Bid Spreadsheet_Rev 1_5.24.21.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Solicitation Notice - LBJ Consolidation & Switchgear Federal contract opportunity
Solicitation number
47PM0121R0013
Issued by
General Services Administration Public Buildings Service

About this file

This document contains a bid spreadsheet and solicitation notice for construction services related to the LBJ Consolidation and Switchgear project. The bid spreadsheet details pricing for base construction services on the 4th floor as well as options for additional floors, switchgear work, bathroom renovations, and alternates. Pricing is listed by CLIN for each construction phase with line items for costs, general conditions, bonds, overhead and profit. The solicitation notice seeks proposals for repair, alteration and construction services including open office and meeting space construction as well as HVAC, electrical and life safety upgrades across 198,369 square feet of the LBJ building in Washington, D.C. Proposals are due June 4, 2021 with selection following FAR Part 15 procedures. The NAICS code for this opportunity is 236220 and the small business size standard is $39.5 million in average annual receipts.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation Notice - LBJ Consolidation & Switchgear, newest first.
File Type Posted
Bid Spreadsheet_Rev_6.7.21.xlsx XLSX spreadsheet
AS-50-06 - Sign Types Detail Sheet.pdf PDF
Solicitation 47PM0121R0013 revised 20210604.pdf PDF
AS-50-03 - Sign Types Detail Sheet.pdf PDF
RFIs (Round 2) and Response 6.4.21.pdf PDF
GSA-DoED_Addendum-02_MEP_5.24.21.pdf PDF
012400 Options_5.24.21 Revision.pdf PDF
26 32 13 - ENGINE GENERATOR(S) AND ACCESSORIES.pdf PDF
PBS Past Performance Form.docx DOCX document
Solicitation 47PM0121R0013 revised 20210525.pdf PDF
SF30 47PM0121R0013_0002.pdf PDF
RFI and Response_5.24.21.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 3.pdf PDF
LBJ 1959 Full Set Vol 1.pdf PDF
SF30 47PM0121R0013_0001.pdf PDF
PreProposal Minutes Attendee List.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 1 SMALL.pdf PDF
GSA LBJ DoED IFB SPEC Vol 1rev.pdf PDF
LBJ 1959 Full Set Vol 2.pdf PDF
LBJ 1995 Architectural Set.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 2.pdf PDF
SOW LBJ Consolidation Construction Services.pdf PDF
Instructions LBJ Virtual Site Walk READ ME.pdf PDF
Drawings - ARCH Vol 1.pdf PDF
Drawing - Signage.pdf PDF
Drawing - TELE.pdf PDF
1914_GSA-DoED_Switchgear - Electrical_210423.pdf PDF
Layout for staging - switchgear.pdf PDF
2019.07.12_LBJ_BPP 100% Submission.pdf PDF
SF1442 47PM0121R0013.pdf PDF
Agreement (draft) RFP 47PM0121R0013.pdf PDF
Bid Spreadsheet.xlsx XLSX spreadsheet
Drawings - ARCH Vol 2.pdf PDF
Drawing - FP.pdf PDF
LBJ_5thFl_bathrooms-Staging.pdf PDF
SFLLL.pdf PDF
Solicitation 47PM0121R0013.pdf PDF
Reps and Certs 47PM0121R0013.pdf PDF
Drawing - PLUM.pdf PDF
SPEC Vol 1 GSA LBJ DoED.pdf PDF
SPEC Vol 2 GSA LBJ DoED.pdf PDF
LBJ_2ndFl_bathrooms-Staging.pdf PDF
GSA527.pdf PDF
Drawing - HVAC.pdf PDF
Drawing - FA.pdf PDF
Drawing - ELEC.pdf PDF
Drawing - AV.pdf PDF
1914_GSA-DoED_L2 L5 - Combined_210423.pdf PDF
Contractor Site Office.pdf PDF
Narrative Modernization Issue for Bid LBJ 2021April23.pdf PDF
Show all 50

Solicitation Notice - LBJ Consolidation & Switchgear has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Sheet for LBJ Consolidation
(Revised 5/19/2021)
Data Input
Calculated Amount
CLINITEMPRICE
1Base ContractConstruction Phase Services - 4th Floor4th Floor Construction
1aCost of the Work
1bAV Equipment
1cGeneral Conditions
1dInsurance & Bonds
1eOverhead
1fProfit
1gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 1 - Field Built Glass Wall Partitions
Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)
Alternate No. 5 - Shelter-in-place Doors
Alternate No. 8 - Vacancy Sensor Office Outlet Control
Alternate No. 9 - Removal of Soundmasking Speakers in Offices
Total Base Contract Value with Alternates$ - 0
2Option 1Construction Phase Services - SwitchgearSwitchgear Construction
2aCost of the Work
2bGeneral Conditions
2cInsurance & Bonds
2dOverhead
2eProfit
2fTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
3Option 2Construction Phase Services - 3rd Floor3rd Floor Construction
3aCost of the Work
3bFurniture Removal
3cAV Equipment
3dGeneral Conditions
3eInsurance & Bonds
3fOverhead
3gProfit
3hTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 1 - Field Built Glass Wall Partitions
Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)
Alternate No. 5 - Shelter-in-place Doors
Alternate No. 6 - Reduction of offices
Alternate No. 8 - Vacancy Sensor Office Outlet Control
Alternate No. 9 - Removal of Soundmasking Speakers in Offices
$ - 0
4Option 3Construction Phase Services - 6th Floor6th Floor Construction
4aCost of the Work
4bFurniture Removal
4cAV Equipment
4dGeneral Conditions
4eInsurance & Bonds
4fOverhead
4gProfit
4hTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 1 - Field Built Glass Wall Partitions
Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)
Alternate No. 5 - Shelter-in-place Doors
Alternate No. 8 - Vacancy Sensor Office Outlet Control
Alternate No. 9 - Removal of Soundmasking Speakers in Offices
$ - 0
5Option 4Construction Phase Services7th Floor Construction (Phases 1 & 2)
5aCost of the Work
5bFurniture Removal
5cAV Equipment
5dGeneral Conditions
5eInsurance & Bonds
5fOverhead
5gProfit
5hTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 1 - Field Built Glass Wall Partitions
Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)
Alternate No. 5 - Shelter-in-place Doors
Alternate No. 7 - UPS Generator Installation
Alternate No. 8 - Vacancy Sensor Office Outlet Control
Alternate No. 9 - Removal of Soundmasking Speakers in Offices
$ - 0
6Option 5Construction Phase Services - 2nd Floor2nd Floor Bathrooms
6aCost of the Work
6bPlumbing Fixtures
6cGeneral Conditions
6dInsurance & Bonds
6eOverhead
6fProfit
6gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 2 - Toilet Partition Type
Alternate No. 3 - Reduced Ceramic Tile Quantity
$ - 0
7Option 6Construction Phase Services - 3rd Floor3rd Floor Bathrooms
7aCost of the Work
7bPlumbing Fixtures
7cGeneral Conditions
7dInsurance & Bonds
7eOverhead
7fProfit
7gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 2 - Toilet Partition Type
Alternate No. 3 - Reduced Ceramic Tile Quantity
$ - 0
8Option 7Construction Phase Services - 4th Floor4th Floor Bathrooms
8aCost of the Work
8bPlumbing Fixtures
8cGeneral Conditions
8dInsurance & Bonds
8eOverhead
8fProfit
8gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 2 - Toilet Partition Type
Alternate No. 3 - Reduced Ceramic Tile Quantity
$ - 0
9Option 8Construction Phase Services - 5th Floor5th Floor Bathrooms
9aCost of the Work
9bPlumbing Fixtures
9cGeneral Conditions
9dInsurance & Bonds
9eOverhead
9fProfit
9gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 2 - Toilet Partition Type
Alternate No. 3 - Reduced Ceramic Tile Quantity
$ - 0
10Option 9Construction Phase Services - 6th Floor6th Floor Bathrooms
10aCost of the Work
10bPlumbing Fixtures
10cGeneral Conditions
10dInsurance & Bonds
10eOverhead
10fProfit
10gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 2 - Toilet Partition Type
Alternate No. 3 - Reduced Ceramic Tile Quantity
$ - 0
11Option 10Construction Phase Services - 7th Floor7th Floor Bathrooms (Phases 1 & 2)
11aCost of the Work
11bPlumbing Fixtures
11cGeneral Conditions
11dInsurance & Bonds
11eOverhead
11fProfit
11gTotal Construction Phase Services (Lump Sum, Firm Fixed Price)$ - 0
Alternate No. 2 - Toilet Partition Type
Alternate No. 3 - Reduced Ceramic Tile Quantity
$ - 0
Total Evaluated Overall Contract Value with Options$ - 0
Total Evaluated Overall Contract Value with Options and Alternates$ - 0
Item #Alternates - See Specification 012300
No. 1Alternate No. 1 - Field Built Glass Wall Partitions$ - 0
No. 2Alternate No. 2 - Toilet Partition Type (Bathroom Options only)$ - 0
No. 3Alternate No. 3 - Reduced Ceramic Tile Quantity$ - 0
No. 4Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)$ - 0
No. 5Alternate No. 5 - Shelter-in-place Doors$ - 0
No. 6Alternate No. 6 - Reduction of offices (3rd Floor Construction Option only)$ - 0
No. 7Alternate No. 7 - UPS Generator Installation (7th Floor Construction Option only)$ - 0
No. 8Alternate No. 8 - Vacancy Sensor Office Outlet Control$ - 0
No. 9Alternate No. 9 - Removal of Soundmasking Speakers in Offices$ - 0

Total Alternate Pricing $ - 0

Item #Unit Pricing - See Specification 012700Unit Rate
1Gympsum Board Partition Type 1B Assembly
2Gypsum Board Partition Type 2B Assembly
3Conference Room Demountable Glazed Partition Type 11
4Conference Room Pivot Glazed Door for Partition Type 11
5Office Demountable Glazed Partition Type 12
7Conference Room Field Built Glazed Partition Type 11
8Office Field Built Glazed Partition Type 12
9Historic Marble Minor Repair - See "Repair" in Spec. 013510
Total Unit Pricing$ - 0
Notes:
See Specification 012400 and Construction Documents for descriptions of Options.
See Specification 012700 for details on the Unit Pricing.
See Specification 012300 for descriptions of all Alternates. The alternate pricing shall be listed with each CLIN and shall include the difference in cost as an add or deduct from the Total Construction Phase Services for that CLIN. The alternates listed in the Alternates section will automatically populate the total cost of that add or deduct alternate as a sum of all CLINs.
See 274116 for description of Audio Visual Equipment scope to be broken out separately above.
The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM 552.243-71)
Item #Overhead Pricing
1Overhead (Home Office)%Percent (%)
2Extended Overhead (Field Office)Per Calendar Day.
Item #Escalation Rate
1Escalation Rate utilized per year