This solicitation notice is for a firm fixed-price construction contract to perform repair, alteration, and construction services for the LBJ Consolidation Construction & Switchgear project. The scope of work includes renovating approximately 198,369 square feet of existing office space into open floor plans on floors 3, 4, 6, and 7 of the LBJ building along with bathroom renovations. Additional work involves upgrading HVAC, electrical, fire alarm, and sprinkler systems to comply with codes. Significant renovations are required for the major switchgear and electrical systems serving the building. The solicitation is open to all responsible firms, has a small business size standard of $39.5 million, and will follow FAR Part 15 procedures. A virtual pre-proposal conference will be held on May 5, 2021, with the solicitation closing on June 4, 2021. All information and amendments will be posted to SAM.gov. The selected contractor will perform the work for the General Services Administration and Department of Education to consolidate approximately 600 employees into the LBJ building.
View the file
Other files for this federal contract opportunity
Show all 50
Solicitation Notice - LBJ Consolidation & Switchgear has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 1' 2' 1 1/2"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:2
P
M
G-00-01
COVER SHEET
VW+KS
AC + SP
DEPARTMENT OF EDUCATION CONSOLIDATION PROJECT
LYNDON B JOHNSON FEDERAL BUILDING
RENOVATION OF LEVEL 5 AND LEVEL 2- RESTROOMS
400 MARYLAND AVE, SW
WASHINGTON D.C., 20024
APPLICABLE CODES
GSA FACILITIES STANDARDS FOR THE PUBLIC BUILDINGS SERVICE P100 (2018)
OSHA REGULATIONS FOR CONSTRUCTION
INTERNATIONAL BUILDING CODE (2018)
ENVIRONMENTAL PROTECTION AGENCY REGULATIONS
INTERNATIONAL ENERGY CONSERVATION CODE (2018)
INTERNATIONAL EXISTING BUILDING CODE (2018)
THE ARCHITECTURAL BARRIERS ACT STANDARDS
INTERNATIONAL MECHANICAL CODE (2018)
INTERNATIONAL FIRE CODE (2018)
INTERNATIONAL PLUMBING CODE (2018)
NFPA 70 (2017) NATIONAL ELECTRIC CODE
NFPA 101 (2018) LIFE SAFETY CODE
NFPA 13 (2019) SPRINKLER SYSTEMS
NFPA 72 (2017) NATIONAL FIRE ALARM AND SIGNALING CODE
SUMMARY OF REQUIREMENTS
TYPE OF CONSTRUCTION (PER IBC 2018 TABLE 503): I B (1 B)
USE GROUP (PER NFPA 101): BUSINESS
HEIGHT OF BUILDING LIMITATION (PER IBC 2018 TABLE 504.4): 12 STORIES
AREA LIMITATION (PER IBC 2018 TABLE 506.2): PER STORY: UNLIMITED
NUMBER OF FLOORS IN BUILDING: 7
TENANT FLOORS SCOPE OF WORK: 2,5
GROSS TENANT FLOOR AREA (SCOPE OF WORK): 2 (1,720 SF) 5 (1,720 SF )
TOTAL: 3,440 SF
FULLY AUTOMATIC FIRE SUPPRESSION SYSTEM (NFPA 13): YES
HIGH-RISE OR WITHIN A HIGH-RISE: YES
FIRE ALARM SYSTEM IN THE BUILDING: YES
SCOPE OF TENANT WORK: INTERIOR RENOVATION
RENOVATION AFFECTED AREA: 3,440 SF
THE SCOPE OF WORK INCLUDES THE RENOVATION AND REPAIR OF PUBLIC
RESTROOMS AT LEVELS 2 AND LEVEL 5, OF THE EXISTING LYNDON BAINES
JOHNSON (LBJ) FEDERAL BUILDING LOCATED AT 400 MARYLAND AVENUE, SW,
WASHINGTON, DC. THE LBJ BUILDING IS LISTED ELIGIBLE FOR THE NATIONAL
REGISTER OF HISTORIC PLACES AND CURRENTLY SERVES AS THE
HEADQUARTERS BUILDING OF THE U.S. DEPARTMENT OF EDUCATION (DOED).
THE BUILDING IS TO BE RECONSTRUCTED AS OPEN OFFICE SPACE WITH
SUFFICIENT WORKSPACE AND MEETING SPACE TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
ADDITIONAL SCOPE INCLUDES UPGRADES TO TENANT ALTERATIONS, THE HVAC,
NEW POWER DISTRIBUTION CIRCUITS, POWER DISTRIBUTION BREAKER TIE
UPGRADES, OPEN MOBILE WORKSPACE CONSTRUCTION, AND A NEW
SWITCHGEAR. THE PROPOSED PROJECT INCLUDES LIFE SAFETY ITEMS SUCH
AS NEW FLOOR FIRE ALARM AUDIO VISUAL APPLIANCES, SMOKE AND DUCT
DETECTORS, PULL STATIONS, BOOSTER AND AMPLIFIER PANELS, AND OTHER
NEEDED EQUIPMENT FOR A COMPLETE FLOOR FIRE ALARM REPLACEMENT IN
ORDER TO COMPLY WITH CURRENT APPLICABLE CODES. THE FLOOR
SPRINKLER SYSTEM WILL ALSO BE REPLACED TO ACCOMMODATE THE NEW
FLOOR PLAN.
L'ENFANT PLAZA
STATION
FEDERAL CENTER
SW STATION
L'ENFANT STATION
400 MARYLAND AVE, SW WASHINGTON D.C., 20024
PROJECT ADDRESS:
N
TEAM
CLIENT'S REP:
DEPARTMENT OF EDUCATION
HALLIE FUTTERMAN hallie.futterman@gsa.gov CHRISTINA WEAVER christina.weaver@gsa.gov NGOC CHAU ngoc.chau@gas.gov JANEY SAUNDERS janey.saunders@ed.gov PATTY COLE patty.cole@ed.gov
PROJECT TEAM:
KRUECK SEXTON PARTNERS (ARCHITECT)
SCOTT PRATT spratt@ks.partners ART CANTWELL acantwell@ks.partners RYAN TREACY rtreacy@ks.partners VERONICA WIDHOLM vwidholm@ks.partners SANGHYO KIM skim@ks.partners
WSP (MEP ENGINEER)
PHILIP BRYCHTA philip.brychta@wsp.com RAFAEL.O.OCASIO rafael.o.ocasio@wsp.com PATRICIA MACCAFFERY patricia.maccaffery@wsp.com JARED MACCOIG jared.mccoig@wsp.com LAUREN BERCARICH lauren.bercarich@wsp.com MARIYA MELESHKO mariya.meleshko@wsp.com NICHOLAS MUGLIA nick.muglia@wsp.com FRANK TUPPER frank.tupper@wsp.com
THRESHOLD ACCOUSTICS (ACCOUSTIC CONSULTANT)
LAURIE KAMPER lkamper@thresholdacoustics.com JASON KARTAK jkartak@thresholdacoustics.com SAMANTHA WELLER sweller@thresholdacoustics.com SCOTT PFEIFFER spfeiffer@thresholdacoustics.com
ATELIER TEN (SUSTAINABILITY CONSULTANT)
REBECCA RISS rebecca.riss@atelierten.com LARRY JONES larry.jones@atelierten.com
0 1' 2' 1 1/2"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:2
P
M
G-00-02
APPLICABLE CODES & DRAWING INDEX
RT + SK
AC + SP
12" = 1'-0"2
APPLICABLE CODES
12" = 1'-0"3
SCOPE OF WORK STATEMENT
1" = 400'-0"4
VICINITY MAP
DRAWING INDEX
Sheet Number Sheet Name 0
/2 /2
I S
S U
E F
O R
B
ID
D
IN
G
G-00-01 COVER SHEET ■
G-00-02 APPLICABLE CODES & DRAWING INDEX ■
G-00-03 GENERAL NOTES, SYMBOLS, & ABBREVIATIONS ■
G-00-04 ACCESSIBILTY ■
G-00-05 MATERIAL SCHEDULE ■
G-00-06 MOUNTING HEIGHT AND LIGHTING SCHEDULE ■
AD-00 DEMOLITION PLAN & DEMO RCP - LEVEL 5 AND 2 ■
A-40-01 FLOOR PLAN AND ACCESSORIES ■
A-40-02 FINISHES AND RCP ■
A-40-03 ELEVATIONS - RESTROOMS ■
A-50-01 PARTITIONS, CEILING AND MILLWORK DETAILS ■
A-62-03 DOOR TYPES & DETAILS ■
M-00-50 MECHANICAL COVER SHEET ■
MD-15-01 MECHANICAL DEMOLITION PLAN - LEVEL 2 & LEVEL 5 ■
M-00-51 MECHANICAL SCHEDULES, DETAIL AND CONTROLS ■
M-15-00 MECHANICAL PLAN - LEVEL 2 & LEVEL 5 - OVERALL ■
M-15-01 MECHANICAL PLAN - LEVEL 2 & LEVEL 5 - EAST & WEST ■
E-00-03 ELECTRICAL LEGENDS, SYMBOLS & ABBREVIATIONS ■
EL-15-00 ELECTRICAL LIGHTING PLAN PLANS LEVEL 2 & LEVEL 5 - OVERALL ■
EL-15-01 ELECTRICAL LIGHTING PLAN - ENLARGED PLANS LEVEL 2 & LEVEL 5 ■
EP-15-00 ELECTRICAL POWER PLAN PLANS LEVEL 2 & LEVEL 5 - OVERALL ■
EP-15-01 ELECTRICAL POWER PLAN - ENLARGED PLANS LEVEL 2 & LEVEL 5 ■
FA-00-02 FIRE ALARM LEGENDS, SYSMBOLD & ABBREVIATIONS ■
FA-15-00 FIRE ALARM PLAN - LEVEL 2 & LEVEL 5 - OVERALL ■
FA-15-01 FIRE ALARM ENLARGED PLANS - LEVEL 2 & LEVEL 5 ■
P-00-01 COVER, NOTES, SYMBOLD AND ABBREVIATIONS ■
PD-12-01 PLUMBING DEMO, FLOOR PLAN - LEVEL -2 - EAST & WEST ■
PD-15-01 PLUMBING DEMO, FLOOR PLAN LEVEL - 5 - EAST & WEST ■
P-12-00 PLUMBING FLOOR PLAN - LEVEL 2 - OVERALL ■
P-12-01 PLUMBING FLOOR PLAN - LEVEL 2 - EAST & WEST ■
P-15-00 PLUMBING FLOOR PLAN - LEVEL 5 - OVERALL ■
P-15-01 PLUMBING FLOOR PLAN - LEVEL 5 - EAST & WEST ■
P-70-01 PLUMBING DETAILS ■
FP-00-01 FIRE PROTECTION NOTES, SYMBOLS AND ABBREVIATIONS ■
FPD-12-01 FIRE PROTECTION DEMO PLAN - LEVEL 2 - EAST & WEST ■
FPD-15-01 FIRE PROTECTION DEMO PLAN - LEVEL 5 - EAST & WEST ■
FP-12-01 FIRE PROTECTION PLAN - LEVEL 2 - EAST & WEST ■
FP-15-01 FIRE PROTECTION PLAN - LEVEL 5 - EAST & WEST ■
FP-70-01 FIRE PROTECTION DETAILS ■
GENERAL CONSTRUCTION NOTES
1. REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR:
CONTRACT DOCUMENTS INCLUDE ARCHITECTURAL, MECHANICAL, ELECTRICAL,
FIRE PROTECTION, AND FIRE ALARM, AND ARE TO BE USED TOGETHER,
COORDINATED BETWEEN DISCIPLINES. ALL SPECIFICATIONS AND CONTRACTS,
C.O.S. AND ADDENDA SHALL BE CONSIDERED CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT
DOCUMENTS WITH EACH OTHER AND WITH AS-BUILT CONDITIONS AND SHALL
IMMEDIATELY REPORT TO THE ARCHITECT ALL ERRORS, INCONSISTENCIES, OR
OMISSIONS. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND
VERIFY FIELD CONDITIONS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
AND HAS CONTROL OVER CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES, AND PROCEDURES, AND FOR COORDINATING ALL PORTIONS OF
THE WORK.
2. CONTRACT DOCUMENTS: ALL CONTRACT DOCUMENTS ARE COMPLEMENTARY
AND WHAT IS CALLED FOR BY ANY WILL BE AS BINDING AS IF CALLED FOR BY
ALL. ALL WORK SHOWN OR REFERRED TO ON ANY CONTRACT DOCUMENT
SHALL BE PROVIDED AS THOUGH THEY ARE ON ALL RELATED DOCUMENTS.
ANY CONFLICT BETWEEN DOCUMENTS IS TO BE DIRECTED TO THE ARCHITECT
FOR CLARIFICATION.
3. APPLICABLE CODE COMPLIANCE: EXECUTE WORK IN ACCORDANCE WITH ANY
AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES, MANUFACTURER'S
RECOMMENDATIONS, AND TRADE AND REFERENCE STANDARDS, INCLUDING
BUT NOT LIMITED TO: IBC, SEISMIC CODES, NEC, NFPA, ASME AND GSA P-100
(LATEST ENFORCED EDITIONS)
4. FIREPROOFING: PATCH AND REPAIR ALL FIREPROOFING/FIRESAFING DAMAGE
INCURRED DURING DEMOLITION AND/OR CONSTRUCTION. FIREPROOF AS
REQUIRED BY CODE ALL NEW PENETRATIONS GENERATED BY THE WORK
DESCRIBED IN THESE DOCUMENTS.
5. INTENT OF CONTRACT DOCUMENTS: THE INTENT OF THE CONTRACT
DOCUMENTS IS TO ALLOW FOR THE PERFORMANCE OF THE WORK. EVERY
ITEM NECESSARILY REQUIRED MAY NOT BE SPECIFICALLY MENTIONED OR
SHOWN. UNLESS EXPRESSLY STATED, ALL SYSTEMS AND EQUIPMENT SHALL
BE COMPLETED AND APPROPRIATELY OPERABLE. FURNISH AND INSTALL ALL
SPECIFIED AND APPROPRIATE ITEMS, AND ALL INCIDENTAL, ACCESSORY, AND
OTHER ITEMS NOT SPECIFIED BUT REQUIRED FOR A COMPLETE AND FINISHED
ASSEMBLY.
6. GENERAL-CONTRACTOR RESPONSIBILITY TO NOTIFY THE ARCHITECT: IT SHALL
BE THE RESPONSIBILITY OF THE ALL SUB-CONTRACTORS TO NOTIFY THE
CONTRACTOR AND THE ARCHITECT OF ANY CONFLICTS HEREIN - EITHER
APPARENT, QUESTIONABLE OR OBVIOUS - PRIOR TO THE START OF NEW WORK
ON THAT ITEM, OR BEAR THE RESPONSIBILITY OF CORRECTING SUCH WORK AS
DIRECTED BY THE ARCHITECT.
7. CHANGES IN SCOPE: DO NOT PROCEED WITH ANY WORK REQUIRING
ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT WITHOUT
WRITTEN AUTHORIZATION FROM THE GOVERNMENT CONTRACTING OFFICER.
8. EXISTING DoED OCCUPANTS: COORDINATE ALL WORK WITH GOVERNMENT SO AS TO MINIMIZE DISTURBANCE AND CAUSE NO DAMAGE TO ANY DoED
OCCUPANTS IN THE BUILDING. AVOID CONFLICT AND INTERFERENCE WITH
NORMAL BUILDING OPERATIONS BY COMPLYING WITH THE BUILDING'S
REGULATIONS REGARDING SCHEDULING AND USE OF ELEVATORS AND
LOADING DOCKS FOR DELIVERIES, HANDLING OF MATERIALS, EQUIPMENTS,
AND DEBRIS.
9. ADJACENT SPACES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR
SCHEDULING OF ACCESS INTO ADJACENT SPACES WITH THE GOVERNMENT AS
REQUIRED FOR PRICING AND EXECUTION OF THE WORK.
10. DUPLICATION OF DOCUMENTS: ALL DRAWINGS AND WRITTEN MATERIAL
HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE
GOVERNMENT AND THE SAME MAY NOT BE DUPLICATED, USED, OR DISCLOSED
WITHOUT THE WRITTEN CONSENT OF THE GOVERNMENT FOR PURPOSES
OTHER THAN THIS PROJECT.
11. CLARIFICATIONS: CLARIFY ALL DISCREPANCIES RELATIVE TO CONSTRUCTION
DOCUMENTS, SPECIFICATIONS, AND FIELD CONDITIONS PRIOR TO SUBMITTING
BIDS AND COMMENCING WORK.
12. SHOP DRAWINGS AND SUBMITTALS: REFER TO SPECIFICATIONS SECTION
013300 SUBMITTAL PROCEDURES.
13. COORDINATION OF THE WORK: THE CONTRACTOR IS RESPONSIBLE FOR
REVIEW AND VERIFICATION OF CONTRACT DOCUMENTS, FIELD CONDITIONS,
AND DIMENSIONS FOR ACCURACY AND CONFIRMING THAT WORK IS BUILDABLE
AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY
QUESTIONS REGARDING THESE OR OTHER COORDINATION ISSUES, THE
CONTRACTOR SHALL SUBMIT THEM IN WRITING TO THE CONTRACTING OFFICER
AND THE ARCHITECT AND IS RESPONSIBLE FOR OBTAINING A WRITTEN
CLARIFICATION FROM THE CONTRACTING OFFICER BEFORE PROCEEDING WITH
WORK IN QUESTION, OR RELATED WORK.
14. COORDINATION OF UTILITIES: VERIFY IN THE FIELD THAT NO CONFLICTS EXIST
WHICH WOULD PROHIBIT THE LOCATION OF ANY AND ALL MECHANICAL,
TELEPHONE, ELECTRICAL, LIGHTING, PLUMBING, AND SPRINKLER EQUIPMENT
(TO INCLUDE ALL REQUIRED PIPING, DUCTWORK, AND CONDUIT), AND THAT ALL
REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE OF ABOVE
EQUIPMENT ARE PROVIDED.
15. CLEANING: PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST
AND DEBRIS FROM MIGRATING FROM CONSTRUCTION AREA. THIS INCLUDES
PUBLIC AREAS AND PUBLIC RESTROOMS USED BY THE CONTRACTOR AND SUB-
CONTRACTORS.
16. PROTECTION OF EXISTING WORK: PROVIDE PROTECTION TO ALL EXISTING
FINISHES IN ALL SPACES WITHIN OR ADJACENT TO THE SCOPE OF WORK AND
THE DoED'S SPACE. THE CONTRACTOR SHALL PATCH, REFINISH, AND REPAIR
ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUB-CONTRACTORS.
MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN TO THE
SATISFACTION OF THE GOVERNMENT.
17. DEFECTIVE WORK: NO WORK DEFECTIVE IN WORKMANSHIP OR QUALITY IN ANY
REQUIREMENTS OF THE CONTRACT DOCUMENTS WILL BE ACCEPTABLE
DESPITE FAILURE TO DISCOVER OR POINT OUT DEFECTS OR DEFICIENCIES
DURING CONSTRUCTION. DEFECTIVE WORK REVEALED WITHIN THE TIME
REQUIRED BY GUARANTEES SHALL BE REPLACED BY WORK CONFORMING TO
THE INTENT OF THE CONTRACT. NO PAYMENT, EITHER PARTIAL OR FINAL,
SHALL BE CONSTRUED AS AN ACCEPTANCE OF DEFECTIVE WORK OR
IMPROPER MATERIALS.
18. UNENFORCEABLE WORK: SHOULD ANY PORTION OF THE CONTRACT
DOCUMENTS PROVE TO BE, FOR WHATEVER REASON, UNENFORCEABLE, SUCH
DOCUMENTS SHALL NOT EXTEND TO THE REMAINDER OF THE CONTRACT NOR
SHALL IT VOID ANY OTHER PROVISIONS OF THE CONTRACT.
19. DIMENSIONS: DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN OVER
PLANS AND ELEVATIONS. LARGE SCALE DETAILS SHALL GOVERN OVER SMALL
SCALE DETAILS. WRITTEN SPECIFICATIONS SHALL GOVERN OVER ALL.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS.
20. MATERIALS: ALL MATERIALS SHALL BE NEW, UNUSED, AND MEETING ALL
SPECIFICATIONS AND INDUSTRY STANDARDS. MANUFACTURED MATERIALS
AND EQUIPMENT SHALL BE INSTALLED AS PER THE MANUFACTURER'S
RECOMMENDATIONS AND INSTRUCTIONS.
21. PUNCH LIST: UPON COMPLETION OF THE WORK BY THE CONTRACTOR, THE
CONTRACTOR SHALL NOTIFY THE ARCHITECT AND THE GOVERNMENT IN
WRITING OF SUCH COMPLETION. THE ARCHITECT SHALL ATTEND THE PUNCH
LIST WALK THROUGH CONDUCTED BY THE CONTRACTOR. THE CONTRACTOR
SHALL PREPARE AND DISTRIBUTE A LIST OF ITEMS TO BE FINISHED OR
COMPLETED PRIOR TO THIS WALKTHROUGH. THE CONTRACTOR SHALL TAKE
NOTES AND PREPARE A LIST OF FINAL PUNCH LIST ITEMS TO BE COMPLETED
OR CORRECTED AS A RESULT OF THE WALKTHROUGH. THIS PUNCH LIST IS TO
BE PROMPTLY DISTRIBUTED BY THE THE CONTRACTOR TO THE DoED, GOVERNMENT, AND THE ARCHITECT.
22. FINAL AS BUILT DRAWINGS: DURING THE COURSE OF CONSTRUCTION, ACTUAL
LOCATIONS OF CONSTRUCTION ITEMS DENOTED IN THE CONSTRUCTION
DOCUMENTS SHALL BE INDICATED TO SCALE IN CONTRASTING INK ON THE
DRAWINGS FOR ALL RUNS OF MECHANICAL, SPRINKLER, PLUMBING, AND
ELECTRICAL WORK; INCLUDING UTILITIES AND CONCEALED DEVIATIONS FROM
THE DRAWINGS. UPON COMPLETION OF THE PROJECT, THE ARCHITECT WILL
PROVIDE THE CONTRACTOR WITH A COPY OF THE BIM MODEL DOCUMENTS
FOR "AS-BUILT" DOCUMENTATION. THIS SET SHALL BE CONSPICUOUSLY
MARKED "AS-BUILTS" AND DELIVERED TO THE ARCHITECT.
23. ALL NEW WORK SHALL ALIGN WITH AND MATCH EXISTING SIMILAR WORK
EXCEPT WHERE NOTED OTHERWISE. WHERE EXISTING NON-STRUCTURAL
WORK IS CUT OR MODIFIED FOR THE PURPOSES OF THIS PROJECT, THE
CONTRACTOR SHALL PATCH TO MATCH EXISTING, UNDISTURBED WORK OF
SIMILAR TYPE.
24. ALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED.
25. PROVIDE FOR THE SEPARATION OF MATERIALS AT POINT OF CONTACT FROM
INCOMPATIBLE SUBSTRATES WITH PERMANENT NEUTRAL MATERIAL.
26. PROVIDE ARCHITECTURAL JOINT SEALANT TO SEAL ALL INTERIOR VOIDS,
EXPOSED JOINTS AND JUNCTURES BETWEEN MATERIALS.
27. THE FIRE RESISTIVE INTEGRITY OF THE ORIGINAL BUILDING IS NOT TO BE
COMPROMISED BY ANY ACTION OF THE CONTRACTOR. ALL PENETRATIONS TO
BE FIRE STOPPED.
28. ALL BLOCKING TO BE FIRE RATED WOOD.
29. INTERRUPTION OF UTILITY SERVICES:
A. EXISTING SERVICES: PRIOR TO THE START OF WORK, THE CONTRACTOR
SHALL OBTAIN THE PERMISSION OF THE CONTRACTING OFFICER AND
GSA BUILDING MANAGEMENT FOR THE INTERRUPTION OF EXISTING
SERVICES, FOR CONNECTION TO THE SAME AND SHALL COORDINATE THE
TIME OF WORK IN ACCORDANCE WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE'S INSTRUCTIONS.
B. ELECTRICAL POWER INTERRUPTION: SHUTDOWN OF ANY SYSTEM SHALL
BE SCHEDULED AT LEAST 14 CALENDAR DAYS IN ADVANCE, WITH
ADVANCE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND GSA
BUILDING MANAGEMENT.
C. FIRE ALARM, SPRINKLER AND STANDPIPE SYSTEM INTERRUPTION:
SHUTDOWN OF EXISTING FIRE ALARM, SPRINKLER AND STANDPIPE
SYSTEMS SHALL BE LIMITED TO AFTER HOURS (7:00 PM - 6:00 AM) OR
WEEKENDS ONLY. SYSTEM TO BE BACK IN COMPLETE OPERATION BY
START OF THE WORKING DAY FOLLOWING THE WEEKEND OR EVENING
OF SHUTDOWN. SHUTDOWN SHALL BE SCHEDULED AT LEAST 14
CALENDAR DAYS IN ADVANCE. NOTICE SHALL BE GIVEN TO THE BUILDING
MANAGER, THE CONTRACTING OFFICER AND THE GSA FIRE ALARM SHOP,
AND REGIONAL GSA FIRE PROTECTION ENGINEER, IN WRITING.
D. HVAC AND PLUMBING: SHUTDOWN OF ANY SYSTEM SHALL BE
SCHEDULED AT LEAST 14 CALENDAR DAYS IN ADVANCE, WITH ADVANCE
WRITTEN NOTICE TO THE CONTRACTING OFFICER. THE CONTRACTOR TO
VERIFY IF TEMPORARY SERVICE FOR THE DURATION OF EACH
SHUTDOWN IS REQUIRED, AND PROVIDE SAME AS DIRECTED BY THE
OFFICER.
GENERAL DEMOLITION NOTES
1. SUMMARY: WORK NECESSARY FOR COMPLETE DEMOLITION INCLUDES
FURNISHING LABOR FOR DEMOLITION, REMOVAL OF DEBRIS, PATCHING AS
REQUIRED, CONTROL DUST, NECESSARY NOTICES AND PROTECTIONS.
2. SCHEDULE: SUBMIT SCHEDULE INDICATING PROPOSED SEQUENCE OF
OPERATIONS FOR SELECTIVE DEMOLITION WORK TO THE ARCHITECT, THE
GOVERNMENT'S REPRESENTATIVE AND BUILDING MANAGEMENT FOR REVIEW.
INCLUDE COORDINATION FOR SHUT OFF, CAPPING, AND CONTINUATION OF
UTILITY SERVICES AS REQUIRED TOGETHER WITH DETAILS FOR DUST AND
NOISE CONTROL. PROVIDE DETAILED SEQUENCE OF DEMOLITION, AND
REMOVAL WORK TO ENSURE UNINTERRUPTED PROGRESS OF GOVERNMENT'S
ON-SITE OPERATIONS AND BUILDING OPERATIONS.
3. TRAFFIC: CONDUCT SELECTIVE DEMOLITION OPERATIONS AND DEBRIS
REMOVAL IN A MANNER TO ENSURE MINIMUM INTERFERENCE WITH ROADS,
STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES.
PROVIDE 48 HOURS OF NOTICE TO GOVERNMENT FOR ANY INTERFERENCE
WITH OCCUPANTS.
4. CONDITION OF STRUCTURES: IF ASBESTOS OR OTHER HAZARDOUS
MATERIALS ARE DISCOVERED DURING CONSTRUCTION, THE CONTRACTOR
SHALL NOTIFY THE GOVERNMENT IMMEDIATELY IN WRITING. THE
CONTRACTOR SHALL STOP ALL WORK AND SHALL NOT PROCEED WITH
SCHEDULED WORK WITHOUT DIRECTION FROM THE GOVERNMENT.
5. FIRE AND LIFE SAFETY SYSTEM: NO EXISTING SMOKE DETECTOR, PUBLIC
ADDRESS SPEAKER, FIRE ALARM BOX, OR SIMILAR DEVICE, INCLUDING THE
ASSOCIATED WIRING, SHALL BE DAMAGED DURING DEMOLITION AND
SUBSEQUENT CONSTRUCTION. RELOCATION OF SMOKE DETECTORS, PUBLIC
ADDRESS SPEAKERS, AND FIRE ALARM EQUIPMENT, NECESSITATED BY NEW
CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER
THE PLANS. NO ACTIVE SMOKE DETECTOR SHALL BE COVERED OR
OTHERWISE REMOVED OR USED FOR OTHER THAN ITS INTENDED PURPOSE.
6. STAIRWAYS: STAIRWAYS MUST REMAIN ACCESSIBLE AT ALL TIMES DURING
DEMOLITION.
7. UTILITY SERVICES: MAINTAIN EXISTING UTILITIES TO REMAIN, KEEP IN
SERVICE, IDENTIFY, AND PROTECT AGAINST DAMAGE DURING DEMOLITION
OPERATIONS. PROVIDE TEMPORARY LIGHT AND POWER AS REQUIRED.
A. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT
PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE
VERIFIED WITH TELEPHONE COMPANIES SERVICE GOVERNMENT OR
TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO
PREVENT NEW CONSTRUCTION DELAYS. REMOVE TO SOURCE ALL
PIPES, VENTS, APPLIANCES, OR DRAINS NOT BEING RE-USED.
8. ENVIRONMENTAL CONTROLS: USE TEMPORARY ENCLOSURES AND OTHER
SUITABLE METHODS TO ISOLATE DUST AND DIRT RISING AND SCATTERING.
A. CAP ALL OUTLETS, SWITCHES, WIRES, THERMOSTATS, ETC. TO THEIR
SOURCE AS REQUIRED. ALL EXISTING FLOOR MOUNTED OUTLETS,
WHERE NOTED TO BE REMOVED OR RELOCATED, SHALL BE CAPPED OFF
TO THE NEAREST JUNCTION BOX. FILL AND LEVEL FLOOR TO ACCEPT
NEW FLOOR COVERING.
9. FREIGHT ELEVATOR: DEBRIS REMOVAL MUST BE PERFORMED USING THE
FREIGHT ELEVATOR. CONTACT THE BUILDING MANAGEMENT OFFICE TO
OBTAIN SCHEDULE FOR THE USE OF THE FREIGHT ELEVATOR. ALL DEBRIS
REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH BUILDING
MANAGEMENT REQUIREMENTS AND PROCEDURES.
10. INSPECTION: PRIOR TO COMMENCEMENT OF SELECTIVE DEMOLITION WORK,
INSPECT AREAS IN WHICH WORK WILL BE PERFORMED. PHOTOGRAPH
EXISTING CONDITIONS TO STRUCTURE SURFACES, EQUIPMENT, OR TO
SURROUNDING PROPERTIES WHICH COULD BE DAMAGED AS THE RESULT OF
THE DEMOLITION WORK. FILE WITH GOVERNMENT PRIOR TO STARTING WORK.
11. PROTECTIONS: PROVIDE PROTECTIVE BARRICADES, PROTECTIVE CANOPIES,
AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT
GOVERNMENT'S PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO
SELECTIVE DEMOLITION WORK.
A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND
SAFE PASSAGE OF GOVERNMENT'S PERSONNEL, TENANT, THEIR
EMPLOYEES AND THEIR INVITEES, AND GENERAL PUBLIC TO AND FROM
OCCUPIED PORTIONS OF BUILDING.
B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN
PLACE AND BECOMES EXPOSED DURING DEMOLITION OPERATIONS.
C. PROTECT FLOORS WITH SUITABLE COVERINGS IN ALL AREAS THAT ARE
NOT PART OF THE CONSTRUCTION SCOPE AND WHERE TRAFFIC WILL
OCCUR DUE TO ACCESS, MOVEMENT OF MATERIALS AND EQUIPMENT
AND THE REMOVAL OF TRASH AND DEBRIS.
D. CONSTRUCT TEMPORARY POLYETHELENE SHEETING DUST BARRIERS
WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY OR EXTENSIVE
DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH
DUST PROOF DOORS AND SECURITY LOCKS IF REQUIRED.
E. PROVIDE TEMPORARY WEATHER PROTECTION DURING INTERVAL
BETWEEN DEMOLITION AND REMOVAL OF EXISTING CONSTRUCTION ON
EXTERIOR SURFACES AND INSTALLATION OF NEW CONSTRUCTION TO
ENSURE THAT NO WATER LEAKAGE OR DAMAGE OCCURS TO
STRUCTURE OR INTERIOR AREAS OF EXISTING BUILDING. REMOVE
PROTECTIONS AT COMPLETION OF WORK.
12. COVER AND PROTECT: COVER AND PROTECT FURNITURE, EQUIPMENT AND
FIXTURES, AND OTHER ITEMS TO REMAIN FROM SOILING OR DAMAGE WHEN
DEMOLITION WORK IS PERFORMED IN ROOMS OR AREAS FROM WHICH SUCH
ITEMS HAVE NOT BEEN REMOVED.
13. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS WHETHER
ONSITE OR OFFSITE SHALL BE COORDINATED AND APPROVED BY
GOVERNMENT REPRESENTATIVE.
14. DEMOLITION: DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN
ON DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF
DEMOLITION REQUIRED TO COMPLETE THE WORK HEREIN. IF QUESTIONS
ARISE AS TO THE REMOVAL OF ANY MATERIAL IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS, CLARIFY THE POINT IN QUESTION WITH THE
ARCHITECT AND GOVERNMENT BEFORE PROCEEDING.
15. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY
DEMOLITION WORK AT NO ADDITIONAL COST TO GOVERNMENT. ADVISE
GOVERNMENT AND ARCHITECT OF LOCATION AND REMEDIATION OF
DAMAGES.
16. PATCHING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING
AND/OR REPAIRING ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUB-
CONTRACTORS TO EXISTING CONSTRUCTION. REFINISH TO MATCH EXISTING
ADJACENT FINISH OR AS NOTED HEREIN.
17. EXISTING ELECTRICAL: IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL
OUTLETS, SWITCHES, WIRES, THERMOSTATS, ETC. TO THEIR SOURCE AS
REQUIRED. ALL EXISTING FLOOR MOUNTED OUTLETS, WHERE NOTED TO BE
REMOVED OR RELOCATED, SHALL BE CAPPED OFF TO THE NEAREST
JUNCTION BOX. FILL AND LEVEL FLOOR TO ACCEPT NEW FLOOR COVERING.
18. PIPES, VENTS, ETC.: REMOVE TO SOURCE AND PROPERLY CAPPED AND
TERMINATED ALL PIPES, VENTS, APPLIANCES, OR DRAINS NOT BEING RE-
USED.
19. DOORS, FRAMES, AND HARDWARE: CAREFULLY REMOVE ALL DOORS, FRAMES
AND HARDWARE FOR REUSE WHERE APPLICABLE.
20. FLOORING: REMOVE ALL EXISTING IRREGULAR MATERIALS WHICH CAUSE
RISES AND DEPRESSIONS IN FLOORING SURFACE, SUCH AS FASTENERS,
OUTLET CORES COVER PLATES, RESILIENT FLOORING COVERINGS, CARPET,
CARPET PAD, ETC.
21. CLEAN UP: AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION
AREAS SHALL BE LEFT IN BROOMED AND CLEANED CONDITION. CARPETED
AREAS TO BE LEFT IN A VACUUM CLEAN CONDITION. HARD SURFACE
FLOORING SHALL BE DAMP MOPPED AT THE END OF EACH WORK DAY. ALL
DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED AT THE END OF
EACH WORK DAY.
22. DO NOT CUT, ALTER OR DETACH ANY STRUCTURAL MEMBERS UNLESS
OTHERWISE NOTED.
& AND
∠ ANGLE
@ AT
⌀ DIAMETER OR ROUND
# POUND OR NUMBER
ACOUS ACOUSTICAL
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AGR AGGREGATE
AL ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
ACT ACOUSTICAL TILE CEILING
B/ BOTTOM OF
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BLK BLOCK
BM BEAM
BR BRICK
CAB CABINET
CBN CATCH BASIN
CEM CEMENT
CER CERAMIC
CG CORNER GUARD
CI CAST IRON
CJ CONTROL JOINT
CLG CEILING
℄ CENTER LINE
CL CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLMN
CONC CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPETING
CT CERAMIC TILE
CTR CENTER
CTRL CONTROL
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DN DOWN
DO DOOR OPENING
DR DOOR
DS DOWNSPOUT
DWG DRQWING
E EAST
EA EACH
EIFS EXTERIOR INSULATION
& FINISH SYSTEMS
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
ENCL ENCLOSURE
E.P. ELECTRICAL PANEL
EP EPOXY PAINT
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXT'G EXISTING
EXP EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FD FIRE DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FFE FINISH FLOOR ELEVATION
F.F. FACTORY FINISH
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FOC FACE OF CONCRETE
FLUOR FLUORESCENT
FOF FACE OF FINISH
FOS FACE OF STUD
FRP FIBERGLASS
REINFORCED
POLYESTER
FT FOOT OR FEET
FSR FLAME SPREAD RATING
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GL GLASS
GND GROUND
GR GRADE
GYP GYPSUM
HB HOSE BIB
HC HANDICAPPED
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JC JANITOR CLOSET
JT JOINT
KD KNOCK DOWN
KO KNOCKOUT
KW KILOWATT
KWH KILOWATT HOUR
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LL LIVE LOAD
LP LOW POINT
LT LIGHT
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
P.B. PARTICLE BOARD
P.C. PRECAST
P.L. PROPERTY LINE
PL PLATE
PLAS PLASTER
PLWD PLYWOOD
PLUM PLUMBING
PR PAIR
PT PAINT
QT QUARRY TILE
QTY QUANTITY
R RISER OR RADIUS
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVERSE
RM ROOM
RO ROUGH OPENING
S SOUTH
SCHED SCHEDULE
SCWD SOLID CORE WOOD
SECT SECTION
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STD STANDARD
STL STEEL
STR STRIPING
SUSP SUSPENDED
SYM SYMMETRICAL
T TREAD
T/ TOP OF
T&G TONGUE AND GROOVE
TB TACK BOARD
THK THICK
THSH THRESHOLD
T.S. TUBE STEEL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VAR VARNISH
VCB VINYL COVE BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
V.I.F VERIFY IN FIELD
VOL VOLUME
VWC VINYL WALL COVERING
W WEST
WC WATER CLOSET
WD WOOD
WM WIRE MESH
WP WATERPROOF
WPT WORKING POINT
WR WEIGHT
W/ WITH
W/O WITHOUT
YD YARD
YR YEAR
A2.45
E9
042000.A00
A1
A3.00
A1
A3.00
A1
A3.00
A1
A3.00
A1 A3.00
120-2
[8'-0"]
ELEVATION TAG
IS DRAWN
ELEVATION IDENTIFICATION
SHEET WHERE ELEVATION
DETAIL IDENTIFICATION
SHEET WHERE DETAIL
IS DRAWN
DETAIL SECTION TAG
SECTION IDENTIFICATION
SHEET WHERE SECTION
IS DRAWN
BUILDING SECTION TAG
KITCHEN
IS DRAWN
WALL SECTION TAG
SHEET WHERE SECTION
SECTION IDENTIFICATION
WINDOW NUMBER
WINDOW TAG
W1
ROOM NAME
ROOM NUMBER
WALL TYPE TAG
ROOM IDENTIFICATION TAG
STOREFRONT TAG
P3
SF1
K5
K9
K13
N
SEE SHT.
SEE SHT.
NORTH ARROW
SHEET NOTE NUMBER
SHEET NOTE TAG
REVISION NUMBER
REVISION TAG
CLOUD AROUND REVISION
A16
CONSIDERED)
LOUVER NUMBER
LOUVER TAG
EQUIPMENT GROUP
EQUIPMENT TYPE
EQUIPMENT TAG
MATCH LINE
(SHADED PORTION IS SIDE
L1
G
1 DETAIL
1-1/2"=1'-0"
IS DRAWN
DRAWING SCALE
ELEVATION(S) TAG
DOOR NUMBER
DOOR TAG
SHEET WHERE ELEVATION
ELEVATION IDENTIFICATION
AREA DETAIL REFERENCES
IS DRAWN
DETAIL TITLE
DETAIL NUMBER
WOOD (ROUGH)
WOOD (FINISH)
WOOD (BLOCKING)
STONE (CAST)
STEEL
GRAVEL OR CRUSHED STONE
INSULATION - RIGID
PLYWOOD
INSULATION - BATT
GYPSUM BOARD
TO BE REMOVED
GROUT
EXISTING CONSTRUCTION
EARTH (ORIGINAL)
DETAIL IDENTIFICATION
SHEET WHERE DETAIL
DETAIL TAG
DATUM TARGET
COLUMN LINE TAG
CEILING TAG
COLUMN NUMBER/LETTER
CONCRETE MASONRY UNIT
BRICK (GLAZED)
CONCRETE
BRICK
ALUMINUM
IS DRAWN
SHEET WHERE SECTION
SECTION IDENTIFICATION
A1
A6.00
REFERENCE NOTE TAG
REFERENCE NOTE NUMBER
WINDOW DETAIL TAG
DETAIL IDENTIFICATION
IS DRAWN
SHEET WHERE DETAIL
A3.1.0
0 1' 2'
1 1/2"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:2
P
M
G-00-03
GENERAL NOTES, SYMBOLS, & ABBREVIATIONS
RT + SK
AC + SP
12" = 1'-0"1
ABBREVIATIONS
12" = 1'-0"2
ARCHITECTURAL SYMBOLS
3' - 6" MIN X < 48" 3' - 6" MIN
M
IN
3' - 0" MIN X < 48" 3' - 0" MIN
M
IN
CLEAR WIDTH AT TURN
2010 FEDERAL: FIGURE 403.5.2
MAX
2' - 0"
MIN
4' - 0"
MAX
2' - 0"
M
IN
M
IN
CLEAR WIDTH OF AN ACCESSIBLE ROUTE
2010 FEDERAL: FIGURE 403.5.21
3' - 0" MIN 4' - 0" MIN 3' - 0" MIN
M
IN
CLEAR WIDTH AT TURN
2010 FEDERAL: FIGURE 403.5.2
CLEAR WIDTH AT TURN
2010 FEDERAL: FIGURE 403.5.2
180 DEGREE
TURN
180 DEGREE
TURN
180 DEGREE
TURN
TOE CLEARANCE
2010 FEDERAL: FIGURE 306.2
M
IN
MAX
0' - 6"
17-25".
KNEE
CLEARANCE2010 FEDERAL: FIGURE 306.3
25" MAX
M
IN
0' - 8" MIN
MIN
0' - 11"
M
IN
M
IN
0' - 8" MIN
M
IN
COMBINED KNEE
AND TOE
CLEARANCE
MIN
0' - 11"
MIN
0' - 6"
LIMITS OF PROTRUDING OBJECTS
2010 FEDERAL: FIGURE 307.2
H
IG
H E
R T
H A
N
0' - 4" MAX
M
IN
L E
S S
T H
A N
ANY AMOUNT
OBJECTS ABOVE 80"
A.F.F. MAY PROTRUDE
BEYOND 4"
EXCEPTION:
HANDRAILS MAY
PROTRUDE 4 1/2" MAX
MAX
0' - 10"
M
IN
M A
X
M
IN
M A
X
UNOBSTRUCTED SIDE REACH
2010 FEDERAL: FIGURE 308.3.1
UNOBSTRUCTED FORWARD REACH
2010 FEDERAL: FIGURE 308.2.1
MAX
0' - 10"
M A
X
M A
X
OBSTRUCTED HIGH SIDE REACH
2010 FEDERAL: FIGURE 308.3.2
MAX
10" - 24"
M A
X
M A
X
OBSTRUCTED HIGH FORWARD REACH
2010 FEDERAL: FIGURE 308.2.2
M A
X
1' - 8" MAX
M A
X
20-25" MAX
VERTICAL CLEARANCE
2010 FEDERAL: FIGURE 307.4
M
IN
M A
X
CANE DETECTION AREA
32" MIN.
32" MIN.
A) HINGED DOOR B) SLIDING DOOR
32" MIN.
SLIDING DOOR - POCKET OR HINGE APPROACH
M
IN
1' - 10" MIN. 32" MIN. 24" MIN.
SLIDING DOOR - STOP OR LATCH APPROACH
M
IN
1' - 6"
SWINGING DOOR - FRONT APPROACH, PULL SIDE
SWINGING DOOR- FRONT APPROACH, PUSH SIDE
SWINGING DOOR- FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH CLOSER AND LATCH
1' - 0"
3' - 0"
SWINGING DOOR - HINGE APPROACH, PULL SIDE
3' - 6"
SWINGING DOOR- HINGE APPROACH, PUSH SIDE
1' - 10"
1' - 10"
SWINGING DOOR- HINGE APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH CLOSER AND LATCH
2' - 0"
2' - 0"
SWINGING DOOR- LATCH APPROACH, PULL SIDE SWINGING DOOR- LATCH APPROACH, PULL SIDE, DOOR
PROVIDED WITH CLOSER
SWINGING DOOR- LATCH APPROACH, PUSH SIDE
2' - 0"
SWINGING DOOR- LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
2' - 0"
/2
/4
/4
/2
CHANGES IN LEVEL GREATER THAN
1/4" IN HEIGHT AND NOT MORE THAN
1/2" MAXIMUM IN HEIGHT SHALL BE
BEVELED WITH A SLOPE NOT
STREEPER THAN 1:2.
/4
/2
CHANGES IN LEVEL OF 1/4"
MAXIMUN IN HEIGHT SHALL
BE PERMITTED TO BE
VERTICAL.
/4
M
A X
0 1' 2' 1 1/2"=1'-0"
KEY NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:2
P
M
G-00-04
ACCESSIBILTY
RT + SK
AC + SP
S E
N S
IT
IV
E B
U T
U N
C L
A S
S
IF
IE
D
S
B U
P
R O
P E
R T
Y O
F T
H E
U N
IT
E
D S
T A
T E
S G
O V
E R
N M
E N
T F
O R
O F
F
IC
E U
S E
O N
L Y
D o n o t re m o ve t h is n o ti ce
P ro p er ly d es tr o y o r re tu rn d o cu m en ts w h en n o lo n g er n ee d ed
1/2" = 1'-0"3
CLEAR TURNING WIDTHS
1/2" = 1'-0"2
KNEE AND TOE CLEARANCES
1/2" = 1'-0"5
LIMITS OF PROTRUDING OBJECTS
1/2" = 1'-0"1
ACCESSIBLE REACH DIAGRAMS
1/2" = 1'-0"4
VERTICAL CLEARANCE
1/2" = 1'-0"8
DOORS OPENINGS
1/2" = 1'-0"6
DOORS MANEUVERING CLEARANCES
12" = 1'-0"7
THRESHOLDS DETAILS
0 1' 2' 1 1/2"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:2
P
M
G-00-05
MATERIAL SCHEDULE
VW + SK
AC + SP
WATER
CLOSET
(BARRIER
FREE)
URINAL URINAL
(BARRIER
FREE)
LAVATORY
(BARRIER
FREE)
LAVATORY
FINISH
FLOOR
M A
X
M A
X
S P
IG
O
T H
T
M A
X
DRINKING FOUNTAIN
(BARRIER FREE)
/2
M
IN
0' - 5 1/4" MAX0' - 9" MIN
M
IN
M A
X
17"-19"
EXPOSED DRAIN PIPING ARE
TO RECEIVE AN
UNDERLAVATORY GUARD.
WATER
CLOSET
1'
1'
PAPER
TOWEL
DISPENSER
FINISH FLOOR
WASTE
RECEPTACLE
SOAP
DISPENSER
(WALL
MOUNTED)
MIRROR UNIT
B R
E F
L S
U R
F
UNDERLAVATORY
GUARD
ALL EXPOSED DRAIN PIPING ARE TO
RECEIVE AN UNDERLAVATORY GUARD
B A
R R
IE
R
F R
E E
4'
S T
A N
D A
R D
5'
HOOKS
FINISH FLOOR
STALL
(BARRIER
FREE)
3' - 0" 0' - 6"
0' - 8"
V.I.F.
1' - 6"
1 1/2"ø
STAINLESS
STEEL GRAB
BARS
CU-1
0' - 8"
CU-2 CU-3 AND SC-1
(BARRIER FREE)
CU-4 AND SC-1
(BARRIER FREE)
CU-5
0' - 8" 2"8"
M
IN
2"8" 8"
3'
M
IN
3'
2" 2"
M
IN
M
IN
3'
1'
M
IN
SC-1SC-1 CU-3 CU-3 CU-5CU-2CU-1
STALLS (COMBINATION UNITS)
MOUNTING HEIGHTS
1. NOT ALL PLUMBING FIXTURES, TOILET / BATH ACCESSORIES, AND SPECIALTY
EQUIPMENT MAY BE USED. SEE PLANS, INTERIOR ELEVATIONS, AND
SCHEDULES FOR ACCESSORIES USED.
2. PROVIDE BLOCKING, BRACKETS AND MISCELLANEOUS MATERIALS
NECESSARY FOR THE INSTALLATION OF ACCESSORIES.
3. LOCATE TOILET ACCESSORIES AS SHOWN AND MOUNT AT HEIGHTS
INDICATED.
4. GRAB BARS MUST BE CAPABLE OF RESISTING A FULL LOAD OF 400 LBS
EXERTED AT ANY POINT IN ANY DIRECTION.
5. WRAP ALL EXPOSED PIPING UNDER LAVATORIES WITH PROTECTIVE
INSULATION.
6. FIXTURE DESIGNATIONS SHOWN SHALL BE USED IN CONJUNCTION WITH
ARCHITECTURAL (A-SERIES) SHEETS ONLY. DESIGNATIONS ON M.E.P.
DOCUMENTS MAY VARY.
7. COORDINATE LOCATION OF REAR GRAB BARS WITH WATER CLOSET FLUSH
VALVES.
8. FIXTURES AND ACCESSORIES SHALL BE INSTALLED IN ACCORDANCE WITH
THE LATEST EDITIONS OF THE APPLICABLE PLUMBING CODE.
9. FIXTURES AND ACCESSORIES DESIGNATED AS "ACCESSIBLE" SHALL BE
INSTALLED IN ACCORDANCE WITH THE LATEST EDITIONS OF THE AMERICANS
WITH DISABILITIES ACT GUIDELINES (CURRENT EDITION)
10. FIXTURES AND ACCESSORIES DESIGNATED AS "ACCESSIBLE" SHALL BE
INSTALLED IN ACCORDANCE WITH THE LATEST EDITIONS OF THE
INTERNATIONAL PLUMBING CODE AND THE AMERICANS WITH DISABILITIES
ACT GUIDELINES (CURRENT EDITION)
5"
FIRE SIGNAL / ALARM
THERMOSTAT
CARD READER
DIMMER LIGHT SWITCH
AND WAVE ACTUTATOR
(ADA)
DATA / TEL. ELECT. OUTLET
SEE DOOR SCHED.
S E
E D
O O
R S
C H
E D
.7
M A
X
M
A X
E
Q E
Q
PUSH / PULL LATCH & PUSH PLATES
DEADLOCK & STRIKE
DOOR PUSH / PULL BAR
LOCKSET STRIKE
CENTER ALL EQUIPMENT VERTICALLY, TYP
SEE DOOR SCHED.
S E
E D
O O
R S
C H
E D
0 1' 2' 1 1/2"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:3
P
M
G-00-06
MOUNTING HEIGHT AND LIGHTING SCHEDULE
RT + VW + SK
AC + SP
1/4" = 1'-0"
MOUNTING HEIGHTS - PLUMBING FIXTURES
1/4" = 1'-0"
MOUNTING HEIGHTS - TOILET / BATH ACCESSORIES
1/2" = 1'-0"1
STANDARD ALIGNMENT RELATIONSHIP
D25
D26D26
D27
D27 D25 D27
D25
D25
D25
D25
D26D26
D26D26
D26D26
D24
D24
D23
D24
D24
D23
D23
D24
D24
D24
D27
D25
D25
D25
D25
D25
D26D26
D26D26
D26D26
D26D26
D25D27 D27
D24
D24
D23 D24
D23
D24
D24
D24
D23
D24
D09D09D09D09
D09D09D09D09D09
D09D09D09D09D09D09
D09D09
D03D21
D22D20
D02
D02
D02
D20D20
D20D20
D20
D20
D18
TYP
D20D20D20D20
D20D20D20
D19
TYP
D20D20D20
D18
TYP
D20D20D20D20
D20D20D20
D20D20
D03 D21
D22D22 D22
D09D09D09D09
D09D09D09D09D09
D09D09D09D09D09D09
D09D09
D03 D21
D22 D20
D20
D20D20
D18
TYP
D20D20D20D20
D20D20D20D20
D20D20D20
D19
TYP
D20D20D20
D18
TYP
D20D20D20D20
D02
D02
D02
D20D20D20
D20D20
D22D22
D03D21
NOT IN SCOPE OF WORK
EXISTING WALL, PARTITION, OR COLUMN TO REMAIN
EXISTING WALL OR PARTITION TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE DEMOLISHED
FINISH FLOOR, CEILING, WALL, OR OTHER
SURFACE TO BE DEMOLISHED
EXISTING LINEAR TROUGH LITE IN BULKHEAD TO BE DEMOLISHED
EXISTING RECESSED CEILING CONE LITE TO BE DEMOLISHED
EXISTING CEILING MOUNTED ACCESS PANEL TO BE DEMOLISHED
EXISTING CEILING GRILLES TO BE DEMOLISHED
0 1' 2' 1 1/2"=1'-0"
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT TO UNAUTHORIZED RECIPIENTS IS PROHIBITED.
Do not remove this notice. Properly destroy or return documents when no longer needed.
TRUE NORTH
PLAN NORTH
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE REVISED:
36 X 48
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
KRUECK & SEXTON ARCHITECTS, P.C.
400 MARYLAND AVENUE, SW
WASHINGTON, DC 20024
LYNDON B. JOHNSON FEDERAL BUILDING
DC0010ZZ
DC0010_A_LVL5_2_Restrooms_r2020
WSP ENGINEERING
DEPARTMENT OF EDUCATION
CONSOLIDATION PROJECT
100% Construction Documents
HALLIE FUTTERMAN
RENOVATION OF LEVEL 2 & LEVEL 5 - EXISTING
RESTROOMS TO MEET THE DEPARTMENT OF
EDUCATION’S PROGRAMMATIC REQUIREMENTS.
XX
XX
XX
KRUECK & SEXTON ARCHITECTS
221 W ERIE ST
CHICAGO, IL 60654 (312) 787-0056
ARCHITECT
WSP ENGINEERING
ONE PENNSYLVANIA PLAZA, SECOND FLOOR
NEW YORK, NY 10119 (212) 465-5000
MEP ENGINEER
ATELIER TEN
45 E 20TH ST, 4TH FLOOR
NEW YORK, NY 10003 (312) 386-1400
SUSTAINABILITY CONSULTANT
THRESHOLD ACOUSTICS
141 W JACKSON BLVD, SUITE 2080
CHICAGO, IL 60604 (312) 386-1400
ACOUSTIC CONSULTANT
L5 WEST CORE
RESTROOMS
L5 EAST CORE
RESTROOMS
M A
TC
H
LI
N
E
GENERAL NOTESLEGEND KEY NOTES
GENERAL SERVICES ADMINISTRATION
NATIONAL CAPITAL REGION
PUBLIC BUILDING SERVICE, D.C. SERVICES DIV.
7TH & D STREET, S.W.
WASHINGTON, D.C. 20407
ISSUE
NO. DATE ISSUE
ARCHITECTURAL
VARIES, SEE DRAWINGS
FOR BID04/23/20211
04/15/2021
04/15/2021
/2
/2
:4
:1
P
M
AD-00
DEMOLITION PLAN & DEMO RCP - LEVEL 5 AND 2
VW + SK
AC + SP
1/4" = 1'-0"2
LEVEL 5 AND 2 -RCP DEMO EAST CORE RESTROOMS
1/4" = 1'-0"4
LEVEL 5 AND 2 - RCP DEMO WEST CORE
-RESTROOMS
1/4" = 1'-0"1
LEVEL 5 AND 2 - DEMOS EAST CORE RESTROOMS
1/4" = 1'-0"3
LEVEL 5 AND 2 - DEMOS WEST CORE RESTROOMS
NUMBER KEYNOTE TEXT
D02 REMOVE EXISTING FLOOR FINISH TO CONCRETE SLAB.
PREPARE AREA TO RECEIVE NEW WORK. TYP.
D03 DEMOLISH EXISTING DOOR, FRAME, AND ALL ASSOCIATED
HARDWARE.
D09 REMOVE EXISTING PLUMBING FIXTURE AND ALL
ASSOCIATED HARDWARE, ACCESSORIES, AND PIPING.
D18 DEMO EXIST FLOOR MOUNTED TOILET PARTITION, TYP.
D19 DEMO URINAL PRIVACY PANEL, TYP.
D20 DEMO EXIST. WALL TILES AND EXIST. GWB. / PANEL BOARD
THROUGHOUT. EXIST. METAL STUD TO BE REUSE IF
POSSIBLE
D21 DEMO FLOOR TO DECK METAL STUD AND GYPSUM WALL
BOARD ON BOTH SIDES OF STUD, TYP.
D22 DEMO EXIST GWB ON METAL STUD ON THE INSIDE FACE,
EXIST METAL STUD TO BE REUSE IF POSSIBLE.
D23 DEMO CEILING MOUNTED ACCESS PANELS, TYP.
D24 DEMO CEILING MOUNTED MECHANICAL AIR GRILLES, TYP.
D25 DEMO EXIST GWB CEILING IN ITS ENTIRETY, TYP.
D26 DEMO EXIST LINEAR TROUGH LITE FIXTURES AND ITS
BULKHEAD, TYP.
D27 DEMO 6" DIAMETER RECESSED DOWNLIGHT, TYP.
ABA
ABA
ABA
ABA
ABA
ABA
3' -4
A
.F .F
3'-4" A.F.F.
3'-4" A.F.F.
3'-4" A.F.F.
3'-4" A.F.F.
V S
ABA
ABA
ABA
ABA
3' -4
A
.F .F
3'-4" A.F.F.
ABA
ABA
C R V S
MATCH EXISTING ADJACENT
WALL FINISH
MATCH EXISTING ADJACENT
WALL FINISH
S
M
ABA
ABA
ABA
ABA
ABA
ABA
V S
ABA
ABA
ABA
ABA
ABA
ABA
C R V S
VESTIBULE
RESTROOM (M)
RESTROOM (W)
FOCUS RM
5CFRM
VESTIBULE
8'
V .I.
F
HOLD
5' - 0" , TYP
8'
/4
V .I.
F
8'
/4
V .I.
F
/4
V .I.
F
CLEAR
12' - 0 1/2" V.I.F.
H O
LD
3'
E Q
3'
E
Q
6'
/2
V .I.
F
6'
/2
V .I.
F
HOLD
5' - 0" , TYP.
E Q
E
Q
E Q
E
Q
E Q
E
Q
H O
LD
3'
E Q
H O
LD
1'
H O
LD
1'
H O
LD
1'
E Q
E
Q
E Q
2'
0" 2'
0" E
Q
E Q
E Q
E Q
E Q
ALIGNE
Q
E
Q
E Q
E
Q
E Q
E
Q
5' -0
M
IN
5' -0
M
IN
5CFRM
5CWMN
5C2VES
3' - 6" HOLD
3' - 6" HOLD
3'
3'
3'
/2
3'
/2
3'
/2
/4
V .I.
F
3'
1'
3'
3'
3'
1'
H O
LD
3'
6'
/2
V .I.
F
6'
/2
V .I.
F
E Q
E
Q
E Q
E
Q
E Q
1'
H O
LD
3'
1'
1'
E Q
E Q
E Q
E Q
ALIGN FACE OF GYP.
BD. WITH CEILING
GRID AT CORRIDOR
A74
1'
3'
3'
E Q
1'
3'
/2
3'
/2
3'
/2
1'
E Q
5'
M
IN
E Q
E
Q
E Q
E
Q
1B
5' - 0"
7 7
7 7
E Q
E
Q
2C2VES
2CWMN
5C1VES
2C2VES
2CFRM
A110
A110
A98
9'
A117
A118
ALIGN
ALIGN
A-40-03
A-40-03
18 19
A-40-03
A-40-03
A-40-03
41 38
A-40-03
A-40-03
RESTROOM (W)
VESTIBULE
MOTHER'S ROOM
VESTIBULE
RESTROOM (M)
5' -0
M
IN
5'
/4
/4
V .I.
F
6'
V .I.
F
6'
V .I.
F
E Q
3'
E
Q
CLEAR
12' - 1 1/4" V.I.F.
8'
/4
V .I.
F
8'
/4
V .I.
F
5' -0
M
IN
8'
/4
V .I.
F
3'
1'
E Q
.3 E
Q .3
E Q
.2 E
Q .2
E Q
.1 E
Q .1
HOLD
5' - 0" , TYP
HOLD
5' - 0" , TYP.
E Q
2'
0"
2'
0"
E Q
/4
V .I.
F
H O
LD
1'
H O
LD
1'
H O
LD
1'
E Q
E Q
E Q
E Q
E Q
E Q
1'
3'
3'
3'
1'
E Q
E Q
E Q
E Q
E Q
E Q
3A
ALIGN
ALIGN
5AWMN
5A2VES
1B
5AMRM
4'
3' - 0" HOLD
3' - 0" HOLD
1'
3'
3'
1'
E Q
E
Q
E Q
E
Q
1/
2"
1'
3'
/2
3'
/2
3'
/2
1'
3"
1'-6" MIN.
3'
/4
A L
IG
N
3' - 6"
5A1VES
2A2VES
2C2VES
2AMRM
2AWMN
A98
A110
A110
5' - 0"
A117
A118
A140
A140
A .F
.F
A .F
.F
2' - 0"
MR-2
CONSTRUCTION PLAN
1. VERIFY ALL DIMENSIONS IN FIELD.
2. VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO BEGINNING WORK.
NOTIFY ARCHITECT IMMEDIATELY IF FIELD CONDITIONS DO NOT MATCH
CONDITIONS SHOWN ON DRAWINGS.
3. PROVIDE BLOCKING AT LOCATIONS OF WALL MOUNTED ELEMENTS AND
FURNITURE, TYP.
4. REFER TO PARTITION TYPES FOR THICKNESSES OF PARTITIONS.
5. WALL & PARTITION DIMENSIONS ARE SHOWN TO FINISH FACE OF MATERIAL,
TYP., UNLESS NOTED OTHERWISE.
6. FURNITURE AND EQUIPMENT SHOWN IS NOT IN CONTRACT AND IS SHOWN
FOR COORDINATION PURPOSES ONLY.
7. ALL PENETRATIONS THROUGH FULL HEIGHT WALLS ARE TO BE ACOUTICALLY
SEALED.
8. ALL NEW WALLS TO BE FINISHED AND PREPPED FOR NOTED FINISH.
9. ANY BLOCKING TO BE FIRE RETARDANT, TYP.
10. MEPFP DESIGN BUILD SUB-CONTRACTORS ARE RESPONSIBLE FOR
COORDINATING ALL PENETRATIONS AND FIRESAFING.
11. ALL DOORS AT GYP. BD. PARTITIONS TO BE LOCATED 4" FROM EDGE OF JAMB
TO CORNER, UNLESS NOTED OTHERWISE.
REFLECTED CEILING PLAN
1. SEE FLOOR PLANS FOR DIMENSIONS.
2. COORDINATE ARCHITECTURAL REFLECTED CEILING PLAN WITH MECHANICAL,
ELECTRICAL, AND FIRE PROTECTION DRAWINGS. PROVIDE COORDINATED
DRAWINGS FOR REVIEW PRIOR TO CONSTRUCTION.
3. SPRINKLER HEADS HAVE NOT BEEN SHOWN. COORDINATE SPRINLKLER HEAD
LOCATIONS WITH OTHER CEILING MOUNTED ITEMS. LOCATE SPRINKLER
HEADS AS REQUIRED BY CODE TO PROVIDE SPECIFIED COVERAGE. LOCATE
SPRINKLER HEADS WITHIN THE CENTERLINE OF TILES OR QUARTER POINTS
UNLESS OTHERWISE APPROVED.
4. CONTRACTOR SHALL LOCATE MECHANICAL ITEMS AROUND LIGHTING
LAYOUT AND IN THE APPROXIMATE LOCATION OF THE MECHANICAL
DRAWINGS.
5. DO NOT ATTACH CEILING HANGERS TO ROOF DECKS. ATTACH CEILING
HANGERS TO STRUCTURAL BEAMS AND JOISTS ONLY. ATTACH CEILING
HANGERS TO FLOOR DECKS USING SPECIFIED INSERTS ONLY.
6. SUPPORT CONDUIT, BOXES AND OTHER EQUIPMENT WITH UNISTRUT
HANGERS ATTACHED TO STRUCTURAL ELEMENTS.
7. START POINT FOR CEILING GRIDS TO BE CENTER OF ROOM UNLESS NOTED
BY A START POINT.
8. PROVIDE NON-SAG TYPE GYPSUM BOARD PANELS AT CEILING OF ALL WET
AREAS SUCH AS TOILET ROOMS, UNLESS NOTED OTHERWISE.
9. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION
REGARDING SOFFIT HEIGHTS AND LOCATIONS.
10. COORDINATE LOCATION OF EXIT SIGNS WITH CODE COMPLIANCE PLANS AND
ELECTRICAL DRAWINGS.
11. ROUTE ALL CONDUITS ON EXPOSED CEILINGS SQUARE TO BUILDING WALLS
AND GROUP TOGETHER.
12. ALL PARTITION AND SOFFIT FRAMING SHALL EXTEND TO UNDERSIDE OF
STRUCTURE, UNLESS NOTED OTHERWISE.
13. PROVIDE RADIUS FITTED CEILING TRACK ACCESSORY AT ALL BULLNOSED
WALL CORNERS.
14. ALL GWB CEILING TO BE PAINTED PT-X, UNLESS NOTED OTHERWISE.
15. LOCATE DEVICES AT CENTER LINE OF CEILING TILES, U.N.O.
16. PROVIDE POWER FOR LIT MIRRORS (REFER TO LIGHTING SCHEDULE FOR
SPECS) , AT LAVATORIES LOCATIONS
NOT IN SCOPE OF WORK
EXISTING WALL, PARTITION, OR COLUMN TO REMAIN
NEW WALL OR PARTITION
EXISTING DOOR TO BE REMAIN
NEW DOOR
WAVE ACTUATORABA
CARD READER
CR
MICROPHONE
SPEAKER
CU-2
CU-1
SC-1
CU-3
SC-1
CU-4
CU-5
CU-5
WC-1
WC-1
WC-1
WC-2
WC-2
WC-2
WC-2
WC-1
WC-1
HK-1
HK-1
GB-2
GB-2
GB-1
UR-1
UR-2
MR-2
UPT-1
MR-2
WR-2
RESTROOM (M)
VESTIBULE
RESTROOM (W)
FOCUS RM
18" MIN.
WR-2
PTD-2
UR-1
GB-2
HK-1
WC-1
WC-1
WR-1
LAV-1
VESTIBULE
A117
A118
GB-1
GB-2
TPT-1
HK-1
HK-1
A83
A83
GB-2
HK-1
HK-1
A83
A83
TPT-1
TPT-2
TYP. U.N.O.
TYP. U.N.O.
TPT-1
TYP. U.N.O.
TPT-2
TYP. U.N.O.
A140
A140
PTD-2
LAV-1
LAV-1
WR-1
FA-1
FA-1
FA-1
LAV-1
LAV-1
LAV-1
WR-1
WR-1
LAV-1
FA-1
FA-1
FA-1
FA-1
PTD-2
PTD-2
PTD-2
RESTROOM (W)
VESTIBULE MOTHER'S ROOM
VESTIBULE
RESTROOM (M)
PT-01
MR-2
WR-2
WC-1
WC-1
WC-1
CU-1
CU-2
HK-1
HK-1
WC-2
WC-2
GB-1
GB-2
GB-2
GB-2
CU-3
SC-1
UR-1
UR-1
UR-2
UPT-1
WC-2
WC-2
WC-1
WC-1
WC-1
WC-1
HK-1
CU-4
SC-1
CU-5
CU-5
MR-2
SNK-2
WR-2
PTD-2
MR-1
GB-1
GB-2
GB-2
GB-2
HK-1
HK-1
HK-1
HK-1
HK-1
HK-1
HK-1
FA-1
LAV-1
WR-1
WR-1
LAV-1
LAV-1
LAV-1
WR-1
PTD-2
PTD-2
FA-1
FA-1
FA-1
HK-1
LAV-1
FA-1
WR-1
LAV-1
FA-1
A83
A83
A83
LAV-1
FA-1
CU-5
A118
A117
TPT-1
TPT-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .