Slots

P

Raised Floor P

Air Outlets in Raised Floor I F

Masonry Chimney Breeching Frame P

Masonry Chimney Cleanout Door P

Prefabricated Chimney P

Kitchen Range Hood P

Dishwashing Hoods P

Food Service Equipment P C C C

Refrigerators P C

Refrigerator Condensing Units, Air Cooled

P C

Refrigerator Condensing Units, Water Cooled

P C C

Lightning Protection P

Surgical Lights P C

Pneumatic Tube System P C

Exterior Transformer Vault P

Incinerator P C C C

Elevator P C

Escalator P C

Lifts P C

Laboratory Equipment P C C C

Hospital Equipment P C C C

Laundry Equipment P C C C

Window Washing Machines P C C

Linen/Garbage Chutes P C

Vermiculite Fireproofing P

Rubbish Removal P P P P

Maintenance Tools F F F F

DESIGN DOCUMENTS SEPARATION OF

WORK BETWEEN THE TRADES

210001 - 6 04/23/2021

E. SPECIFIC NOTES:

1. Plumbing Trade to provide sizes and locations.

2. Covers and Frames for sewage ejectors, sump pump and silt pits furnished by

Plumbing Trade.

3. Details furnished by individual Trades.

4. Final connections included in HVAC work.

5. When not part of premounted starter.

6. Insulation covering by each Trade after heating cable is connected and tested.

7. Preparation of cells for electricification is in Electrical work.

8. Purchased by Electrical Trade.

9. Power to Halon Control Panel by Electrical Trade; tie into fire alarm system by

Electrical Trade; all other by Fire Protection Trade.

10. Power to Kitchen Hood Fire Protection System and gas pipe solenoid valve by

Electrical Trade; tie into fire alarm system by Electrical Trade.

11. Duct connections and safing of unused portions of louvers by HVAC Trade.

12. Except where custom enclosures are provided by others.

13. Where one Trade furnishes and another installs, the installing Trade removes the shipping and packing materials where accumulated.

PART 2 - PRODUCTS

2.1 NOT USED.

PART 3 - EXECUTION

3.1 NOT USED.

END OF SECTION

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 1 04/23/2021

SECTION 210002

FIRE PROTECTION GENERAL CONDITIONS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Contractor shall refer to Division 01 for all general requirements for the project, except as specified herein.

B. The General and Supplementary Conditions accompanying these Specifications are hereby made a part of the requirements for the work under this Division of the Specification.

C. Where General Conditions and Supplementary General Conditions clauses are repeated in these Specifications, it is to call special attention to them, or as a further qualification. No General Conditions and/or Supplementary General Conditions clause referring to the work of this Section shall be considered waived unless specifically stated herein.

D. Before submittal of bid, examine all drawings, specifications, addenda, alternates, special conditions, and all other bidding documents of all Sections of this project. Verify all governing conditions at the site, and become fully informed as to the extent and character of the work required, as well as its relation to other work in the building.

Submittal of a bid is an agreement to all requirements of the Contract Documents, and no consideration will be granted for any claimed misunderstanding thereof.

E. Submittal of a bid is deemed a representation by the bidder that it is qualified in all respects to perform the work for which it is bidding and has experience with similar work.

F. Indemnify the Owner and the Architect/Engineer against loss, liability, damage or expense, including attorneys' fees, in connection with any claim resulting from damage which may be asserted by any third party.

G. Related Work Specified Elsewhere

1. Section 017419 - Construction and Demolition Waste Management and Disposal.

2. Section 018113 - Sustainable Design Requirements.

3. Section 018119 - Construction Indoor Air Quality Requirements.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 2 04/23/2021

1.2 SUSTAINABLE DESIGN REQUIREMENTS

A. Sustainable Design Requirements: The Owner requires the Contractor to implement practices and procedures to meet the Project’s environmental performance goals, which include achieving LEED v4 Certification. Refer to Section 018113 - SUSTAINABLE DESIGN REQUIREMENTS for the Project’s target certification level and specific LEED requirements. The Contractor shall ensure that the requirements related to the Project’s sustainability design goals are implemented to the fullest extent. Substitutions, or other changes to the work proposed by the Contractor or their Subcontractors, shall not be allowed if such changes compromise the Project’s sustainability goals and LEED certification.

1.3 WORK INCLUDED

A. Provide labor and materials required to install, test and place into operation the Fire Protection systems as called for in the contract documents, and according to applicable codes and regulations.

B. Furnish and install all labor, materials, apparatus, and appliances essential to the complete functioning of the systems described and/or indicated herein, or which may be reasonably implied as essential whether mentioned in the Contract Drawings and Specifications or not.

C. The Contractor shall accept delivery of the pre-purchased equipment at the site, inspect the equipment on delivery for damage, and install the equipment. The Contractor shall be responsible for the equipment, provide all labor, material, and accessories as required for a complete functioning system. The Contractor shall have complete responsibility as if he provided the equipment including warranties.

1.4 REQUESTS FOR INFORMATION (RFI)

A. Contractor may submit a formal request for additional information or clarification to the Engineer should the Contract Documents present missing or conflicting information.

B. The Engineer shall consider the RFI closed upon response.

1.5 SUBMITTALS

A. Submit all of the following as called for hereinafter:

1. Submittal log with submittal schedule.

2. Shop drawings.

3. Manufacturer’s data.

4. Product Samples.

5. Test Reports.

6. Certifications.

7. Calculations.

8. Coordination drawings.

9. Alternate equipment and material proposal.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 3 04/23/2021

10. Detailed project schedule.

11. Operating and maintenance manuals.

12. Record “As-Built” drawings.

B. Submit a single guarantee stating that all parts of the work are in accordance with Contract requirements. Guarantee work against faulty and improper material and workmanship for a minimum period of two (2) years from date of final acceptance by the Owner or as specified in the Construction Manager’s rider whichever is more stringent, except that where guarantees or warranties for longer terms are specified herein, such longer term to apply. Within 24 hours after notification, correct any deficiencies which occur during the guarantee period at no additional cost to the Owner, to the satisfaction of the Owner and Engineer. Obtain similar guarantees from subcontractors, manufacturers, suppliers and sub-trade specialist.

C. LEED v4 Submittals: For all interior, wet-applied adhesives, sealants, paints and coatings related to the work of this Section, submit product and material documentation as outlined in the Submittals article of Section 018113 – Sustainable Design Requirements.

1.6 QUALITY ASSURANCE

A. Comply with current the currently enforced versions of all governing codes, ordinances and regulations, as well as with requirements of the currently enforced versions of EPA, OSHA, U.L. and all other applicable codes and the rules, regulations and requirements of the utility companies serving the project.

B. Comply with the requirements of agencies or authorities having jurisdiction over any part of the work and secure and pay for all necessary permits.

C. Where codes or standards are listed herein, the applicable portions apply.

D. Plans, specifications, codes and standards are minimum requirements. Where requirements differ, apply the more stringent.

E. Should any change in plans or specifications be required to comply with governing regulations, notify the Architect/Engineer at the time of submitting this bid.

F. Execute work in strict accordance with the best practices of the trades in a thorough, substantial, workmanlike manner by competent workmen. Provide a competent, experienced full-time Superintendent who is authorized to make decisions on behalf of the Contractor.

G. All equipment, materials and methods to be furnished and/or installed by this Division shall comply with all applicable requirements of laws, codes, ordinances, standards, etc., of all federal, state, and local authorities, whether indicated on the Contract Documents or not.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 4 04/23/2021

1.7 ABBREVIATIONS AND DEFINITIONS

A. Abbreviations

1. AABC American Association of Balancing Contractors

2. ABMA American Boiler Manufacturers Association

3. ADC Air Diffusion Council

4. AGA American Gas Association

5. AMCA Air Movement and Control Association

6. ANSI American National Standards Institute

7. ARI Air Conditioning and Refrigeration Institute

8. ASA Acoustical Society of America

9. ASHRAE American Society of Heating, Refrigerating, and

Air Conditioning Engineers

10. ASME American Society of Mechanical Engineers

11. ASPE American Society of Plumbing Engineers

12. ASTM American Society for Testing and Materials

13. ASSE American Society of Sanitary Engineers

14. AWWA American Water Works Association

15. CTI Cooling Tower Institute

16. EPA Environmental Protection Agency

17. FM (FMS) Factory Mutual (Factory Mutual System)

18. FS Federal Specifications

19. IEEE Institute of Electrical and Electronic Engineers

20. NAPHCC National Association of Plumbing Heating &

Cooling Contractors

21. NEBB National Environmental Balancing Bureau

22. NEC National Electric Code

23. NEMA National Electrical Manufacturers Association

24. NFPA National Fire Protection Association

25. OSHA Occupational Safety and Health Administration

26. SAE Society of Automotive Engineers

27. SMACNA Sheet Metal and Air Conditioning Contractors

National Association

28. U.L. Underwriters Laboratories

B. Definitions

1. "PROVIDE" means to "Furnish" and "Install" and make complete, safe, and operable, the particular work referred to unless specifically indicated otherwise.

2. "INSTALL" means to join, unite, fasten, link, attach, set up or otherwise connect together before testing and turning over to the Owner, complete and ready for regular operation, the particular work referred to.

3. "FURNISH" means to purchase and supply all materials, labor, equipment, testing apparatus, controls, tests, accessories and all other items customarily required for the proper and complete application for the particular work referred to.

4. "Work": labor, materials, equipment, services, and all related accessories necessary for the proper and complete installation of complete systems.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 5 04/23/2021

5. "AS DIRECTED" means as directed by the Architect/Engineer, or his representative.

6. "CONCEALED" means embedded in masonry or other construction, installed behind wall furring or within double partitions, or installed within hung ceilings, shafts, or accessible raised floor cavities.

7. "SUBMIT" means submit to Engineer for review. Refer to Architectural General and Special Conditions for proper procedures.

8. "Piping": pipe, tube, fittings, flanges, valves, controls, strainers, hangers, supports, unions, traps, drains, insulation and all related accessories.

9. "Wiring": raceway, fittings, wire, boxes and all related accessories.

10. "Indicated," "shown," or "noted": as indicated, shown, or noted on drawings or specifications.

11. "Similar" or "equal": of base bid manufacture, equal in quality materials, weight, size, performance, design, and efficiency of specified product, conforming to "Base Bid Manufacturers."

12. "Reviewed" "satisfactory," "accepted," or "directed": as reviewed, satisfactory, accepted, or directed by Architect and/or Engineer.

13. "Motor Controllers": manual or magnetic starters with or without switches, individual pushbuttons or hand-off-automatic (HOA) switches controlling the operation of motors.

14. "Control or Actuating Devices": automatic sensing and switching devices such as thermostats, pressure, float, flow, operation of equipment.

15. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawl spaces, and tunnels.

PART 2 - PRODUCTS

2.1 LEED PERFORMANCE REQUIREMENTS

A. For all interior, wet-applied adhesives, sealants, paints and coatings related to the work of this Section, provide products and materials that meet the Project’s LEED performance criteria as outlined in PART 2–PRODUCTS of Section 018113 – Sustainable Design Requirements.

2.2 EQUIPMENT AND MATERIALS

A. If products and materials are specified or indicated on the Contract Drawings for a specific item or system, use those products or materials. If products and materials are not listed in either of the above, use first class products and materials, subject to approval of the Engineer.

B. Provide products and materials that are new, clean, free of defects and free of damage and corrosion.

C. All products and materials used in this project shall not contain any material which is considered hazardous by the Department of Environmental Protection or any other agency having jurisdiction.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 6 04/23/2021

D. Replace materials of less than specified quality as designated by the Engineer and relocate work incorrectly installed as determined by the Engineer.

E. Provide name/data plates on all components of equipment with manufacturer's name, model number, serial number, capacity data and electrical characteristics attached in a conspicuous place.

F. Install materials and equipment with qualified trades people.

G. Maintain uniformity of manufacture for equipment used in similar applications and sizes.

H. Applicable equipment and materials to be listed by Underwriters' Laboratories and manufactured in accordance with ASME, AWWA, or ANSI standards, and as approved by local authorities having jurisdiction.

I. Fully lubricate equipment to manufacturer’s requirements when installed and prior to operation.

J. Do not operate gas, or water systems until piping has been cleaned and startup strainers are in place.

K. Locate all floor mounted equipment on a 4" high concrete pad. Concrete work to be provided by another trade. Coordinate size and location with General Contractor providing concrete pads.

L. Secure equipment with bolts, washers and locknuts of ample size to support equipment. Embedded anchor bolts to have bottom plate and pipe sleeves. Grout machinery set in concrete under the entire bearing surface. After grout has set, remove wedges, shims and jack bolts and fill space with grout.

M. Locate valves, traps, access doors, etc., to be easily accessible, either in mechanical spaces or through access panels as specified hereinafter, or as required. Coordinate and obtain Architect's and Engineer's approval of access panel locations.

N. Follow manufacturers' instructions for installing, connecting, and adjusting equipment.

Provide one (1) copy of such instructions to the Engineer before installing any equipment. Provide a copy of such instructions and attach to the equipment during work on the equipment.

O. Pressure vessels and relief valves shall be selected, built and labeled in accordance with ASME. Obtain a certificate from the City Inspector having jurisdiction showing such acceptance and mount this certificate in a black frame under glass or laminated plastic adjacent to each pressure vessel and relief valve.

P. Where factory testing of equipment is required to ascertain performance and attendance by the Owner's representative is required to witness such tests, associated travel costs and subsistence shall be borne by the Contractor.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 7 04/23/2021

Q. Equipment capacities, etc., are scheduled or specified for job site operating conditions.

Equipment sensitive to altitude shall be derated with the method of derating identified on shop drawings.

2.3 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

A. Immediately after notice to proceed by the Owner or Owner's Representative, or after execution of Owner/Contractor Agreement, submit to the Engineer for review, a complete typed list of all mechanical equipment manufacturers and material suppliers for the equipment intended to be furnished and installed on this project as well as names of all subcontractors.

B. Immediately after notice to proceed by the Owner or Owner's Representative, or after execution of Owner/Contractor Agreement, submit to the Engineer for review, a complete typed list of all mechanical equipment manufacturers and material suppliers for the equipment intended to be furnished and installed on this project as well as names of all subcontractors.

C. After the Contract is awarded, obtain complete shop drawings, product data and samples from the manufacturers, suppliers, vendors, and all subcontractors, for all materials and equipment specified in the various sections of the specification. Submit data and details of such materials and equipment for review by the Engineer. Prior to submission of the shop drawings, product data and samples to the Engineer, review and certify that these items are in compliance with the Contract Documents. Check all materials and equipment upon their arrival on the job site and verify their compliance with the Contract Documents. Modify any work which proceeds prior to receiving accepted shop drawings as required to comply with the Contract Documents and the shop drawings, at no cost to the project.

D. Prior to fabrication or installation of any work, completely coordinate work of all trades and prepare a complete set of Coordination Drawings.

E. All shop drawings shall be prepared using CAD software.

2.4 REVIEWS

A. Architect's and/or Engineer's review is for general compliance with the design concept and contract documents. Markings or comments or the lack thereof does not relieve the Contractor from compliance with the project plans and specifications. The Contractor remains solely responsible for details and accuracy, for confirming and correlating all quantities and dimensions, for selecting fabrication processes, for techniques of construction, for performing his work in a safe manner, and for coordinating his work with that of other trades.

B. No part of the work shall be started in the shop or in the field until the Architect and/or Engineer have reviewed and returned the shop drawings with No Exceptions Noted and samples for that portion of the work. Any work started prior to receipt of shop drawings with ‘No Exceptions Noted’ is at risk by this Contractor.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 8 04/23/2021

C. A minimum period of ten (10) working days, exclusive of transmittal time, will be required in the Engineer's office each time a shop drawing, product data and/or samples is submitted for review. This time period must be considered by the Contractor when scheduling his work.

D. Submit digital files (PDF format) of all submittals including sheet metal drawings, piping drawings, and catalog cuts.

E. Submissions will be stamped as follows:

No Exceptions Noted [ ]: When directed, fabrication, manufacture or construction may proceed providing submittal complies with the Contract

Documents.

Exceptions Noted [ ]: Work may proceed as above so long as the engineer's notations are complied with.

[ ] No Resubmission Required.

[ ] Resubmit For Record Only.

Revise and Resubmit [ ]: The submittal does not comply with the Contract Documents; do not proceed with fabrication, manufacture or construction. The work and shop drawings are not permitted at the job site.

Resubmit appropriate shop drawings.

2.5 SUBTITUTIONS OF MATERIALS AND EQUIPMENT

A. Substitutions are changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor

B. Contract Documents are based on materials specified and on equipment manufacturers indicated on the Contract Drawings. Approval by Engineer of equipment manufacturers other than those indicated on the Drawings or materials other than specified, does not relieve Contractor of any responsibility to provide equipment and materials which will meet the performance as stated or implied by the Contract Documents.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 9 04/23/2021

C. Submit proposals to supply substitutive materials, manufacturers or equipment, in writing, to the Engineer with sufficient lead time for review by Architect and Engineer prior to the date equipment must be ordered to maintain project schedule. Contractor submitting substitutes will reimburse Owner for all costs associated with the review of the proposed substitute whether the substitute is accepted or rejected. Include the following information with the proposal:

1. A clear note on the submittal that the proposal is a substitution.

2. A reason for submitting the substitution.

3. A line-by-line specifications review indicating a compliance of the proposed substitution with project specifications. All deviations and exceptions from the project specifications shall be clearly indicated.

4. A description of the difference between the contract requirements and the proposed substitute, the comparative features of each, and the effect of the change on the end result performance. Include the impact of all changes on other contractors and acknowledge the inclusion of implementation costs.

5. A list of the contract requirements that must be revised if the change is accepted, including any suggested specification revisions.

6. Include a description and estimate of costs the Owner may incur in implementing the change, such as test, evaluation, operating and support costs.

7. A projection of any effects the proposed change would have on collateral costs to the Owner.

8. A statement of the time by which a contract modification accepting the change must be issued, noting any effect on the contract completion time or the delivery schedule.

9. A statement indicating the reduction to the contract price if the Owner accepts the change. Include the estimated cost for appropriate modifications to all trades.

10. Include all revisions required to adapt substitutes in such proposals, including revisions by other trades. No increase in the contract price will be considered to accommodate the use of substitute equipment.

11. Where an equipment substitute is proposed, provide drawings indicating that adequate installation and maintenance space exists for the proposed equipment.

D. Wherever operating results such as quantity delivered or pressure obtained are scheduled, or when the make and size of apparatus, for which such quantities are readily determinable, is specified, the substitution being proposed must conform substantially to the quantities specified or implied. The substitution must fit into available space conditions and must function properly in coordination with the rest of the system.

2.6 LEED SUBMITTALS

A. LEED submittals are required to verify compliance with the “LEED Performance Criteria” defined in the Contract Documents.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 10 04/23/2021

B. LEED Reporting Form (LRF): Submit a completed LRF for the materials included in this section. The following information shall be provided:

1. Itemized material costs for the LEED Focus Materials (LFMs) identified under the “LEED Performance Criteria”.

2. Volatile Organic Compound (VOC) contents in grams/liter or lbs/gallon for all field applied adhesives and sealants used.

C. Supplementary information in addition to the LRF; the following sustainable building submittal information shall be provided:

1. LFM backup documentation.

2. Product cut sheets.

3. Green seal compliance (adhesives).

4. Verification of prohibited compounds in adhesives, sealants, and sealant primers.

5. Green seal compliance (paints).

6. Certification of composite wood or Agrifiber Resins.

7. Certification of composite wood or agrifiber laminating adhesives.

PART 3 - EXECUTION

3.1 LICENSES, PERMITS AND FEES

A. Arrange for required inspections and pay all license and inspection fees. Furnish a certificate of final inspections and approvals from local authority having jurisdiction over electrical installation and deliver to Architect.

B. This work shall include the procurement of and payment for all permits, certificates and fees for the performance of the electrical work in compliance with codes, applicable laws and municipal regulations including those from local utilities for services.

3.2 SHOP DRAWINGS & PRODUCT DATA

A. Submit materials and equipment by manufacturer, trade name and model number.

Include copies of applicable brochure or catalog material. Do not assume applicable catalogs are available in the Engineer's office. Maintenance and operating manuals are not suitable substitutes for shop drawings.

B. Identify each sheet of printed submittal pages (using arrows, underlining or circling) to show applicable sizes, types, model numbers, ratings, capacities and options actually being proposed. Cross out non-applicable information. Note specified features such as special tank linings, pump seals, materials or painting.

C. Provide project specific drawings for each piece of submitted equipment. Generic submittals that do not identify specific equipment to be used on the project will be returned and not reviewed.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 11 04/23/2021

D. Include dimensional data for roughing in and installation, technical data sufficient to verify that equipment meets requirements of drawings and specifications. Include wiring, piping and service connection data, motor sizes complete with voltage ratings and schedules.

E. Maintain a complete set of reviewed and stamped shop drawings and product data on site.

F. Prepare and submit detailed shop drawings for piping work and other distribution services in 3/8" = 1'-0" scale, including locations and sizes of openings in floor decks, walls and roofs.

G. For each room or area of the building containing mechanical equipment the following is required to be submitted for review and acceptance at the time of the equipment submittal.

1. Floor Plans:

a. Plan views (including sections & elevations) of the equipment indicated in the exact location in which it is intended to be installed. These plans shall be of a scale not less than 1/4" = 1' - 0". They shall be prepared in the following manner:

1) Indicate the physical boundaries of the space including door swings and ceiling heights and ceiling types (as applicable).

2) Illustrate all mechanical equipment proposed to be contained therein. Include top & bottom elevations of all mechanical equipment. The drawings must be prepared utilizing the dimensions contained in the approved equipment submittals.

Illustrate all access space requirements.

3) Illustrate all other equipment therein such as dampers, valves, pipes, conduits, structural elements, etc.

4) Note the operating weight of each piece of equipment.

5) Illustrate all dimensions of concrete pads, curbs, etc.

6) Note all code and maintenance required clearances from all equipment by dimensions, including overhead.

7) Any exterior wall or foundation penetrations.

2. Equipment Installation/Removal Routes:

a. Provide in conjunction with the above, a set of documents reproduced from the then current Contract Documents indicating the methods of equipment installation/removal for all major pieces of equipment.

b. Indicate on floor plans by means of arrows, the complete path for equipment installation/removal.

c. Where equipment will be required to be hung temporarily from a slab or beam, note same on the submission including the weight of the equipment to be hung and the weight of the hoisting equipment.

d. Note all heights of conduits, ductwork, link beams, doorways, transoms, piping, etc. in the proposed path assuring that adequate headroom is provided

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 12 04/23/2021

3. All shop drawings shall be prepared using CAD software.

4. The Contractor is not relieved of the responsibility for dimensions or errors that may be contained on submissions reviewed by the Engineer, or for deviations from requirements in the Contract Documents. Understand clearly that the Engineer's noting some errors but overlooking others does not grant the Contractor permission to proceed in error. Regardless of any information contained in the shop drawings, product data and samples, the Contract Documents govern the work and are neither waived nor superseded in any way by the review of shop drawings, product data and samples.

5. Inadequate or incomplete shop drawings, product data and/or samples will not be reviewed by the Engineer and will be returned to the Contractor for resubmittal.

6. Format: Indicate in the lower right-hand corner of each shop drawing, and each product data brochure on the front cover, the following:

7. The submittal identification number;

8. Title of the sheet or brochure;

9. Name and location of the Project;

10. Names of the Architect, Engineer, Contractor, Subcontractor, manufacturer, supplier, and vendor;

11. Date of submittal; page number; and the date of each correction and version and revision.

12. Number all pages and drawings consecutively from beginning to end.

13. Provide cover pages separating sections of each submittal.

14. All shop drawings and product data shall be provided with a table of contents and clearly tabulated. Hard copies and/or electronic submittals shall be bookmarked and indexed for easy navigation.

15. Unless the above information is included, the submittal will be returned for resubmission.

16. Submittals containing multiple unrelated elements will not be reviewed.

17. RESUBMITTALS

18. Include with resubmittals of product data or brochures a cover letter summarizing the corrections made in response to the review comments and the submittal page numbers which were revised.

19. Provide written responses to each of the comments from the prior submissions.

20. Shop drawings shall be bubbled to indicate the area of revision.

21. Resubmittals that do not include this information will be returned as “NOT

REVIEWED”.

3.3 CONTRACTOR'S COORDINATION DRAWINGS

A. Coordinate efforts of all trades and furnish, in writing, any information necessary to permit the work of all trades to be installed satisfactorily and with the least possible interference or delay.

B. Coordinate all new work with existing structure and with existing work which is to remain. Note all existing conditions which may interfere with new work as shown on the documents of this trade and of all other trades which are part of this project. Inform the Architect and Engineers of all such conditions in writing with sufficient time to address the conflicts so as not to affect project schedule.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 13 04/23/2021

C. Prepare a complete set of construction Coordination Drawings indicating the equipment actually purchased and the exact routing for all lines such as piping, busway, conduit, ductwork, etc., including conduit embedded in concrete. Use the sheet metal shop drawings as the base drawings to which all other contractors will add their work. Complete each Coordination Drawing and have signed-off by the other subcontractors and the General Contractor prior to the installation of the work in the area covered by the specific drawing. Maintain a set of these drawings on site for inspection by the Owner’s Representative.

D. Coordination drawings shall not be reviewed by the Engineer.

E. Indicate piping loads and support points for all piping 4" and larger, racked piping, and submit to the Structural Engineer for review and approval. Indicate the elevation, location, support points, static, dynamic and expansion forces and loads imposed on the structure at support, anchor points, and size of all lines. Indicate all beam penetrations and slab penetrations sized and coordinated. Indicate all work routed underground or embedded in concrete by dimension to column and building lines.

F. The requirement for Coordination Drawings is not authorization for the Contractor or Subcontractor to make any unauthorized changes to the Contract Drawings. Maintain all Design Drawing space allocations such as ceiling height, space directly above the ceiling for tenant buildout and flexibility, chase walls, equipment room size, etc., unless prior written authorization is received from the Architect to change them.

G. Work installed which interferes with work of any other trade will be corrected at no cost to the project.

H. This Contractor shall not install any work prior to “sign-off” of final coordination drawings by all trades. If electrical work proceeds prior to this sign-off, this Contractor shall be responsible for all costs resulting to correct interferences and conflicts, along with any schedule implications.

3.4 COORDINATION OF WORK

A. The contract drawings show the general arrangement and design intent of equipment, ductwork, piping and appurtenances. Follow the design drawings as closely as the actual construction and the work of other trades will permit. Provide offsets, fittings, and accessories which may be required but not shown on the drawings. Investigate the site, structural and finish ground conditions affecting the work, and arrange the work accordingly. Provide such work and accessories as may be required to meet such conditions, at no additional cost to the project.

B. Certain materials will be provided by other trades. Examine the Contract Documents to ascertain these requirements.

LBJ FEDERAL BUILDING

CONSOLIDATION DoED

FIRE PROTECTION GENERAL

CONDITIONS

210002 - 14 04/23/2021

C. In the preparation of the Design Drawings, a reasonable effort was made to accommodate manufacturers’ space requirements. However, since space requirements and equipment arrangement vary according to each manufacturer, the responsibility for initial access, maintenance access, code required access, and proper fit rests with the Contractor. This review shall be performed by this Contractor prior to submitting any equipment shop drawings and prior to proceeding with any work.

D. Wherever work interconnects with work of other trades, coordinate with other trades.

Insure that they have the information necessary so that they may properly install the necessary connections and equipment. Identify items (valves, dampers, coils, cleanouts, etc.) requiring access in order that the Ceiling Trade will know where to install access doors and panels.

E. Consult with other trades regarding equipment so that, wherever possible, motors, motor controls, pumps and valves are of the same manufacture.

F. Furnish and set sleeves for passage of pipes, ducts and conduits through structural masonry and concrete walls and floors and elsewhere as will be required for the proper protection of each pipe and duct passing through building surfaces.

G. Properly provide firestopping around all pipes, conduits, ducts, sleeves, etc.