SF30 47PM0121R0013_0004.pdf

PDF 593 KB Posted

Attached to
Solicitation Notice - LBJ Consolidation & Switchgear Federal contract opportunity
Solicitation number
47PM0121R0013
Issued by
General Services Administration Public Buildings Service

About this file

This document is an amendment to a solicitation for construction services for the LBJ Consolidation and Switchgear project. The amendment provides clarifications and corrections to the bid spreadsheet, instructing offerors to use the updated spreadsheet attached in SAM.gov. The project scope includes the renovation of floors 3, 4, 6, and 7 of approximately 198,369 square feet as well as 10,000 square feet of bathrooms to reconstruct the space as open office and meeting areas to accommodate an additional 600 employees for the Department of Education. Renovations and upgrades will be made to interior spaces, HVAC, power distribution circuits, fire alarm and sprinkler systems. Significant work is also required for switchgear and electrical systems serving the building. The pre-proposal conference will be held virtually and the solicitation closing date remains June 4, 2021 at 4:00 PM EDT.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation Notice - LBJ Consolidation & Switchgear, newest first.
File Type Posted
Bid Spreadsheet_Rev_6.7.21.xlsx XLSX spreadsheet
AS-50-06 - Sign Types Detail Sheet.pdf PDF
Solicitation 47PM0121R0013 revised 20210604.pdf PDF
AS-50-03 - Sign Types Detail Sheet.pdf PDF
RFIs (Round 2) and Response 6.4.21.pdf PDF
GSA-DoED_Addendum-02_MEP_5.24.21.pdf PDF
Bid Spreadsheet_Rev 1_5.24.21.xlsx XLSX spreadsheet
012400 Options_5.24.21 Revision.pdf PDF
26 32 13 - ENGINE GENERATOR(S) AND ACCESSORIES.pdf PDF
PBS Past Performance Form.docx DOCX document
Solicitation 47PM0121R0013 revised 20210525.pdf PDF
SF30 47PM0121R0013_0002.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 3.pdf PDF
LBJ 1959 Full Set Vol 1.pdf PDF
SF30 47PM0121R0013_0001.pdf PDF
PreProposal Minutes Attendee List.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 1 SMALL.pdf PDF
GSA LBJ DoED IFB SPEC Vol 1rev.pdf PDF
LBJ 1959 Full Set Vol 2.pdf PDF
LBJ 1995 Architectural Set.pdf PDF
1914_GSA-DoED_Issue for Bid - Architectural_210423_Vol 2.pdf PDF
SOW LBJ Consolidation Construction Services.pdf PDF
Instructions LBJ Virtual Site Walk READ ME.pdf PDF
Drawings - ARCH Vol 1.pdf PDF
Drawing - Signage.pdf PDF
Drawing - TELE.pdf PDF
1914_GSA-DoED_Switchgear - Electrical_210423.pdf PDF
Layout for staging - switchgear.pdf PDF
2019.07.12_LBJ_BPP 100% Submission.pdf PDF
SF1442 47PM0121R0013.pdf PDF
Agreement (draft) RFP 47PM0121R0013.pdf PDF
Bid Spreadsheet.xlsx XLSX spreadsheet
Drawings - ARCH Vol 2.pdf PDF
Drawing - FP.pdf PDF
LBJ_5thFl_bathrooms-Staging.pdf PDF
SFLLL.pdf PDF
Solicitation 47PM0121R0013.pdf PDF
Reps and Certs 47PM0121R0013.pdf PDF
Drawing - PLUM.pdf PDF
SPEC Vol 1 GSA LBJ DoED.pdf PDF
SPEC Vol 2 GSA LBJ DoED.pdf PDF
LBJ_2ndFl_bathrooms-Staging.pdf PDF
GSA527.pdf PDF
Drawing - HVAC.pdf PDF
Drawing - FA.pdf PDF
Drawing - ELEC.pdf PDF
Drawing - AV.pdf PDF
1914_GSA-DoED_L2 L5 - Combined_210423.pdf PDF
Contractor Site Office.pdf PDF
Narrative Modernization Issue for Bid LBJ 2021April23.pdf PDF
Show all 50

Solicitation Notice - LBJ Consolidation & Switchgear has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

MicheleAppello Typewriter Michele Appello

MicheleAppello Typewriter 06/07/2021

47PM0121R0013/0004

Description of Modification Continuation Page

Solicitation 47PM0121R0013 - LBJ Consolidation Construction & Switchgear is hereby amended (0004) to include the following:

Bid Spreadsheet_Rev_6.7.21 (formulas corrected)

Offeros are instructed to use the updated spreadsheet attached in SAM.gov. The proposal due date of 4:00 PM ET on 6/15/2021 and all other terms and conditions remain unchanged. Should you have any questions about this amendment, please send them to the Contract Specialist (michele.appello@gsa.gov).

Data Input

Calculated Amount

CLIN ITEM PRICE

1 Base Contract Construction Phase Services - 4th Floor 4th Floor Construction

1a Cost of the Work

1b AV Equipment

1c General Conditions

1d Insurance & Bonds

1e Overhead

1f Profit

1g Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 1 - Field Built Glass Wall Partitions

Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)

Alternate No. 5 - Shelter-in-place Doors

Alternate No. 8 - Vacancy Sensor Office Outlet Control

Alternate No. 9 - Removal of Soundmasking Speakers in Offices

Total Base Contract Value with Alternates

2 Option 1 Construction Phase Services - Switchgear Switchgear Construction

2a Cost of the Work

2b General Conditions

2c Insurance & Bonds

2d Overhead

2e Profit

2f Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

3 Option 2 Construction Phase Services - 3rd Floor 3rd Floor Construction

3a Cost of the Work

3b Furniture Removal

3c AV Equipment

3d General Conditions

3e Insurance & Bonds

3f Overhead

3g Profit

3h Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 1 - Field Built Glass Wall Partitions

Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)

Alternate No. 5 - Shelter-in-place Doors

Alternate No. 6 - Reduction of offices

Alternate No. 8 - Vacancy Sensor Office Outlet Control

Alternate No. 9 - Removal of Soundmasking Speakers in Offices

4 Option 3 Construction Phase Services - 6th Floor 6th Floor Construction

4a Cost of the Work

4b Furniture Removal

4c AV Equipment

4d General Conditions

4e Insurance & Bonds

4f Overhead

4g Profit

4h Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 1 - Field Built Glass Wall Partitions

Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)

Alternate No. 5 - Shelter-in-place Doors

Alternate No. 8 - Vacancy Sensor Office Outlet Control

Alternate No. 9 - Removal of Soundmasking Speakers in Offices

5 Option 4 Construction Phase Services 7th Floor Construction (Phases 1 & 2)

5a Cost of the Work

5b Furniture Removal

5c AV Equipment

5d General Conditions

5e Insurance & Bonds

5f Overhead

5g Profit

5h Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 1 - Field Built Glass Wall Partitions

Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01)

Alternate No. 5 - Shelter-in-place Doors

Alternate No. 7 - UPS Generator Installation

Alternate No. 8 - Vacancy Sensor Office Outlet Control

Alternate No. 9 - Removal of Soundmasking Speakers in Offices

6 Option 5 Construction Phase Services - 2nd Floor 2nd Floor Bathrooms

6a Cost of the Work

6b Plumbing Fixtures

6c General Conditions

6d Insurance & Bonds

6e Overhead

6f Profit

6g Total Construction Phase Services (Lump Sum, Firm Fixed Price)

Alternate No. 2 - Toilet Partition Type

Alternate No. 3 - Reduced Ceramic Tile Quantity

7 Option 6 Construction Phase Services - 3rd Floor 3rd Floor Bathrooms

7a Cost of the Work

7b Plumbing Fixtures

7c General Conditions

7d Insurance & Bonds

Bid Sheet for LBJ Consolidation (Revised 5/19/2021)

7e Overhead

7f Profit

7g Total Construction Phase Services (Lump Sum, Firm Fixed Price)

Alternate No. 2 - Toilet Partition Type

Alternate No. 3 - Reduced Ceramic Tile Quantity

8 Option 7 Construction Phase Services - 4th Floor 4th Floor Bathrooms

8a Cost of the Work

8b Plumbing Fixtures

8c General Conditions

8d Insurance & Bonds

8e Overhead

8f Profit

8g Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 2 - Toilet Partition Type

Alternate No. 3 - Reduced Ceramic Tile Quantity

9 Option 8 Construction Phase Services - 5th Floor 5th Floor Bathrooms

9a Cost of the Work

9b Plumbing Fixtures

9c General Conditions

9d Insurance & Bonds

9e Overhead

9f Profit

9g Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 2 - Toilet Partition Type

Alternate No. 3 - Reduced Ceramic Tile Quantity

10 Option 9 Construction Phase Services - 6th Floor 6th Floor Bathrooms

10a Cost of the Work

10b Plumbing Fixtures

10c General Conditions

10d Insurance & Bonds

10e Overhead

10f Profit

10g Total Construction Phase Services (Lump Sum, Firm Fixed Price) -$

Alternate No. 2 - Toilet Partition Type

Alternate No. 3 - Reduced Ceramic Tile Quantity

11 Option 10 Construction Phase Services - 7th Floor 7th Floor Bathrooms (Phases 1 & 2)

11a Cost of the Work

11b Plumbing Fixtures

11c General Conditions

11d Insurance & Bonds

11e Overhead

11f Profit

11g Total Construction Phase Services (Lump Sum, Firm Fixed Price)

Alternate No. 2 - Toilet Partition Type

Alternate No. 3 - Reduced Ceramic Tile Quantity

Total Evaluated Overall Contract Value with

Options -$

Total Evaluated Overall Contract Value with

Options and Alternates -$

Item # Alternates - See Specification 012300

No. 1 Alternate No. 1 - Field Built Glass Wall Partitions -$

No. 2 Alternate No. 2 - Toilet Partition Type (Bathroom Options only) -$

No. 3 Alternate No. 3 - Reduced Ceramic Tile Quantity -$

No. 4 Alternate No. 4 - Office Partition Wall Type Height Reduction (see head detail - H5/A-60-01) -$

No. 5 Alternate No. 5 - Shelter-in-place Doors -$

No. 6 Alternate No. 6 - Reduction of offices (3rd Floor Construction Option only) -$

No. 7 Alternate No. 7 - UPS Generator Installation (7th Floor Construction

Option only) -$

No. 8 Alternate No. 8 - Vacancy Sensor Office Outlet Control -$

No. 9 Alternate No. 9 - Removal of Soundmasking Speakers in Offices -$

Total Alternate Pricing -$

Item # Unit Pricing - See Specification 012700 Unit Rate

1 Gympsum Board Partition Type 1B Assembly

2 Gypsum Board Partition Type 2B Assembly

3 Conference Room Demountable Glazed Partition Type 11

4 Conference Room Pivot Glazed Door for Partition Type 11

5 Office Demountable Glazed Partition Type 12

7 Conference Room Field Built Glazed Partition Type 11

8 Office Field Built Glazed Partition Type 12

9 Historic Marble Minor Repair - See "Repair" in Spec. 013510

Total Unit Pricing -$ Notes:

See Specification 012400 and Construction Documents for descriptions of Options.

See Specification 012700 for details on the Unit Pricing.

See 274116 for description of Audio Visual Equipment scope to be broken out separately above.

See Specification 012300 for descriptions of all Alternates. The alternate pricing shall be listed with each CLIN and shall include the difference in cost as an add or deduct from the Total

Item # Overhead Pricing

1 Overhead (Home Office)% Percent (%)

2 Extended Overhead (Field Office) Per Calendar Day.

Item # Escalation Rate

1 Escalation Rate utilized per year

The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM

552.243-71)

topmostSubform[0]:
Page1[0]:
Code[0]: WPH1AA
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: WPIAA
NameandTitleOfficer[0]: Michele Appello, Contracting Officer Region 11
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 2
AmendmentNo[0]: 0004
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Capital Projects Division, Office of Design and Construction, GSA, PBS, NCR

301 7th St SW

WASHINGTON, DC 20407-0001 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQWPIAA-21-0015
Dated9B[0]: 4/26/2021
C13[0]:
Description[0]:

[See Description of Modification Continuation Page]

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PM0121R0013
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 6/7/2021
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: GSA, PBS R11 Office of Acquisition

Construction Services Center 1 (CSD Ctr 1) 1800 F Street, NW, 4th Floor Washington, DC 20405 USA NameandTitleSigner[0]:

Page2[0]:
TextField1[5]:
TextField1[4]:
TextField1[3]:
TextField1[2]:
TextField1[1]:
TextField1[0]:

File details come from the government source that posted it. Updated .