Attachment VII QSAP.pdf

PDF 395 KB Posted

Attached to
USS SHOUP (DDG-86) 7C1 SRA BUNDLE-2
Solicitation number
N6264926RA060
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the USS SHOUP (DDG-86) FY27 Surface Incremental Availability (SIA) Bundle #2, issued under solicitation N6264926RA060 by the Department of the Navy.

The QASP establishes performance criteria, standards, and procedures for Government oversight of contractor performance to ensure deliverables are timely, adequate, and complete. The Administrative Contracting Officer (ACO) maintains ultimate responsibility for determining adequacy of contractor performance, while the Project Manager/Contracting Officer Representative (PM/COR) provides technical administration and maintains a quality assurance file. Surveillance methods include direct on-site observation, verification of deliverables, and inspections as needed. Performance is rated as either acceptable or unacceptable based on standards outlined in Enclosure (1), with continuous monitoring and periodic frequency assessment.

Enclosure (1) specifies five primary performance standards: (1) Schedule and Associated Reports per NAVSEA Standard Item 009-60, requiring submission of Initial Integrated Production Schedule, Schedule of Record, Weekly IPS, and 25/50/75 Percent Conference Support deliverables in accordance with NSI 009-60 content and format requirements; (2) Corrective Action Requests (CARs) requiring response by specified dates with complete and adequate resolution; (3) Accuracy of Condition Found Reports (CFRs) submitted via hard copy or approved electronic media containing required information per contract specifications; (4) Letters of Concern (LOCs) and Letters of Direction (LODs) requiring timely response and adequate resolution; and (5) Cure Notices and Show Cause Notices requiring contractor response by specified dates with complete and adequate resolution in accordance with FAR 49.402-3.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0600006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600003 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CC_A01_NEW TGI_c1v1.pdf PDF
Solicitation Amendment N6264926RA0600002 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CH_A01_NEW TGI_c1v1.pdf PDF
Solicitation Amendment N6264926RA0600001 SF 30.pdf PDF
Attachment I POP list BUNDLE-2_Rev2.pdf PDF
SOW_B-2_CLN-1_38KC3123CC_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123BT_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123AY_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC313905_A03_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312302_A01_NEW TGI_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment IV Request for Information Sheet (Fillable).pdf PDF
Attachment IV Request for Information Form.docx DOCX document
SOW_B-2_CLN-1_38KC3123CK_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123CQ_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312301_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC331104_A01_NEW TGI_c0v0.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
Exhibit A Contract Data Requirements List (CDRL) IPS.pdf PDF
SOW_B-2_CLN-1_38KC312366_A01_NEW TGI_c2v1.pdf PDF
SOW_B-2_CLN-1_38KC3123CT_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312304_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123CH_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312303_A01_NEW TGI_c0v0.pdf PDF
Solicitation - N6264926RA060.pdf PDF
Attachment III DDG-115_BUNDLE1_GFP_List.xlsx XLSX spreadsheet
Attachment VIII Contract data.pdf PDF
Exhibit B Contract Data Requirements List (CDRL) GFP.pdf PDF
SOW_B-2_CLN-1_38KC312318_A01_NEW TGI_c0v0.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

DEPARTMENT OF THE NAVY

Quality Assurance Surveillance Plan (QASP)

For

USS SHOUP (DDG-86)

FY27 Surface Incremental Availability (SIA)

BUNDLE #2

Solicitation: N6264926RA060

Attachment VI

1. Purpose

This QASP provides the performance criteria, standards, and procedures for the Government’s surveillance and oversight of the Contractor’s performance to assure deliverables are timely, adequate, and complete and to assure performance is meeting the requirements specified in the contract.

2. Government Roles and Responsibilities

The following personnel shall oversee and coordinate surveillance activities:

a. Administrative Contracting Officer (ACO) – The ACO shall assure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The ACO shall also assure the contractor receives impartial, fair, and equitable treatment under this contract. The ACO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

b. Project Manager (PM) / Contracting Officer Representative (COR) – The PM/COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The PM/COR shall keep a quality assurance file. The PM/COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

3. Performance Standards

The performance and acceptable quality level standards are listed in Enclosure (1). The Government shall use these standards to assess contractor performance.

4. Methods of Surveillance

Various methods exist to monitor performance. The Government may use, and is not limited to, the surveillance methods listed below in the administration of this QASP:

a. Direct Observation: The ACO and/or PM/COR will provide on-site oversight to assure the Contractor is adequately performing to the contract specifications.

b. Verification of documentation/deliverables provided by Contractor: Government review and assessment of deliverables (timely submission, accuracy, and completeness) and performance will be accomplished in accordance with the contract/order.

c. Inspections: Other inspections may be made in cases such as accident investigations, etc.

Inspections shall be divided and scheduled as required.

5. Evaluation Ratings

The Government will evaluate the Contractor’s performance of the contract/order and the PM/COR will assign a rating of either acceptable or unacceptable. The acceptable quality levels are outlined in Enclosure (1).

6. Documenting Performance

The Government will document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing past performance information using the Contractor Performance Assessment Report System (CPARS).

7. Frequency of Measurement

Frequency of Measurement. The frequency of measurement for deliverables is defined in the contract/order. The contractor’s performance will be continuously monitored. The Government will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

Enclosure (1): Performance Standards & Acceptable Quality Levels

A) Deliverable/ Assessment Area

B) Performance / Acceptable Quality Level Requirement

1. Schedule and Associated Reports per NAVSEA Standard Item (NSI) 009-60

a) The Contractor is required to submit the following reports (hereinafter referred to as deliverables), in accordance with the schedule requirements stated in NSI 009-60 Tables 2 and 3 to support the milestones identified in Section F of the Contract:

1. Initial Integrated Production Schedule (IPS)

2. Schedule of Record

3. Weekly IPS

4. 25 Percent Conference Support

5. 50 Percent Conference Support

6. 75 Percent Conference Support

b) Deliverables shall be provided in accordance with the content and format requirements stated in NSI 009-60.

Notes:

i. If the Government does not provide schedules/information for Alteration Installation Team, Government-Contracted Third Party Maintenance Providers, Ship’s Force, Commercial Industrial Services, Fleet Maintenance Activity, or other schedules/information not known to the contractor, the contractor shall provide the schedule and associated reports (including the IPS) in the required timeframes to include all information known to the contractor up to 7 days prior to the date of required submission.

ii. Should the supervisor and the contractor disagree as to whether an element within NSI 009-60 is objectively required or discretionary, the supervisor will provide direction and/or clarification, which will take effect on the next required submission of the NSI 009-60 deliverable.

iii. Rejection or acceptance of a NSI 009-60 deliverable will be determined on whether:

a. The deliverable provided conforms to the schedule, content and format requirements in NSI 009-60; and

b. The deliverable provided conforms to the Supervisor’s direction and/or clarification of any disputed objective/discretionary elements.

Enclosure (1): Performance Standards & Acceptable Quality Levels

2. Corrective Action Requests (CARs)

a) The Contractor shall respond to Method C and Method D CARs by the required response date in each respective CAR.

b) The Contractor’s response/resolution to a Method C or Method D CAR is complete and adequate.

3. Accuracy of Condition Found Reports (CFRs)

a) CFRs shall be submitted via hard copy or approved electronic media to SRF-JRMC after discovery of the condition and at a minimum, contain the information required by Section C Paragraph C-3.1 of the contract/order and NSI 009-01.

4. Letters of Concern (LOCs) and Letters of Direction (LODs)

a) The Contractor shall respond to LOCs and LODs issued by the ACO for failure to meet a requirement of the contract/order by the required response date identified in each respective LOC or LOD.

b) The Contractor’s response/resolution to a LOC or LOD issued by the ACO for failure to meet a requirement of the contract/order is complete and adequate.

5. Cure Notices and Show Cause Notices

a) In accordance with FAR 49.402-3Procedure for default, the Contractor shall respond to cure notices and show cause notices by the required response date identified in each respective notice.

b) The Contractor’s response/resolution to a cure notice or show cause notice is complete and adequate.

File details come from the government source that posted it. Updated .