Instructions LBJ Virtual Site Walk READ ME.pdf

PDF 486 KB Posted

Attached to
Solicitation Notice - LBJ Consolidation & Switchgear Federal contract opportunity
Solicitation number
47PM0121R0013
Issued by
General Services Administration Public Buildings Service

About this file

This solicitation notice seeks proposals for a firm fixed-price construction contract. The General Services Administration's Public Buildings Service, National Capital Region is soliciting proposals to renovate floors 3, 4, 6, and 7 totaling approximately 198,369 square feet of open office space and 10,000 square feet of bathrooms at the Lyndon Baines Johnson Building in Washington D.C. for the Department of Education. The scope of work includes interior alterations, mechanical and electrical upgrades, and life safety improvements. The North American Industry Classification System code for this work is 236220 and the small business size standard is $39.5 million in average annual receipts. Interested firms must register in the System for Award Management and submit proposals no later than June 4, 2021. A virtual pre-proposal conference will be held on May 5, 2021 and the project site can be viewed virtually using the provided StructionSite link. The selection process will follow Federal Acquisition Regulation Part 15 procedures for a best value source selection.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation Notice - LBJ Consolidation & Switchgear, newest first.
File Type Posted
Bid Spreadsheet_Rev_6.7.21.xlsx XLSX spreadsheet
Solicitation 47PM0121R0013 revised 20210604.pdf PDF
AS-50-03 - Sign Types Detail Sheet.pdf PDF
AS-50-06 - Sign Types Detail Sheet.pdf PDF
RFIs (Round 2) and Response 6.4.21.pdf PDF
Bid Spreadsheet_Rev 1_5.24.21.xlsx XLSX spreadsheet
012400 Options_5.24.21 Revision.pdf PDF
26 32 13 - ENGINE GENERATOR(S) AND ACCESSORIES.pdf PDF
GSA-DoED_Addendum-02_MEP_5.24.21.pdf PDF
PBS Past Performance Form.docx DOCX document
Solicitation 47PM0121R0013 revised 20210525.pdf PDF
SF30 47PM0121R0013_0002.pdf PDF
RFI and Response_5.24.21.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 3.pdf PDF
LBJ 1959 Full Set Vol 1.pdf PDF
SF30 47PM0121R0013_0001.pdf PDF
PreProposal Minutes Attendee List.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 1 SMALL.pdf PDF
GSA LBJ DoED IFB SPEC Vol 1rev.pdf PDF
LBJ 1959 Full Set Vol 2.pdf PDF
LBJ 1995 Architectural Set.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 2.pdf PDF
SF1442 47PM0121R0013.pdf PDF
Agreement (draft) RFP 47PM0121R0013.pdf PDF
Bid Spreadsheet.xlsx XLSX spreadsheet
Drawings - ARCH Vol 2.pdf PDF
Drawing - FP.pdf PDF
LBJ_5thFl_bathrooms-Staging.pdf PDF
SFLLL.pdf PDF
SOW LBJ Consolidation Construction Services.pdf PDF
Drawings - ARCH Vol 1.pdf PDF
Drawing - Signage.pdf PDF
Drawing - TELE.pdf PDF
1914_GSA-DoED_Switchgear - Electrical_210423.pdf PDF
Layout for staging - switchgear.pdf PDF
2019.07.12_LBJ_BPP 100% Submission.pdf PDF
Solicitation 47PM0121R0013.pdf PDF
Reps and Certs 47PM0121R0013.pdf PDF
Drawing - PLUM.pdf PDF
SPEC Vol 1 GSA LBJ DoED.pdf PDF
SPEC Vol 2 GSA LBJ DoED.pdf PDF
LBJ_2ndFl_bathrooms-Staging.pdf PDF
GSA527.pdf PDF
Drawing - HVAC.pdf PDF
Drawing - FA.pdf PDF
Drawing - ELEC.pdf PDF
Drawing - AV.pdf PDF
1914_GSA-DoED_L2 L5 - Combined_210423.pdf PDF
Contractor Site Office.pdf PDF
Narrative Modernization Issue for Bid LBJ 2021April23.pdf PDF
Show all 50

Solicitation Notice - LBJ Consolidation & Switchgear has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LBJ Consolidation Existing Site Conditions Viewing Instructions

Table of Contents

1. Introduction

2. Ground Documentation – StructionSite

LBJ Consolidation Existing Site Conditions:

Existing Building Viewing Instructions

NOTE: 52.236-3 Site Investigation and Conditions Affecting the Work. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

Project: LBJ Consolidation

April 2nd, 2021

1. Introduction:

1.1. Project Overview: The project consists of furnishing all management, supervision, subcontractors, consultants, labor, materials, supplies and equipment to plan, schedule, construct, coordinate and assure effective performance of all requested construction services to meet the General Services Administration and its client agency’s (Department of Education) requirements. This Construction contract is for the renovation of floors 3, 4, 6, & 7 (approximately 198,369 USF) of the existing building to be reconstructed as open office space with sufficient workspace and meeting space to meet the Department of Education’s programmatic requirements. The project shall improve the utilization rate of the LBJ Building and allow the Department of Education to add approximately 600 employees from leased spaces into the building. The project will include interior alterations and open workspace construction, including a few system upgrades to HVAC, new power distribution circuits, power distribution breaker tie upgrades, Life Safety items such as floor fire alarm and sprinkler systems in order to comply with current applicable codes, and bathroom renovations. The project also includes significant renovations to the major Switchgear and electrical systems servicing the building.

1.2. Existing Site Conditions Capture: The Lyndon Baines Johnson (LBJ) Building existing site was documented by both standard 2D and 360-degree camera photos. The photos were taken between November 2020 and March 2021. There are images from October

2019 of the 5th floor demolition to show the typical conditions above ceilings and behind walls that the Contractor may find during demolition of the floors within the scope of this project. These images are all organized on the existing floor plans and will be available for your viewing through a web-based platform.

1.3. Virtual Site Access: Offerors will be able to virtually view the site with our online tools.

StructionSite was used to capture images on the ground with a 360° camera and a cell phone camera. Further instructions on how to view these images will be found in section 2 .

NOTE: 52.236-3 Site Investigation and Conditions Affecting the Work. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

1.4. Visualization Purposes: Offerors will be able to use this online tool to familiarize themselves with the existing LBJ Building and property, staging locations, loading access locations, and existing building conditions. This is a visualization tool only and does not contain contractual requirements.

2. Documentation – StructionSite: StructionSite will give viewers both standard and 360° images at various levels of the existing building that are current as of April 2021. These images are located with “pins” on plans of the site. A link to the project on

StructionSite.com will let users view the project online.

2.1. StructionSite Online Version: The online viewing option will be accessed through a web browser; no data will be saved on your local computer.

Step 1. Accessing StructionSite. To view this project on StructionSite.com use the following link, you will not need to create a log in:

https://app.structionsite.com/vp/73a4c0db-376b-45ca-b155-d2917d895d49

Step 2. Accessing Images. When you open the link, you will see the eleven

“Drawings”:

Basement Plan

Level 2 Floor Plan

Level 3 Floor Plan

Level 4 Floor Plan

Level 5 Floor Plan

Level 6 Floor Plan

Level 7 Floor Plan

Penthouse Plan East

Penthouse Plan West

Site Plan

Sub-basement Floor Plan (Switchgear)

Each plan is intended to show existing conditions of areas designated in the

Construction Documents for construction. The plans also show key information related to building logistics.

The Offeror may submit a request for additional images as a Procurement RFI by the due date identified in the solicitation. The Offeror must be specific in identifying which drawing plan and which location images are requested for. Responses will be provided https://app.structionsite.com/vp/73a4c0db-376b-45ca-b155-d2917d895d49

NOTE: 52.236-3 Site Investigation and Conditions Affecting the Work. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

with the RFI response Amendment and the Government will add the photograph to

StructionSite. All Offerors will have access to all photographs.

To enter into these drawings just click on one to choose it. This viewer will consolidate the image pins if you are zoomed out. You will see colored circles (see Figure 2.1) with numbers in the middle which tells you how many pictures are located in that location.

Use the scroll on your mouse or click on the circles to zoom in and the circles will break apart so you can see the individual pins.

Figure 2.1

Step 3. Navigating and Viewing Images. Once a drawing is opened, you will notice orange pins, smaller orange dots, and blue triangles on the PDF (see Figure 2.2). The orange pins are 360° pictures, the smaller orange dots are VideoWalk nodes and the blue triangles are standard cell phone pictures. To view any of the pins, click on the pin, a preview screen will appear in the top left of your current screen, click on the preview to make it full size. To navigate the 360° environment, click and hold then drag your mouse to look around. You can use the mouse scroller to zoom in and out. You can easily navigate to other pins in this option by using the “Mini Map” on the bottom left of your screen, just click on another pin to view that location. Your current location is shown on the mini map as well. When viewing a 360° image the orange pin will have a black interior to denote the current image location or a green triangle when viewing standard images (see Figure 2.2). To return to the drawing view, use the back arrow at the top left. In a standard picture you will be able to zoom in and out by using the scroller on your mouse. When zoomed in, you can pan around the picture by clicking holding and dragging your mouse.

Figure 2.2

Multiple pins in these locations.

Zoom in to see individual pins.

NOTE: 52.236-3 Site Investigation and Conditions Affecting the Work. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

The Offeror may submit questions regarding StructionSite (technical issues or otherwise) as a question at the Pre-proposal conference or as a Procurement RFI by the due date identified in the solicitation.

Responses will be addressed either at the Pre-proposal conference or within the RFI response

Amendment.