SOW_B-2_CLN-1_38KC3123CT_A01_NEW TGI_c0v0.pdf
PDF 287 KB Posted
- Attached to
- USS SHOUP (DDG-86) 7C1 SRA BUNDLE-2
- Solicitation number
- N6264926RA060
About this file
This is a WebAIM Short Form Task Group Instruction (TGI) for the USS SHOUP (DDG-86), a naval vessel, dated 12-MAY-2026. The document provides detailed work instructions for replacing exterior insulation and lagging on the 2A Gas Turbine Module (GTM) exhaust duct located in Intake/Uptake Engine Room No. 2 (compartment 1-268-2-Q) and Passage (1-254-6-L). The work involves removing 92 square feet of existing insulation and lagging specified as MIL-PRF-2818 (exterior insulation) and MIL-C-20079, Type I, Class 9 (lagging), with piece number DMEX2/UP003. The work is identified with Job Summary ID 123A21CT and JCN EM02-WA05.
The procedure requires removal of existing materials per MIL-STD-769 guidance, installation of new insulation and lagging per naval standards and drawing 259-7060867, and surface treatment per specified requirements. A potential asbestos hazard is noted as an initial condition. The contractor start and completion dates are referenced to the TGI POP (Period of Performance) List. SRF-JRMC (Shore Repair Facility-Japan Regional Maintenance Center) will provide government-furnished materials listed and support services including crane and rigging, utility services (air, water, steam), safety inspections, gas-free inspections, and QA inspections. The material list includes ten line items covering thermal insulation blankets (mineral wool), wire mesh, cement, strapping, adhesive, glass cloth, felt, and cork-rubber sheet, all ordered for contractor use. Work certification signatures from completion of work review and records review are required.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
12-MAY-2026 1007
20.15.6.0.9333 (July 2025) ICN: 38KC3123CT KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #2A GTM UPTAKE IN A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 25913
CU PHASE TITLE: *F/O – REPLACE INSULATION AND LAGGING ON 2A GTM EXHAUST DUCT IN 1-268-2-Q
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 6
EM02WA05
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HOSODA, MASATO 234 3152434572 06-MAY-2026
APPROVED BY: CODE: PHONE: DATE:
IZUMI, NORIAKI 234 3152432243 08-MAY-2026
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-WA05
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE STACK U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A21CT
1. SCOPE/PURPOSE:
1.1 Title: Exterior Insulation and Lagging on 2A Gas Turbine Module (GTM) Exhaust Duct; replace
1.2 Location of Work:
1.2.1 Intake Uptake Engine Room No. 2 (1-268-2-Q)
1.2.2 Passage (1-254-6-L)
1.3 Identification:
1.3.1 Quantity (92 SF), Exterior Insulation, 2A GTM Exhaust Duct Exterior Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Piece Number: DMEX2/UP003 Remarks: See Sketch Enclosure-01 for details.
TGI Short Form
12-MAY-2026 1007
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123CT KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #2A GTM UPTAKE IN A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 25913
CU PHASE TITLE: *F/O – REPLACE INSULATION AND LAGGING ON 2A GTM EXHAUST DUCT IN 1-268-2-Q
FOUO Pg 2 of 6
CU PHASE DESCRIPTION (Cont.)
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor Start Date: See TGI POP List
1.7 Contractor Work Completion Date: See TGI POP List
2. PROCEDURE:
2.1 Remove each existing insulation and lagging listed in 1.3.1 from exhaust duct, using Ref. No. 3 for guidance.
2.2 Accomplish the requirements of 009-011 of Ref. No. One for installation each new insulation and lagging listed in 1.3.1 to exhaust duct, using Ref. No. 4 for guidance.
2.2.1 Accomplish the requirements of 009-032 of Ref. No. One for top surface where new insulation and lagging are installed.
2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 234 M. Hosoda, 243-4572
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 JCN EM02-WA05 is related to this TGI.
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM listed in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No: 38KC3123CTS02)
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Provide utility service.
2.6.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbol(s).
12-MAY-2026 1007
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123CT KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #2A GTM UPTAKE IN A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 25913
CU PHASE TITLE: *F/O – REPLACE INSULATION AND LAGGING ON 2A GTM EXHAUST DUCT IN 1-268-2-Q
FOUO Pg 3 of 6
CU PHASE DESCRIPTION (Cont.)
12-MAY-2026 1007
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123CT KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #2A GTM UPTAKE IN A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 25913
CU PHASE TITLE: *F/O – REPLACE INSULATION AND LAGGING ON 2A GTM EXHAUST DUCT IN 1-268-2-Q
FOUO Pg 4 of 6
OTHER SPECIAL REQUIREMENTS:
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI LI FY-27 Local Standard Items - N 3 MIL MIL-STD-769 Insulation Requirements for
U.S. Naval Vessels K 1 N
4 DWG 259-7060867 FAB & INSTL OF GTRB
UPTAKE ENG RM NO.2 &
ABOVE
B N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M INSULATI, INSULATION
BLANKET,
THERMAL,MINERAL
WOOL,SPEC: MIL-PRF-
2818,SIZE: 24" X 48" X 2" THK,
DENSITY: 8 LBS/CU FT,BIW
CATALOG NO. 47111-
030,ROCKWOOL P/N: SEAROX
SL 620(128),
REMARKS: OMIT METALLIC
SUPPORT MEMBERS FROM
BOTH SIDES,
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9B 5640 LL9606678 NA 4 N 61277554 15/SH
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC3123CT KEY OP: A01
12-MAY-2026 1007
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123CT KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #2A GTM UPTAKE IN A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 25913
CU PHASE TITLE: *F/O – REPLACE INSULATION AND LAGGING ON 2A GTM EXHAUST DUCT IN 1-268-2-Q
FOUO Pg 5 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
002 M WIRE MES,
WIRE,MESH,CHICKEN NET,#20
X 16 MESH
NO.20G,HEXAGONAL WIRE
NETTING,
GALVANIZED
STEEL,1RLL=30METER
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9Z 5340 LL4651079 NA 4 N 61277811 1/RL
003 M CEMENT,I, CEMENT, FINISH
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9Q 5640 002264540 NA 4 Y 61275112 4/BG
004 M SEAL,STR, SEAL, STRAPPING
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9B 5340 006643249 NA 4 N 61275131 10/EA
005 M STRAPPIN, HAYATA TOUGH
BAND, MATL: CRES 316,
5/8"(15.88MM)W X
0.015"(0.38MM)THK X 100FT
LG.
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9Z 5340 LL6978272 NA 4 N 61277555 2/RO
006 M WIRE FAB, WIRE MESH
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9B 5335 005989404 NA 4 N 61275139 1/EA
007 M ADHESIVE, ADHESIVE FOR
CLOTH
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9B 8040 002738708 NA 4 Y 61275142 7/GL
008 M CLOTH,PL, H/W GLASS CLOTH
COLOR IS NATURAL
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9B 8305 001487364 NA 4 N 61275144 1/RO
009 M INSULATI, FELT,
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9B 5640 001736591 NA 4 Y 61275148 1/RO
12-MAY-2026 1007
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123CT KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #2A GTM UPTAKE IN A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 25913
CU PHASE TITLE: *F/O – REPLACE INSULATION AND LAGGING ON 2A GTM EXHAUST DUCT IN 1-268-2-Q
FOUO Pg 6 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
010 M CORK AND, CORK AND
RUBBER SHEET,
SPEC: AMS-C-6183
(FORMERLY: MIL-C-6183), TY-I
(MOLDED), CL-1 (AROMATIC
FUEL), GR-B (MEDIUM),
SIZE: 36"W X 36"L X 3/16"THK,
ORDERED FOR KTR
ORIG: C234 M. HOSODA, 243-
9Z 5330 LL4823084 NA 4 N 61277556 1/SH
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38KC3123CTA01-Sketch.pdf 06-MAY-2026 0000
SKETCH
ENCLOSURE-01 Sheet 1 of 138KC3123CTA01
Remove existing and install new insulation and lagging listed in 1.3.1
Intake /Uptake Engine Room No. 2 (1-268-2-Q)
File details come from the government source that posted it. Updated .