This is a Task Group Instruction (TGI) document for repair work on the USS SHOUP (DDG-86) Navy destroyer. The document specifies a complete overhaul of the 1A Gas Turbine Module (GTM) Intake system, with work locations spanning the Intake Engine Room No. One (02-174-1-Q), Engine Room No. One (4-174-0-E), Officer Baggage Room (02-166-7-A), and the Vent Plenum for Natural Exhaust System between Frames 169 and 174 on the starboard side.

The scope of work includes removal and installation of 12 square feet of inner insulation (thermal felt and acoustic materials per MIL-DTL-32585 specifications), repair of a perforated CRES 316L sheet (one piece at 0.063 inch thickness), fabrication and installation of a new airtight transverse bulkhead plate at Frame 174, installation of three CRES 316 stuffing tubes for cable circuits, and recoating of 22 square feet of interior surface where hot work disturbs existing coatings. Government-furnished materials will be provided, and the performing activity (SRF-JRMC) will furnish support services including crane operations, utilities (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and QA inspections marked with (G) symbols. Critical safety requirements mandate fabrication and staging of a non-flammable closure due to the work affecting fire zone boundaries. The document references potential asbestos hazards and identifies critical coated areas (CCNY-DDG86-013-27) requiring specific restoration procedures. Contractor work start and completion dates are referenced to the TGI Period of Performance List. The instruction was prepared by Daisuke Soejima and approved by Noriaki Izumi on 30 April 2026.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0600006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600004 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CC_A01_NEW TGI_c1v1.pdf PDF
Solicitation Amendment N6264926RA0600003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600002 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CH_A01_NEW TGI_c1v1.pdf PDF
Solicitation Amendment N6264926RA0600001 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CC_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312366_A01_NEW TGI_c2v1.pdf PDF
SOW_B-2_CLN-1_38KC312303_A01_NEW TGI_c0v0.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment VI Warranty Tracking Information.pdf PDF
SOW_B-2_CLN-1_38KC312301_A01_NEW TGI_c0v0.pdf PDF
Attachment IV Request for Information Sheet (Fillable).pdf PDF
Exhibit A Contract Data Requirements List (CDRL) IPS.pdf PDF
SOW_B-2_CLN-1_38KC3123CH_A01_NEW TGI_c0v0.pdf PDF
Attachment I POP list BUNDLE-2_Rev2.pdf PDF
SOW_B-2_CLN-1_38KC331104_A01_NEW TGI_c0v0.pdf PDF
Attachment VIII Contract data.pdf PDF
Exhibit B Contract Data Requirements List (CDRL) GFP.pdf PDF
Attachment III DDG-115_BUNDLE1_GFP_List.xlsx XLSX spreadsheet
SOW_B-2_CLN-1_38KC312318_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312302_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123CK_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123CQ_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC313905_A03_NEW TGI_c0v0.pdf PDF
Attachment VII QSAP.pdf PDF
SOW_B-2_CLN-1_38KC3123AY_A01_NEW TGI_c0v0.pdf PDF
Solicitation - N6264926RA060.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
SOW_B-2_CLN-1_38KC3123CT_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312304_A01_NEW TGI_c0v0.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: 1A GTM INTAKE 02 LVL AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-86 USS SHOUP KC3

CU PHASE TITLE:

*F/O - REPAIR 1A GTM INTAKE

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

DAISUKE SOEJIMA 234. 315-243-4480 30 APR 2026

APPROVED BY: CODE PHONE DATE

NORIAKI IZUMI 234. 315-243-2243 30 APR 2026

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: 1A GTM INTAKE 02 LVL AY A 0

FOUO

SHIP: DDG-86 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 Sketch (1)

J1-2 M1-3 Engrg Inst (1- 2)

1. SCOPE/PURPOSE

1.1 Title: 1A Gas Turbine Module (GTM) Intake; repair

1.2 Location of Work:

1.2.1 Intake Engine Room No. One (02-174-1-Q)

1.2.2 Engine Room No. One (4-174-0-E)

1.2.3 Officer Baggage Room (02-166-7-A)

1.2.3.1 Vent Plenum for Natural Exhaust System, Frames between 169 and 174, Starboard (Stbd)

1.3 Identification:

1.3.1 Quantity (12 SF), Inner Insulation, 1A GTM Intake

Thermal Felt Insulation Material: MIL-DTL-32585 Type I, Form 2, Facing A Acoustic Insulation Material: MIL-DTL-32585 Type II, Form 2, Facing D Remarks: See Sketch Enclosure-02 for location details

1.3.2 Quantity (One EA), Perforated Sheet, 1A GTM Intake

Material: CRES 316L, ASTM A240, 0.063 Inch Thickness Remarks: See Sketch Enclosure-02 for location details

1.3.3 Quantity (One Lot), Airtight Transverse Bulkhead Plate Frame 174 in 02-174-1-Q Material: HTS, MIL-S-22698 GR DH-36, 7.65 LBs Plate Remarks: See 2.6 for details

1.3.4 Quantity (3 EA), Stuffing Tube for Ckt: (03-160-2)-1P-A(2)-W35315, (03-160-2)-1P-B(2)-W35316, and C- CS1055 on Airtight Transverse Bulkhead Plate Frame 174 in 02-174-1-Q

Material: CRES 316 Remarks: See 2.7 for details and Engrg Inst Enclosure-01 for location details

1.3.5 Quantity (22 SF), Interior Surface in 02-174-1-Q, where new bulkhead plate is installed and disturbed by the hot work

Remarks: See 2.6 for location details

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.5.2 Critical Coated Area: CCNY-DDG86-013-27 for the area listed in 1.3.5

FOUO

SHIP: DDG-86 CHG/VER: 0/0

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N

3 MP LM19-

KC3123BT-

ES01NP9V

1A GTM FOD PROTECTION FOR

INTAKE REPEAIR

- Y AL

L

4 MIL MIL-

STD-769

Insulation Requirements for U.S.

Naval Vessels

K 1 N

5 DWG 259-

7058622

FAB & INSTL OF GTRB AIR

INTAKE ENG RM NO.1 &ABV

B N

6 PDD 150-

ELM-260183

RPR PLAN OF DEFORMED AT

TRANSV BHD IN INTK ENG

ROOM NO. 1 (S) (02-174-1-Q)

- Y AL

L

7 PDD 300-

ELM-230313

SRF-JRMC STD ELM

INSTALLATION OF STEEL &

CRES STUFFING TUBE

A Y AL

L

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 2.3.

(V)(G) "GAS TURBINE MAINTENANCE PROCEDURE"

5.2 Remove each existing inner insulation listed in 1.3.1, using 2.4 for guidance.

5.3 Accomplish the requirements of 009-011 of 2.1 for installation of each new inner insulation listed in 1.3.1, using

2.5 for guidance.

5.4 Accomplish the repairs for each deficient weld on the perforated sheet listed in 1.3.2, using 2.5 for guidance.

5.4.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) D, Lines One through 7.

5.5 Remove existing, fabricate and install new each bulkhead plate listed in 1.3.3 in accordance with 2.6.

5.5.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.

FOUO

SHIP: DDG-86 CHG/VER: 0/0

5.5.2 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of the bulkhead plate.

Allowable leakage: None.

5.6 Remove existing and install new each stuffing tube listed in 1.3.4 in accordance with 2.7 and Enclosure-01, using 2.6 for guidance.

5.6.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.

5.6.2 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of the stuffing tube.

Allowable leakage: None.

5.7 Accomplish the requirements of 009-032 of 2.1, including Table 3, Line 20 for each area listed in 1.3.5.

5.8 Confirm that all personnel have exited the space prior to closure of the space listed in 1.2.3.1. Designate one person to account for all personnel who may have entered the space.

5.9 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.

5.10 Notes:

5.10.1 Planner: Code 234 D. Soejima, 243-4480

Planner: Code 231A K. Watanabe, 243-4518 Planner: Code 233 T. Saito, 080-9350-1459 Planner: Code 234 M. Hasegawa, 243-2497 Engineer: Code 270 N. Kozaki, 243-1880

5.10.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560.

5.10.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship

5.10.4 JCNs EM01-W127, EM01-W130, ES01-NP9V, ES01-NP9W, ES01-NP9X, ES01-NP9Y and EM01-W153 are related to this TGI.

5.11 Government Furnished Material (GFM):

5.11.1 SRF-JRMC will provide GFM listed in the Appendix “M”.

5.12 SRF-JRMC will provide the following service work: (TGI No. 38KC3123BTS02)

5.12.1 [C740] Crane and crane rigging service.

5.12.2 [X99E] Utility service, electrical.

5.12.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

5.12.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.12.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.12.6 [C133] QA inspection for (G) symbol(s).

FOUO

SHIP: DDG-86 CHG/VER: 0/0

5.12.7 [C285] Provide inspection for (G) Symbol(s).

FOUO

J-1

SHIP: DDG-86 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

1A GTM INTAKE 02 LVL AY A 0 0

CU PHASE TITLE:

*F/O - REPAIR 1A GTM INTAKE

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

#1A GTM INTAKE IT VNT PLNM 02-166-7-A DT CMPT 02-166-7-A MS CMPT 02-174-1-Q

MS

ATTACHMENT LIST:

1. ENCLOSURE-01 (38KC3123BTA01-Engrg Inst.pdf) saved on 28-APR-2026 0000.

2. ENCLOSURE-02 (38KC3123BTA01-Sketch.pdf) saved on 27-APR-2026 0000.

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

38KC3123BT A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to repair 1A GTM intake system.

Location of Work:

Intake Engine Room No. One (02-174-1-Q) Engine Room No. One (4-174-0-E) Officer Baggage Room (02-166-7-A) Vent Plenum for Natural Exhaust System, Frames between 169 and 174, Starboard

FOUO

J-2

SHIP: DDG-86 CHG/VER: 0/0

FOUO

M-1

SHIP: DDG-86 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

1A GTM INTAKE 02 LVL AY A 0 0

CU PHASE TITLE:

*F/O - REPAIR 1A GTM INTAKE

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38KC3123BT A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M SHEET, P, SHEET,

PERFORATED, 4FT X 8FT X

0.063"THK, CRES 316L, ASTM-

A240, 3/16"DIA, PITCH: 3/8" ON

STAGGERED CENTERS

ORDERD FOR KTR

C234 D.SOEJIMA, 243-4480

9B 9515 LL9603130 NA 4 N 61117471 1/SH

002 M INSULATI, INSULATION,

ACOUSTIC, 24" X 36" X 2"THK,

FIBER GLASS, FACED

THERMAL AND SOUND

ABSORBING FELT TYPE, MIL-

DTL-32585 TYPE II FORM 2

FACING D (FORMER SPEC

MIL-I-22023 TY-III),

CLAREMONT MARINE

INSULATION - TUFFSKIN 1613.

DO NOT CROSS NSN 5640-01-

509-0809 SMIC X3.

ORDERED FOR KTR

C234 D.SOEJIMA 243-4480

9Q 5640 LL4808709 NA 4 N 61117472 4/SH

NOTES:

FOUO

M-2

SHIP: DDG-86 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

003 M INSULATI, INSULATION,

THERMAL FELT, 2FT X 3FT X

2"THK, 2.0LB/QFT DENSITY,

FIBROUS GLASS, MIL-DTL-

32585 TYPE I FORM 2 FACING

A (FORMER SPEC MIL-I-22023

TY-I CL-4), 10 SHEETS PER

BOX.

ORDERED FOR KTR

C234 D.SOEJIMA, 243-4480

9Q 5640 LL9005023 NA 4 N 61117473 4/SH

004 M TAPE,PRESSURE SENSI,

ORDERED FOR KTR

C234 D.SOEJIMA, 243-4480

9Q 7510 015406777 NA 4 N 61115209 1/RO

005 M ADHESIVE, ADHESIVE FOR

INTAKE INSULATION

ORDERED FOR KTR

C234 D.SOEJIMA, 243-4480

9B 8040 002738708 NA 4 Y 61115197 1/GL

100 M PLATE,ME, 4 FT X 6 FT PLATE

ORDERED FOR KTR

ORIG:C-231A, WATANABE 243-

9B 9515 002375350 NA 4 N 61115198 24/SF

101 M STUFFING, STUFFING TUBE,

COMPLETE WITH GLAND NUT

AND GLAND RING, FOR

BULKHEAD, SPEC: MIL-S-

24235/18MOD, M24235/18-

002MOD, SIZE: B, LENGTH:

6.75" MATL: CRES 316L,

MODIFY MATERIAL TO CRES-

316L

ORDERED FOR KTR

ORIG:C-231A, WATANABE 243-

9G 5975 LL4940315 NA 4 N 61187400 1/EA

102 M STUFFING, STUFFING TUBE,

COMPLETE WITH GLAND NUT

AND GLAND RING, FOR

BULKHEAD, SPEC: MIL-S-

24235/18MOD, M24235/18-

003MOD, MODIFY MATERIAL

TO CRES-316L, SIZE: C,

LENGTH: 6.75", MATL: CRES-

316L, RT&D P/N: 0C6SSC, *

MINIMUM ORDER QTY: 2EA,

ORDERED FOR KTR

ORIG:C-231A, WATANABE 243-

9B 5975 LL9306462 NA 4 N 61187401 1/EA

103 M STUFFING, STUFFING TUBE,

COMPLETE WITH GLAND NUT

AND GLAND RINIG FOR

BULKHEAD, SPEC: MIL-S-

24235/18MOD, M24235/18-

004MOD, MODIFY MATEIRAL

TO CRES-316L, SIZE: D,

LENGTH: 6.75", MATL: CRES-

316L

ORDERED FOR KTR

ORIG:C-231A, WATANABE 243-

9B 5975 LL9008538 NA 4 N 61187402 1/EA

400 M COUPLING, COUPLING,

1/2"IPS, CU-NI 90/10, SW

ORI: C234, M. HASEGAWA 243-

2497. ORDERED FOR KTR

9B 4730 014635873 NA 4 N 61105039 1/EA

FOUO

M-3

SHIP: DDG-86 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

401 M COUPLING, COUPLING, 1"IPS,

CU-NI 90/10, SW.

ORI: C234, M. HASEGAWA 243-

2497. ORDERED FOR KTR

9B 4730 014635857 NA 4 N 61105042 2/EA

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-86 1A GTM INTAKE 02 LVL AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38KC3123BT A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-86 1A GTM INTAKE 02 LVL AY A 0

38KC3123BTA01 ENCLOSURE-01 Sheet 1 of 2

AutoCAD SHX Text REFERENCES: ASTERISKED (*) REFERENCES ARE NOT REQUIRED FOR PRODUCTION WORK ASTERISKED (*) REFERENCES ARE NOT REQUIRED FOR PRODUCTION WORK *(a). DDG86-481-8920183 "A": MK 38 MOD 4 30MM GUN WEAPON SYSTEM CNSLD ELEC INST & ML MK 38 MOD 4 30MM GUN WEAPON SYSTEM CNSLD ELEC INST & ML *(b). ELM DDG86-150-260183 "-": RPR PLAN OF DEFORMED AT TRANSV BHD IN INTK ENG ROOM NO. 1 (S) (02-174-1-Q) (c). ELM STD-300-230313 "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE STD-300-230313 "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE -300-230313 "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE 300-230313 "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE -230313 "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE 230313 "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE "A": SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE SRF-JRMC STD ELM INSTALLTION OF STEEL & CRES STUFFING TUBE NOTES: 1. ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MIL-STD-2003B(SH). ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MIL-STD-2003B(SH). 2. EXACT STUFFING TUBE INSTALLATION LOCATION SHALL BE DETERMINED AT THE TIME OF INSTALLATION TO SUIT EXACT STUFFING TUBE INSTALLATION LOCATION SHALL BE DETERMINED AT THE TIME OF INSTALLATION TO SUIT TUBE INSTALLATION LOCATION SHALL BE DETERMINED AT THE TIME OF INSTALLATION TO SUIT INSTALLATION LOCATION SHALL BE DETERMINED AT THE TIME OF INSTALLATION TO SUIT CONDITION.

AutoCAD SHX Text_1

%%U ENGRG INST

AutoCAD SHX Text_2

NO

AutoCAD SHX Text_3

ITEM

AutoCAD SHX Text_4

SPEC/MATERIAL

AutoCAD SHX Text_5

REMARKS

AutoCAD SHX Text_6

QTY

AutoCAD SHX Text_7

DESCRIPTION

AutoCAD SHX Text_8

NO

AutoCAD SHX Text_9

ITEM

AutoCAD SHX Text_10

MATERIAL LIST

AutoCAD SHX Text_11

NSN/MATL

AutoCAD SHX Text_12

AutoCAD SHX Text_13

AutoCAD SHX Text_14

AutoCAD SHX Text_15

KEY PLAN

AutoCAD SHX Text_16

AutoCAD SHX Text_17

1 EA

AutoCAD SHX Text_18

STUFFING TUBE, SIZE D, LG=6.75", SIZE D, LG=6.75"D, LG=6.75", LG=6.75"6.75"

AutoCAD SHX Text_19 P/N: 0D6SSC : 0D6SSC D6SSC SSC C CAGE: 63044 or EQL63044 or EQL

AutoCAD SHX Text_20

1 EA

AutoCAD SHX Text_21

STUFFING TUBE, SIZE C, LG=6.75", SIZE C, LG=6.75"C, LG=6.75", LG=6.75"6.75"

AutoCAD SHX Text_22 P/N: 0C6SSC : 0C6SSC C6SSC SSC CAGE: 63044 or EQL63044 or EQL

AutoCAD SHX Text_23

1 EA

AutoCAD SHX Text_24

STUFFING TUBE, SIZE B, LG=6.75", SIZE B, LG=6.75"B, LG=6.75", LG=6.75"6.75"

AutoCAD SHX Text_25

CRES316

AutoCAD SHX Text_26

MIL-S-24235/18

AutoCAD SHX Text_27 P/N: 0B6SSC : 0B6SSC B6SSC SSC C CAGE: 63044 or EQL63044 or EQL

AutoCAD SHX Text_28

INTAKE ENG ROOM NO. 1 (STBD)

AutoCAD SHX Text_29 02-174-1-Q

AutoCAD SHX Text_30

OFFICER BAGGAGE ROOM

AutoCAD SHX Text_31 02-166-7-A

AutoCAD SHX Text_32

STFG TUBE (3 EA)

AutoCAD SHX Text_33

SEE SECT 2-A FOR INSTL

AutoCAD SHX Text_34

AutoCAD SHX Text_35

AutoCAD SHX Text_36

AutoCAD SHX Text_37

AutoCAD SHX Text_38

AutoCAD SHX Text_39

AutoCAD SHX Text_40

AutoCAD SHX Text_41

AutoCAD SHX Text_42

REF LINE

AutoCAD SHX Text_43

02 LVL

AutoCAD SHX Text_44

FWD

AutoCAD SHX Text_45

HSE SIDE (S)

AutoCAD SHX Text_46

WEATHER

AutoCAD SHX Text_47

02 LVL

AutoCAD SHX Text_48

STBD SIDE

AutoCAD SHX Text_49

-SCALE NONE-

38KC3123BTA01 ENCLOSURE-01 Sheet 2 of 2

AutoCAD SHX Text_50

%%U ENGRG INST

AutoCAD SHX Text_51

CKT C-CS1055

AutoCAD SHX Text_52 SEE REF (c) FOR INSTL

AutoCAD SHX Text_53

AutoCAD SHX Text_54

LOC TO SUIT

AutoCAD SHX Text_55

INSTL

AutoCAD SHX Text_56

STFG TUBE FOR CABLE

AutoCAD SHX Text_57

CKT (03-160-2)-1P-A(2)-W35315

AutoCAD SHX Text_58 SEE REF (c) FOR INSTL

AutoCAD SHX Text_59

AutoCAD SHX Text_60

LOC TO SUIT

AutoCAD SHX Text_61

INSTL

AutoCAD SHX Text_62

STFG TUBE FOR CABLE

AutoCAD SHX Text_63

CKT (03-160-2)-1P-B(2)-W35316

AutoCAD SHX Text_64 SEE REF (c) FOR INSTL

AutoCAD SHX Text_65

AutoCAD SHX Text_66

LOC TO SUIT

AutoCAD SHX Text_67

INSTL

AutoCAD SHX Text_68

STFG TUBE FOR CABLE

AutoCAD SHX Text_69

MIN 2" (TYP)(TYP)TYP))

AutoCAD SHX Text_70

MIN 3"

AutoCAD SHX Text_71

MIN 3"

AutoCAD SHX Text_72

SECT 2-A

AutoCAD SHX Text_73

RPR OF AT TRNSV BHD

AutoCAD SHX Text_74 BY REF (b)

AutoCAD SHX Text_75

PLATE 7.65# HS

AutoCAD SHX Text_76 L-13 (S)

AutoCAD SHX Text_77

03 LVL

AutoCAD SHX Text_78 L-12 (S)

AutoCAD SHX Text_79

STFG TUBE

AutoCAD SHX Text_80

(EXST)

AutoCAD SHX Text_81

PIPE PEN

AutoCAD SHX Text_82

(EXST)

AutoCAD SHX Text_83

STFG TUBE 3 EA

AutoCAD SHX Text_84

TRNSV BHD, FR 174

AutoCAD SHX Text_85

STBD, LKG FWD

AutoCAD SHX Text_86

-SCALE : NONE-

AutoCAD SHX Text_87

INSTL

AutoCAD SHX Text_88

MIN 3"

FINDINGS:

1. MISSING INSULATION BEHIND PERFORATE SHEET ON BHD IN CLEAN SIDE AS FOLLOWING 3 PANELS.

-1A, LONG BHD (25 FEET 10 5/8 INCH STBD OFF CL) FR.185: 1 PANEL, 2 SQFT

-1B, CORNER OF STBD FWD SIDE, LONG BHD AND TRANSV BHD FR.174: 2 PANELS, 2 SQFT IN TOTAL.

ES01-NP9V

2. BROKEN TACK WELD OF PERFORATE SHEATHING ON AT LONG BHD (2 EA) CLEAN SIDE. ES01-NP9W

FWD

1A 1A 1B 1B

Daisuke.Soejima.ja Rectangle

Daisuke.Soejima.ja_1 Line

Daisuke.Soejima.ja_2 Line

Daisuke.Soejima.ja_3 Line

Daisuke.Soejima.ja_4 Text Box

FWD

Daisuke.Soejima.ja_5 Text Box 1B

Daisuke.Soejima.ja_6 Text Box 1B

Daisuke.Soejima.ja_7 Text Box

38KC3123BTA01

Daisuke.Soejima.ja_8 Text Box Sketch

Daisuke.Soejima.ja_9 Text Box

ENCLOSURE-02

Daisuke.Soejima.ja_10 Text Box Sheet 1 of 1

Daisuke.Soejima.ja_11 Line

Daisuke.Soejima.ja_12 Text Box Listed in 1.3.1

Daisuke.Soejima.ja_13 Text Box Listed in 1.3.1

Daisuke.Soejima.ja_14 Text Box Listed in 1.3.2

File details come from the government source that posted it. Updated .