SOW_B-2_CLN-1_38KC313905_A03_NEW TGI_c0v0.pdf
PDF 151 KB Posted
- Attached to
- USS SHOUP (DDG-86) 7C1 SRA BUNDLE-2
- Solicitation number
- N6264926RA060
About this file
This is a WebAIM Short Form Task Group Instruction (TGI) for naval maintenance work on the USS Shoup (DDG-86). The document details machining work on the radome mounting surface of Antenna 3-30A's foundation, located at 05 Level Weather, Frames 133-140, Starboard.
The scope requires machining a steel radome foundation (MIL-S-22698, Grade DH-36, 6 feet 7-1/16 inch outer diameter) to achieve proper flatness, surface finish, levelness, and parallelism per referenced drawing Sheet 11 and General Notes 31B. The foundation must maintain a minimum thickness of 1/2 inch after machining. The contractor must inspect thickness, flatness, surface finish, and parallelism, then submit one legible copy of inspection results in hard copy or approved transferable media to the supervisor. All new and disturbed surfaces require surface treatment per specification 009-032. Supporting service work includes crane and rigging services, electrical utilities, low-pressure air/water/steam supply, safety inspections, gas-free inspections, and QA inspection for items marked with (G) symbols. Related TGIs cover roller path inclination verification, foundation installation, and bolt hole drilling. The Work Integration Manager is T. Yaginuma (Code 333), with planners identified as T. Iikura (Code 232), R. Yajima (Code 231A), and S. Nakajima (Code 233). Contractor work start and completion dates are referenced in the TGI Period of Performance (POP) List. No government-furnished material is provided.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
15-MAY-2026 1303
20.15.6.0.9333 (July 2025) ICN: 38KC313905 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CW-1268/WSC-9 #3-30A FD A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 44171
CU PHASE TITLE: F/O - MACHINE RADOME MTG SURFACE OF ANT 3-30A RADOME FDN, 05 LVL FR 133-140 STBD
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
ES01NP83
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
IIKURA, TOSHIAKI 232 3152432374 17-APR-2026
APPROVED BY: CODE: PHONE: DATE:
MOMOSE, HARUHISA 232 3152434533 18-APR-2026
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NP83
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 05 LVL WEA 05 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
139A0005
1. SCOPE/PURPOSE:
1.1 Title: Radome Mounting Surface of Antenna 3-30A Radome Foundation; machine
1.2 Location of Work:
1.2.1 05 Level Weather, Frames Between 133 and 140, Starboard
1.3 Identification:
1.3.1 Quantity (One EA), Radome Foundation of X/KA Antenna No. 3-30A Size: 6 feet 7-1/16 inch O.D.
Material: Steel, MIL-S-22698, Grade DH-36 Remarks: See Item No. A001 of Ref. No. 3 for details.
1.4 Security Classification: None.
TGI Short Form
15-MAY-2026 1303
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC313905 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CW-1268/WSC-9 #3-30A FD A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 44171
CU PHASE TITLE: F/O - MACHINE RADOME MTG SURFACE OF ANT 3-30A RADOME FDN, 05 LVL FR 133-140 STBD
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
1.5 Initial Condition: None.
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. PROCEDURE:
2.1 Accomplish the following machinery work for the foundation listed in 1.3.1 in accordance with Ref. No. 3.
2.1.1 Machine the radome mounting surface of the foundation listed in 1.3.1 to obtain proper flatness, surface finish, levelness and parallelism in accordance with Sheet 11 and GENERAL NOTES 31B of Ref. No. 3. Minimum thickness of the foundation must be 1/2 inch minimum after machining.
2.1.2 Inspect thickness, flatness, surface finish and parallelism of the foundation in accordance with Ref. No. 3.
2.1.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing result of the requirements of
2.1.2 to the SUPERVISOR.
2.2 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 232 T. Iikura, 243-2374
Planner: Code 231A R. Yajima, 243-2791 Planner: Code 233 S. Nakajima, 080-9350-1433
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 Meeting will be held between the contractor and Shop X67W in order to coordinate the schedule of this TGI.
2.3.4 Exact milling initial data for installation of the foundation which is designated in referenced drawing will be provided by Shop X67W.
2.3.5 Roller path inclination verification of the foundation will be covered by TGI No. 38KC313905A02 (SRF-JRMC TGI).
2.3.6 Installation of the foundation will be covered by TGI No. 38KC313905A01 (SRF-JRMC TGI).
2.3.7 Drilling of the bolt holes in the foundation will be covered by TGI No. 38KC313905A04 (SRF-JRMC TGI).
2.3.8 WPC will copy the following selected pages of reference;
Ref. No. 3: Sheet 1, 1A, 2, 10 thru 13, 20
2.3.9 JCN ES01-NP83 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38KC313905S02)
15-MAY-2026 1303
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC313905 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CW-1268/WSC-9 #3-30A FD A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 44171
CU PHASE TITLE: F/O - MACHINE RADOME MTG SURFACE OF ANT 3-30A RADOME FDN, 05 LVL FR 133-140 STBD
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.5.1 [C740] Crane and crane rigging services.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) Symbol(s).
15-MAY-2026 1303
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC313905 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CW-1268/WSC-9 #3-30A FD A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC3 44171
CU PHASE TITLE: F/O - MACHINE RADOME MTG SURFACE OF ANT 3-30A RADOME FDN, 05 LVL FR 133-140 STBD
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N
3 DWG 180-8790146 S/A DDG-51-80897 NMT
AN/WSC-9(V)2 Q/KA/X/GBS
STRL ADE FDN MODS & ML
A Y SE
E
NO
TE
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC313905 KEY OP: A03